Loading...
CC Resolution 11482RESOLUTION NO. ii4s2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL APPROVING THE FINAL CONCEPTUAL DESIGN, ADOPTING A STREET DESIGN STANDARD, AND AUTHORIZING THE PREPARATION OF DEDICATION DOCUMENTS AND NOTICE OF IMPROVEMENT OBLIGATIONS FOR THE HACIENDA AVENUE GREEN STREET IMPROVEMENT PROJECT 08-04 WHEREAS, August 7, 2012 City Council Study Session, staff presented the preliminary conceptual design for the Hacienda Avenue Green Street Project and discussed the two main goals of the project, which were to address existing concerns and to incorporate "Green Street" elements; and WHEREAS, staff has had meetings with 3 different groups of property owners along Hacienda Avenue where staff presented the proposed concept and collected any questions, comments, or concerns from the property owners; and WHEREAS, based on the input from these meetings, staff has since revised the design to include on-street parking in all locations where feasible; and WHEREAS, currently 16 properties do not have sufficient existing public right of way to install all of the proposed green street public improvements and the Hacienda Avenue Green Street Improvement Project has been modified to include construction of interim improvements at those locations; and WHEREAS, these properties may wish to dedicate additional public right of way and have the City install the public green street improvements with the Hacienda Avenue Green Street Improvement Project (per Municipal Code Section 11.24.070); and WHEREAS, the final conceptual design and the proposed Hacienda Avenue Green Street Improvement Project were presented at a final property owner meeting on November 1ST and additional public outreach was accomplished through a direct mailing to over 700 residents surrounding Hacienda Avenue. NOW, THEREFORE, BE IT RESOLVED that the City Council approves the final conceptual design for Hacienda Avenue between STAR/Burrows Road and Winchester Boulevard and the final conceptual design for the Hacienda Avenue Greet Street Improvement Project 08-04 and directs staff to prepare the final plans, specifications and cost estimate for the project; and NOW, THEREFORE, BE IT FURTHER RESOLVED that the City Council adopts the Hacienda Avenue Green Street Public Street Improvement Standard as the standard cross section for future public street improvements to be required of future development along Hacienda Avenue between STAR/Burrows Road and Winchester Boulevard; and NOW, THEREFORE, BE IT FURTHER RESOLVED that the City Council authorizes the City Engineer to prepare the necessary documents for the dedication of public right of way and to prepare the necessary Notice of Improvement Obligations for those property owners who wish to dedicate public right of way for the installation of street improvements with the Hacienda Avenue Green Street Project. PASSED AND ADOPTED this 20~h day of November 2012, by the following roll call vote: AYES: COUnCII Members: Cristina, Baker, Waterman, Low, Kotowski NOES: Council Members: None ABSENT: Council Members: None APPROVED: r ` ~~ au_ d l Michael F. Kotowski, Mayor ATTE C~~ Anne Bybee, Ci y Clerk