Loading...
Admin Site & Arch - 2007November 15, 2007 Ms. Emily Chen The E & H 3rd FLP 21009 Seven Springs Parkway Cupertino, CA 95014 Re: Administrative Site & Architectural Review Permit File No: PLN2007-124 ~ 1635 Westmont Avenue Dear Ms. Chen: The Community Development Director has conditionally approved your Administrative Site & Architectural Review Permit for a first floor addition to an existing single-family residence located at 1635 Westmont Avenue in the R-1-6 (Single Family Residential) Zoning District. This approval is based upon the attached findings and is subject to the attached Conditions of Approval. This action is effective in ten calendar days from the date of approved, unless appealed in writing to the City Clerk by 5:00 p.m. on November 22, 2007. If you should have any questions regarding this approval, please do not hesitate to contact me at (408) 866-2142 or by email at stevep@cityofcampbell.com. Sincerely, Steve Prosser Planner I encl: Findings and Conditions of Approval for File No. PLN2007-124 cc: Jackie C. Young Lind, Acting Community Development Director Al Oxonian, Senior Civil Engineer Attachment # 1 Page 1 of 2 RECOMMENDED FINDINGS FOR APPROVAL OF FILE NO. PLN2007-124 SITE ADDRESS: 1635 Westmont Ave. APPLICANT: Emily Chen DATE: November 12, 2007 Findings for approval of an Administrative Site and Architectural Review Permit to allow an 895 square foot first-story addition to an existing one-story single-family residence located at 1635 Westmont Avenue. The Community Development Director finds as follows with regard to File No. PLN2007- 127: 1. The density of the proposed project site is 5.03 units per gross acre, which is consistent with the General Plan land use designation of Low Density Residential (less than 6 units per gross acre). 2. The proposed project is consistent with the R-1-6 (Single-Family Residential, 6,000 square foot minimum lot size) Zoning District and meets the minimum setbacks, height restriction, building coverage, floor area ratio, and parking requirements of the R-1-6 Zoning District. 3. The project is consistent with the development standards and design guidelines of the San Tomas Area Neighborhood Plan. 4. The home consists of a 2,410 square foot one-story single-family residence, with a lot coverage of 40%, and a floor area ratio of .40. 5. The project provides two covered parking spaces in a 2-car garage, where a minimum of one covered and one uncovered parking space is required. 6. The height of the home is 15' 8", where the maximum height limit is 28'. 7. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood. 8. The proposed project includes 5 existing trees to be preserved which satisfies the minimum STAND tree requirement. 9. The proposed residence incorporates representative architectural features of homes in the San Tomas Neighborhood including simple rectangular shaped forms, hipped and gabled roofs, composition roofing, horizontal siding, and an attached garage. Attachment #1 Page 2 of 2 10. The subject property is located on Westmont Avenue between Harriet Avenue and Silacci Drive. The property is surrounded by single-family residences to the north, south, east, and west. 11. The project qualifies as Categorically Exempt under Section 15301, Class 1 of the California Environmental Quality Act (CEQA) pertaining to the construction of additions to existing dwellings. Based upon the foregoing findings of fact, the Community Development Director further finds and concludes that: 1. The proposed project is allowed within the applicable zoning district with Administrative Site and Architectural Review Permit approval, and complies with all other applicable provisions of this Zoning Code and the Municipal Code. 2. The proposed project is consistent with the City of Campbell General Plan. 3. The proposed project, as conditioned, will aid in the harmonious development of the immediate area. 4. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood. 5. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required conditions of approval, will have a significant adverse impact on the environment. 6. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 7. The proposed project will contribute to the housing stock in the City of Campbell and serve the housing needs of the community. 8. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 9. There is a reasonable relationship and a rough proportionality between the conditions of approval and the impacts of the project. Attachment #2 Page 1 of 5 CONDITIONS OF APPROVAL FOR FILE NO. PLN2007-1270 SITE ADDRESS: 1635 Westmont Ave. APPLICANT: Emily Chen DATE: November 12, 2007 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: 1. Declaration of Acceptance of All Conditions: Within thirty (30) days of the Community Development Director's approval, the applicant shall sign the final, approved set of Conditions of Approval. Until said Conditions are signed, the proposed Administrative Site and Architectural Review Permit shall not be valid for any permits sought from the City. 2. AQproved Project: Approval is granted for an Administrative Site and Architectural Review Permit (PLN2007-124) for an addition to a one-story, single family residence located at 1635 Westmont Avenue. The project shall substantially conform to the revised project plans and color board stamped as received by the Community Development Department on November 5, 2007, except as may be modified by the conditions of approval herein.* • Planning sign off is required to prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. 3. Site and Architectural Review Permit Approval Expiration: The Administrative Site and Architectural Review Permit approval shall be valid for one year from the date of final approval. Within this one-year period a building permit must be obtained and construction completed one year thereafter or the use must be established on the property and all conditions of approval fulfilled (if no building permit is required). Failure to meet these deadlines will result in the Administrative Architectural Site and Review Permit being void. 4. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Section 21.18.060 of the Campbell Municipal Code and shall be submitted for review and approval by the Community Development Department. Attachment #2 Page 2 of 5 5. Compliance with Other Regulations: The applicant shall comply with other state, county, and city ordinances that pertain to the proposed project and where they are conducted. 6. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor and the City's approved hours of construction in a location visible from the public street prior to the issuance of building permits. 7. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 8. Roof Vents: The applicant shall coordinate mechanical and plumbing plans to minimize the number of roof vents that are visible from the street frontage. The applicant shall provide the location of such vents on the building plan elevations and roof plans, to the satisfaction of the Community Development Director, prior to issuance of a building permit. 9. Construction Activities: The applicant shall abide by the following requirements during construction: a. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. b. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. c. Unnecessary idling of internal combustion engines shall be strictly prohibited. d. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. e. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. Building Division: 10. Permits Required: A building permit application shall be required for the proposed structure. The building permit shall include Electrical, Mechanical, and/or Plumbing fees when such work is part of the permit. 11. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. Attachment #2 Page 3 of 5 12. Construction Plans: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 13. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 14. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. 15. Title 24 Ener~~pliance: California Title 24 Energy Compliance forms CF-1R and MF- 1R shall be blue-lined on the construction plans. 8.5 X 11 calculations shall be submitted as well. 16. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 17. Non-point Pollution Control Program: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 18. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (379-1370) iv) Cambrian School District (377-2103) Note: To determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. 19. P.G. & E: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G.&E concerning utility easements, distribution pole locations and required conductor clearances. Attachment #2 Page 4 of 5 20. Intent to Occupy During Construction: Owners shall declare their intent to occupy the dwelling during construction. The Building Inspection Division may require the premises to be vacated during portions of construction because of substandard and unsafe living conditions created by construction. Public Works Department: 21. Plan Lines: Prior to issuance of any grading or building permits for the site, the applicant shall provide a plan layout showing the correct street dimensions (dimension widths of entire street and dimension from property line to centerline of roadway), and existing street improvement dimensions (sidewalk, curb, gutter, etc.) and other relevant information in the public right of way. 22. Proof of Ownership: Prior to issuance of any grading, drainage, or building permits for the site, the applicant shall provide a current Preliminary Title Report, grant deed, or other satisfactory proof of ownership. 23. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee of $2,120.00 per net acre, which is $292.00. 24. Utilities: All new on-site utilities shall be installed underground per Section 21.18.140 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. 25. Water Meter(s) and Sewer Cleanout(s): Existing and proposed water meter(s) and sewer cleanout(s) shall be relocated or installed on private property behind the public right-of--way line. 26. Utility Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services are to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for new utilities shall be used whenever possible. Every effort should be made to use the existing utility services to the property. Westmont Avenue was reconstructed to full depth in 2004. Should the newly reconstructed street need to be cut for any utility or underground installation, substantial pavement restoration will be required. Streets that have reconstructed or overlaid within the past five (5) years will also require boring and jacking for any utility service connections. 27. Pavement Restoration: Based on the utility coordination plan, the applicant shall prepare a pavement restoration plan for approval by the City Engineer prior to any utility installation or abandonment. Streets that have been reconstructed or overlaid within the previous five years will require boring and jacking for all new utility installations. Since Westmont Avenue was Attachment #2 Page 5 of 5 reconstructed to full depth in 2004, a detailed pavement restoration plan indicating how the full depth street pavement shall be restored following any street cuts shall be provided by the applicant for review and approval by the City Engineer. 28. Utility Encroachment Permit: Separate permits for the installation of utilities to serve the development will be required (including water, sewer, gas, electric, etc.). Applicant shall apply for and pay all necessary fees for utility permits for sanitary sewer, gas, water, electric and all other utility work. 29. Additional Street Improvements: Should it be discovered after the approval process that new utility main lines, extra utility work or other work is required to service the development, and should those facilities or other work affect any public improvements, the City may add conditions to the development/project/permit, at the discretion of the City Engineer, to restore pavement or other public improvements to the satisfaction of the City. 30. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District requirements, and the Campbell Municipal Code regarding Stormwater pollution prevention. The primary objectives are to improve the quality and reduce the quantity of Stormwater runoff to the bay. Resources to achieve these objectives include Stormwater Best Management Practices Handbook for New Development and Redevelopment ("CA BMP Handbook") by the California Stormwater Quality Association (CASQA), 2003; Start at the Source: A Design Guidance Manual for Stormwater Quality Protection ("Start at the Source") by the Bay Area Stormwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for Stormwater Quality: A Companion Document to Start at the Source ("Using Site Design Techniques") by BASMAA, 2003. County Fire Department 31. Required Fire Flow: The fire flow for this project is 1000 gpm at 20 residual pressure. The required fire flow is available from area water mains and fire hydrant(s) which are spaced at the required spacing. Acknowledged & Accepted: Emily Chen, Applicant