Loading...
Tree Removal Permit - 2010CITY of CAMPBELL Community Development Department October 19, 2010 Jason Mundy Paladin Design Company 249 S. 20th St. San Jose, CA 95126 Re: File No: PLN2010-217 Address: 878 Emory Ave. Application: Administrative Site and Architectural Review Permit Dear Mr. Mundy, On October 18, 2010 the Community Development Director approved your Administrative Site & Architectural Review Permit fora 570 square-foot garage addition and a new 229 square-foot breezeway on property located at the above referenced address, subject to the enclosed Conditions of Approval. This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5:00 p.m. on October 28, 2010. If you should have any questions regarding this approval, please feel free to contact me at (408) 866-2193 or by email at danielf(cr~.cit oy fcampbell.com. Sincerely, Daniel Fama Assistant Planner Encl: Conditions of Approval - PLN2010-217 cc: Paul Kermoyan, Planning Manager Bruce Powell, 899 Kenneth Ave., Campbell, CA 95008 ~.:;:.~ ~ r . ~, P,g, 1 RR`..1`a~ to !~~ '-'t~ ) }~L, i ~, ~ . <:> CONDITIONS OF APPROVAL FOR FILE NO. PLN2010-217, ype of tan;,6+casicr: ~' ~ E 1 < -- tlp~ro~+ed ~,,, SITE ADDRESS: 878 Emory Ave. ~~;.~:~;mrr~..;=-,y i~e~~~o~;ment Directc,. ~~~i ;;1nir;O ~O('C}rt115S1OF1 APPLICANT/OWNER: Jason Mundy /Bruce Powell ~- - DATE: October 18, 2010 ~-' '"~`' `~O1fC''~ ~,p~rovc! mate. --~ ' C-=~ ~?ssoktUor~ 1 (7rdnEnr.:~;: `~, /~-- -- The applicant is hereby notified, as part of this application, that ~"se is r ~o me- ewe -`~ following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: Approved Project: Approval is granted for an Administrative Site and Architectural Review Permit (PLN2010-217) for the construction of a 570 square-foot garage addition and new 229 square-foot breezeway to an existing single-family residence located at 878 Emory Avenue. The project shall substantially conform to the revised project plans stamped as received by the Community Development Department on September 29, 2010 except as may be modified by the conditions of approval herein. a. Driveway Paving: With building permit submittal, applicant shall provide a revised site plan that shows the installation of a new concrete, asphalt, or paver driveway consistent with Campbell Municipal Code Sec. 21.28.090. 2. Planning Final Required: Planning sign off is required prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. 3. Site and Architectural Review Permit Approval Expiration: The Administrative Site and Architectural Review Permit approval shall be valid for one year from the date of final approval. Within this one-year period a building permit must be obtained. Failure to meet this deadline will result in the Administrative Architectural Site and Review Permit being void. 4. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Section 21.18.060 of the Campbell Municipal Code and shall be submitted for review and approval by the Community Development Department. ~,, ~.. 70 North First Street • Campbell, CA 9008-1423 • TEL (408) 866 ? 140 • Fix (408) 866-5140 • E-naai~ planningC ciryofcampbell.con~ P g. 2 5. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 6. On-Site Li htg ink On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 7. Construction Activities: The applicant shall abide by the following requirements during construction: a. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. b. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. c. Unnecessary idling of internal combustion engines shall be strictly prohibited. d. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. e. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. Building Division: 8. Permits Required: Building permit application shall be required for the proposed garage and breezeway addition to the existing structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 9. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 10. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 11. Plan Preparation: This project may require plans prepared under the direction and oversight of a California licensed Engineer or Architect. When applicable, plans submitted for building permits shall be `'wet stamped" and signed by the qualifying professional person. :~ ~dr~, ~ . _ - ,',.. ~:~... 70 North First Street • Campbell, CA 95008-1423 • TE[, (408) 866-2140 • Fnx (408) 866-5140 • E-naa~~ planning ciryofcampbelLcom Pg. 3 12. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. 13. ~ecial Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Appendix Chapter 1, Section 106. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 14. Non-point Pollution Control Program: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 15. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. Santa Clara County Fire Department (378-4010) 16. P.G.&E: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations inay require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G.&E concerning utility easements, distribution pole locations and required conductor clearances. 17. Intent to Occupy During Construction: Owners shall declare their intent to occupy the dwelling during construction. The Building Inspection Division may require the premises to be vacated during portions of construction because of substandard and unsafe living conditions created by construction. 18. Build It Green: Applicant shall complete and submit a "Build It Green" inventory of the proposed new single family project prior to issuance of building permit. ,_ ~, . 70 North First Street • Campbell, CA 9008-1423 • TEL (408) 866-2140 • FAx (408) R66-5140 • E-MAIL. planning~i.cityofcampbell.com