Admin Site & Arch - 2008September 10, 2008
Mr. Vince Stryker
1549 Walnut Drive
Campbell, CA 95008
Re: Administrative Site & Architectural Review Permit
File No: PLN2008-117 -1549 Walnut Drive
Dear Mr. Stryker,
The Community Development Director has conditionally approved your Administrative Site &
Architectural Review Permit on September 8, 2008 to allow a 378 square foot addition and an
attached 256 square foot covered porch to an existing single-family residence located at 1549
Walnut Drive in the R-1-10 (Single Family Residential) Zoning District. This approval is based
upon the attached findings and is subject to the attached conditions of approval.
This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5:00
p.m. on September 18, 2008.
Please note that a signed copy (by the property owner) of the attached Conditions of Approval
must be received by the Planning Division within thirty days (by October 8, 2008) of the
Community Development Director's decision.
If you should have any questions regarding this approval, please do not hesitate to contact me
at (408) 866-2144 or by email at timhC~??city ofcampbell.com
Sincerely
Tim J. Haley
Senior Planner
cc: Jackie Young, Principal Planner
Frank Mills, Senior Building Inspector
Attachment #2
Page ] of 2
CONDITIONS OF APPROVAL FOR FILE NO. PLN2008-117
SITE ADDRESS: 1549 Walnut Drive
APPLICANT: Vince Stryker
DATE: September 8, 2008
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each condition
where necessary. Where approval by the Director of Community Development, City Engineer,
Public Works Director, City Attorney, or Fire Department is required, that review shall be for
compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances,
laws and regulations, and accepted engineering practices, for the items under review. Additionally,
the applicant is hereby notified that (s)he is required to comply with all applicable Codes or
Ordinances of the City of Campbell and the State of California that pertain to this development and
are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division:
1. Declaration of Acceptance of All Conditions: Within thirty (30) days of the effective date of the
Community Development Director's approval, the applicant shall sign the final, approved set of
Conditions of Approval. Until said Conditions are signed, the proposed Administrative Site and
Architectural Review Permit shall not be valid for any permits sought from the City.
Ac o ledged & Acc pted:
~''c,-~j'' -/ S -,~'
Vincent Stryker Date
2. Approved Project: Approval is granted for an Administrative Site and Architectural Review
Permit (PLN2008-117) for a single family residence addition located at 1495 Walnut Drive. The
project shall substantially conform to the project plans stamped as received by the Community
Development Department on August 4, 2008, except as may be modified by the conditions of
approval herein.
3. Planning Final Required: Planning sign off is required to prior to Building Permit final.
Construction not in substantial compliance with the approved project plans shall not be
approved without prior authorization of the necessary approving body
4. Site and Architectural Review Permit Approval Expiration: The Administrative Site and
Architectural Review Permit approval shall be valid for one year from the date of final approval.
Within this one-year period a building permit must be obtained and construction completed one
year thereafter or the use must be established on the property and all conditions of approval
fulfilled (if no building permit is required). Failure to meet these deadlines will result in the
Administrative Architectural Site and Review Permit being void.
Attachment #2
Page 3 of 4
~. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Section ? .l 8.060 of
the Campbell Municipal Code and shall be submitted for review and approval by the
Community Development Department.
6. Compliance with Other Regulations: The applicant shall comply with other state, county, and
city ordinances that pertain to the proposed project and where they are conducted.
7. Contractor Contact Information Posting: The project site shall be posted with the name and
contact number of the lead contractor in a location visible from the public street prior to the
issuance of building permits.
8. On-Site Lighting On-site lighting shall be shielded away from adjacent properties and directed
on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior
lighting for the project shall be reviewed and approved by the Community Development
Director prior to installation of the lighting for compliance with all applicable Conditions of
Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to
be compatible with the residential development and shall incorporate energy saving features.
The applicant shall submit a detail of the proposed rear lighting fixtures (cut-sheet) for review
and approval by the Community Development Director.
9. Roof Vents: The applicant shall coordinate mechanical and plumbing plans to minimize the
number of roof vents that are visible from the street frontage. The applicant shall provide the
location of such vents on the building plan elevations and roof plans, to the satisfaction of the
Community Development Director, prior to issuance of a building permit.
10. Construction Activities: The applicant shall abide by the following requirements during
construction:
a. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and
Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or
holidays unless an exception is granted by the Building Official.
b. All construction equipment with internal combustion engines used on the project site shall
be properly muffled and maintained in good working condition.
c. Unnecessary idling of internal combustion engines shall be strictly prohibited.
d. All stationary noise-generating construction equipment, such as air compressors and
portable power generators, shall be located as far as possible from noise-sensitive receptors
such as existing residences and businesses.
e. Use standard dust and erosion control measures that comply with the adopted Best
Management Practices for the City of Campbell.
Attachment #2
Page 3 of 4
Buildin; Division:
l 1. Permits Required A building permit application shall be required for the proposed residential
addition. The building permit shall include Electrical/Plumbing/Mechanical fees when such
work is part of the permit.
12. Construction Plans: The conditions of Approval shall be stated in full on the cover sheet of
construction plans submitted for building permit.
13. Size of Plans: The minimum size of construction plans submitted for building permits shall be
24 in. X 36 in.
14. Plan Preparation: This project requires plans prepared under the direction and oversight of a
California licensed Engineer or Architect. Plans submitted for building permits shall be "wet
stamped" and signed by the qualifying professional person.
15. Soils Report: Two copies of a current soils report, prepared to the satisfaction of the Building
Official, containing foundation and retaining wall design recommendations shall be submitted
with the building permit application. This report shall be prepared by a licensed engineer
specializing in soils mechanics.
16. Site Plan: Application for building permit shall include a competent site plan that identifies
property and proposed structures with dimensions and elevations as appropriate. Site plan shall
also include site drainage details. This plan shall be prepared by and signed by a licensed civil
engineer
17. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land surveyor
shall be submitted to the project building inspector upon foundation inspection. This certificate
shall certify compliance with the recommendations as specified in the soils report and the
building pad elevation and on-site retaining wall locations and elevations are prepared according
to approved plans. Horizontal and vertical controls shall be set and certified by a licensed
surveyor or registered civil engineer for the following items:
a. pad elevation
b. finish floor elevation (first floor)
c. foundation corner locations
18. Title 24 Energy Compliance: California Title 24 Energy Compliance forms CF-1R and MF-1R
shall be blue-lined on the construction plans. 8.5 X 11 calculations shall be submitted as well.
19. Special Inspections: When a special inspection is required by C.B.C. Section 1704, the architect
or engineer of record shall prepare an inspection program that shall be submitted to the Building
Official for approval prior to issuance of the building permits, in accordance with C.B.C
Appendix 1, Section 106. Please obtain City of Campbell, Special Inspection forms from the
Building Inspection Division Counter.
20. Non~oint Pollution Control Program: The City of Campbell, standard Santa Clara Valley Non-
point Source Pollution Control Program specification sheet shall be part of plan submittal. The
specification sheet (size 24" X 36") is available at the Building Division service counter.
Attachment #2
Page 3 of 4
21. Approvals Required: The project requires the following agenc~~ approval prior to issuance of
the building permit:
a. West Valley Sanitation District (378-2407)
b. Santa Clara County Fire Department (378-4010)
c. School District:
i) Campbell Union School District (378-3405)
ii) Campbell Union High School District (371-0960)
iii) Moreland School District (379-1370)
iv) Cambrian School District (377-2103)
Note: To determine your district, contact the offices identified above. Obtain the School
District payment form from the City Building Division, after the Division has approved
the building permit application.
d. Bay Area Air Quality Management District (demolitions only)
22. P.G.&E: Applicant is advised to contact Pacific Gas and Electric Company as early as possible
in the approval process. Service installations, changes and/or relocations may require substantial
scheduling time and can cause significant delays in the approval process. Applicant should also
consult with P.G.&E concerning utility easements, distribution pole locations and required
conductor clearances.
23. Construction Fencing: This project shall be properly enclosed with construction fencing to
prevent unauthorized access to the site during construction. The construction site shall be
secured to prevent vandalism and/or theft during hours when no work is being done. All
protected trees shall be fenced to prevent damage to root systems.
24. Build it Green: Applicant shall complete and submit a `Build it Green" inventory of the
proposed new single family project prior to the issuance of a building permit.