Re: File No: PLN2009-154
Address: 63> Virginia Ave.
Application: Administrative Site and Architectural Review Permit
nA~r ~n,- v,,.,
The Community Development Director has approved your Administrative Site & Architectural
Review Permit fora ] 6~ square-foot addition and a 40 square-foot front porch to an existing
1,446 square-foot single-family residence located at the above referenced address, in an R-1-6
(Single-Family Residential) Zoning District in the San Tomas Area.
This action is effective in ten calendar days, unless appealed in writing to the City Clerk b~~ x:00
p.m. on January l4, 201.0.
Please note that a signed copy of the attached Conditions of Approval must be received by the
Planning Division within thirt~~ days of the effective date of the Community Development
Director's decisiot,
If you should have any questions regarding this approval, please do not hesitate to contact me at
(408) 866-2193 or by email at danieli~~i~citvofcampbell.com.
Sincerely.
i ~~
~? ~I~ _ ,
\ / /` Sri'
Daniel Fama
Assistant Planner
z~---
cc: Paul Kermoyan, Planning Manager
encl: Conditions of Approval - PLN2009-1 ~4 (to be signed and returned)
.,
CONDITIONS OF APPROVAL FOR FILE NO. PLN2009-154 "' ° ~ "" ~~ ~"
SITE ADDRESS: 635 Virginia Ave.
APPLICANT/OWNER: Louis Yun
DATE: January 4, 2010 `' `'f `"`''''`J
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Where approval by the Director of Community Development, City
Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall
be for compliance with all applicable conditions of approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices, for the items under review.
Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division:
Declaration of Acceptance of All Conditions: Within thirty (30) days of the effective date of
the Community Development Director's approval, property owner(s) shall sign the final,
approved set of Conditions of Approval. Until said Conditions are signed, the approved
Administrative Site and Architectural Review Permit shall not be valid for any permits
sought from the City.
Acknowledged & Accepted:
~,~ ~ C-~ ~ 9--2 Dl Q
Louis Yun Date
2. Approved Project: Approval is granted for an Administrative Site and Architectural Review
Permit lPLN2009-1.54) for the construction of an 165 square-foot addition and 40 square-foot
front porch to an existing single-family residence located at 635 Virginia Avenue. The
project shall substantially conform to the project plans and material/color board stamped as
received by the Community Development Department on November 25, 2009, except as may
be modified by the conditions of approval herein:
3. Planning Final Required: Planning sign off is required to prior to Building Permit final.
Construction not in substantial compliance with the approved project plans shall not be
approved without prior authorization of the necessary approving body.
Pg. 1
4. Site and Architectural Review Permit Approval Expiration: The Administrative Site and
Architectural Review Permit approval shall be valid for two years from the date of .final
approval. Within this two-year period a building permit must be obtained. Failure to meet
this deadline will result in the Administrative Architectural Site and Review Permit being
void.
5. Fences/Walls: Any newly proposed fencing andior walls shall comply with Section
21.18.060 of the Campbell Municipal Code and shall be submitted for review and approval_
by the Community Development Department.
E. Contractor Contact Information Posting: The project site shall be posted with the name and
contact number of the lead contractor in a location visible from the public street prior tc the
issuance of building permits.
7. On-Site Li~htin~: On-site lighting shall be shielded away from adjacent properties and
directed on site. The design and type of lighting fixtures and lighting intensity o~f~ any
proposed exterior lighting for the project shall be reviewed and approved by tine Communin~
Development Director prior to installation of the lighting for compliance with all appii:.able
Conditions of Approval, ordinances.. laws and regulations. Lighting fixtures shall be of a
decorative design to be compatible with the residential development and shall incorporate
energy saving features.
8. Construction Activities: The applicant shall abide by the following requirements during
construction:
a. Construction activities shall be limited to weekdays between 8:00 a.m. and ~ :00 p.m. and
Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sunday.
or holidays unless an exception is granted by the Building Official.
b. All construction equipment with internal combustion engines used on the project site
shall be properly muffled and maintained in good working condition.
c. linnecessarv idling of internal combustion engines shall be strictly prohibited.
d. All stationary noise-generating construction equipment, such as air compressors and
portable power generators. shall be located as far as possible from noise-seusitiv:
receptors such as existing residences and businesses.
e. Use standard dust and erosion control measures that comply with the adopter Beni
Management Practices for the City of Campbell.
Building Division:
9. Permits Required: Building permit application shall be required for the proposed addition to
and remodel of the (e) dwelling structure. The building permit shall include
Electrical/Plumbing/Mechanical fees when such worl: is part of the permit.
l 0. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of
construction plans submitted for building permit.
1 1. Size of Plans: The minimum size. of construction plans submitted for building permits shall
be 24 in. ~ 36 in.
12. Plan Preparation: This project requires plans prepared under the direction and oversight of a
California licensed Engineer or Architect. When applicable, plans submitted for buildin~~
permits shall be "wet stamped" and signed by the qualifying professional person.
13. Site Plan: Application for building permit shall include a competent site plan that identifies
property and proposed structures with dimensions and elevations as appropriate. Site plan
shall also include site drainage details. Elevation bench marks shall be called out at all
locations that are identified as 'natural grade' and intended for use to determine the height of
the proposed structure.
14. Title 2 + EnerRv Compliance: California Title 24 Energy Compliance forms shad be blue-
lined on the construction plans. 8'/z X 1 l calculations shall be submitted as well.
l~. Special Inspections: When a special inspection is required by C.B.C. Chapter 1?. the
architect or engineer of record shall prepare an inspection program that shall be submitted to
the Building Official for approval prior to issuance of the building permits, in accordance
with C.B.C Appendix Chapter 1, Section 106. Please obtain City of Campbell, Special
Inspection forms from the Building, Inspection Division Counter.
l6. Non-point Pollution Control Program: The City of Campbell, standard Santa Clara Valley
Non-point Source Pollution Control Program specification sheet shall be part of plan
submittal. The specification sheet (size 24" ~ 36~') is available at the Building Division
service counter.
17. Approvals Required: The project requires the following agency approval prior to issuance of
the buildine hermit:
a. West Valley Sanitation District (378-2407]
b. Santa Clara Count~~ Fire Department (378-4010)
c. School District:
i) Campbell Union School District (378-3405)
ii) Campbell Union High School District (371-0960)
iii) Moreland School District (379-1370)
iv) Cambrian Schoo] District (377-? 103 j
Note: To determine your school district, contact the offices identified above or visit:
http;//www.sccoe.kl2.ca.us/resourcesfamilies/districtlocator. Obtain the Schoo]
District payment form from the Citv Building Division, after the Division has
approved the building permit application.
18. P.G.&E: Applicant is advised to contact Pacific Gas and Electric Company as early as
possible in the approval process. Service installations, chanties and/or relocations may
require substantial scheduling time and can cause significant delays in the approval process.
Applicant should also consult with P.G.&E conceriung utility easements, distribution pole
locations and required conductor clearances.
19. Intent to Occupy During Construction: Owners shall declare their intent to occupy the
dwelling during construction. The Building Inspection Division may require the premises to
be vacated during portions of construction because of substandard and unsafe iivin~T
conditions created by construction.
20. Construction Fencin,: This project shall be properly enclosed with construction fencing to
prevent unauthorized access to the site during construction. The construction site shall b:
secured to prevent vandalism andior theft during hours when no work is being done. All
protected trees shall be fenced to prevent damage to root systems.
21. Build it Green: Applicant shall complete and submit a "Build it Green'' inventory of the
proposed new single family project prior to the issuance of a building permit.