PC Res 4187RESOLUTION NO. 4187
BEING A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF CAMPBELL APPROVING A SITE AND
ARCHITECTURAL REVIEW PERMIT (PLN2014-157) TO ALLOW
THE CONSTRUCTION OF A NEW 5,172 SQUARE FOOT, 113-
SEAT RESTAURANT BUILDING ON PROPERTY LOCATED AT
2000 S. BASCOM AVENUE.
After notification and public hearing, as specified by law and after presentation by the
Community Development Director, proponents and opponents, the hearing was closed.
After due consideration of all evidence presented, the Planning Commission did find as
follows with respect to file number PLN2014-157:
1. The project site is zoned C-2 (General Commercial) and designated General
Commercial by the General Plan.
2. The project site is located on the east side of S. Bascom Avenue between E.
Campbell Avenue and Arroyo Seco Drive.
3. The proposed project is an application for a Site and Architectural Review to allow the
construction of a new 5,172 square foot, 113-seat restaurant building.
4. Policies found within the Campbell General Plan articulate a desire to promote and
allow change consistent with reinforcing positive neighborhood values and protecting
the integrity of the city's neighborhood, encouraging neighborhood serving
commercial uses within walking distance of residential uses, and attracting and
maintaining a variety of uses that create an economic balance within the city while
providing high quality services to the community.
Based upon the foregoing findings of fact, the Planning Commission further finds and
concludes that:
1. The proposed site is adequately served by streets (S. Bascom Avenue & E. Campbell
Avenue) of sufficient capacity to carry the kind and quantity of traffic the use would be
expected to generate;
2. The traffic generated from the development should not have adverse effects on traffic
conditions on abutting streets;
3. The layout of the site should provide adequate vehicular and pedestrian entrances,
exit driveways, and walkways;
4. The arrangement of off-street parking facilities should prevent traffic congestion and
adequately meet the demands of the users;
Planning Commission Resolution No. 4187 Page 2 of 3
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
5. The location, height, and material of walls, fences, hedges and screen plantings
should ensure harmony with adjacent development and/or conceal storage areas,
utility installations, or other potentially unsightly elements of the project;
6. The project should maximize open space around structures, for access to and around
structures, and the establishment and maintenance of landscaping for aesthetic and
screening purposes;
7. The project should maximize areas of improved open space to protect access to
natural light, ventilation, and direct sunlight, to ensure the compatibility of land uses,
to provide space for privacy, landscaping, and recreation; and
8. The project should minimize the unnecessary destruction of existing healthy trees;
9. The project should enhance the overall appearance of the city by improving the
appearance of individual development projects within the city;
10. The project should complement the surrounding neighborhoods and produce an
environment of stable and desirable character;
11. The project should enhance the city's character and should not have an adverse
aesthetic impact upon existing adjoining properties, the environment, or the city in
general;
12. The project should promote the use of sound design principles that result in creative,
imaginative solutions and establish structures of quality design throughout the city
and which avoid monotony and mediocrity of development;
13. The project should promote maintenance of the public health, safety, general welfare,
and property throughout the city;
14. The project should be consistent with all applicable design guidelines and special
plans; and
15. The project is Categorically Exempt under Section 15303, Class 3 of the California
Environmental Quality Act (CEQA) pertaining to the construction of new small
facilities and structures.
THEREFORE, BE IT RESOLVED that the Planning Commission approves a Site and
Architectural Review Permit (PLN2014-157) to allow the construction of a new 5,172
square foot, 113-seat restaurant building on property located at 2000 S. Bascom Avenue,
subject to the attached Conditions of Approval (Exhibit "A").
Where approval by the Director of Community Development, City Engineer, Public Works
Director, City Attorney or Fire Department is required, that review shall be for compliance
with all applicable conditions of approval, adopted policies and guidelines, ordinances,
Planning Commission Resolution No. 4187 Page 3 of 3
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
laws and regulations and accepted engineering practices for the item under review.
Additionally, the applicant is hereby notified that he/she is required to comply with all
applicable Codes or Ordinances of the City of Campbell and the State of California that
pertain to this development and are not herein specified.
PASSED AND ADOPTED this 27th day of January, 2015, by the following roll call vote:
AYES: Commissioners: Dodd, Finch, Kendall, Reynolds, Rich and Young
NOES: Commissioners: None
ABSENT: Commissioners None
ABSTAIN: Commissioners: None
ATTEST:
APPROVED
A ~ ~
~ r'
/ !
Pamela Finc air
EXHIBIT A
CONDITIONS OF APPROVAL
Site and Architectural Review Permit (PLN2014-157)
Where approval by the Director of Community Development, City Engineer, Public Works
Director, City Attorney or Fire Department is required, that review shall be for compliance
with all applicable conditions of approval, adopted policies and guidelines, ordinances,
laws and regulations and accepted engineering practices for the item under review.
Additionally, the applicant is hereby notified that he/she is required to comply with all
applicable Codes or Ordinances of the City of Campbell and the State of California that
pertain to this development and are not herein specified.
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
1. Approved Project: Approval is granted for a Site and Architecture Review Permit
(PLN2014-157) to allow the construction of a new 5,172 square foot, 113-seat
restaurant building. The project shall substantially conform to the Project Plans,
stamped as received by the Planning Division on January 5, 2015, except as may be
modified by the conditions of approval contained herein.
2. Site and Architectural Review Expiration: The Site and Architectural Review Permit
shall be valid for one year from the date of final approval (expiring January 27, 2016).
Within this one-year period, applications for building permits must be submitted and
substantial construction efforts must commence. Failure to meet this deadline will
result in the Site and Architectural Review Permit (PLN2014-157) being rendered
void.
3. Restaurant Seating: Total indoor seating shall be limited 113 seats. This total is to be
divided between the two tenant spaces, such that the larger 2,650 square foot tenant
space facing S. Bascom Avenue shall have no more than 57 seats, and the smaller
2,522 sq. ft. tenant space located interior to the project site shall have no more than
56 seats. No transfer or redistribution of seats between tenant spaces shall be
permitted. This seating limitation is also subject to the maximum occupancy
capacities of certain rooms as determined by the California Building Code (CBC). It is
the responsibility of the business owner to provide adequate entrance controls to
ensure that patron occupancy is not exceeded. Maximum Occupancy signs shall be
posted conspicuously within the premises.
4. Parking: Prior to occupancy, a total of 77 shared commercial parking spaces shall be
provided in accordance with the project plans.
5. Location of Mechanical Equipment: No roof-mounted mechanical equipment, i.e. air
conditioning units, shall be located on the roof of the building without providing
screening of the mechanical equipment from public view and surrounding properties.
Screening material and method shall require review and approval by the Community
Development Director prior to installation of such mechanical equipment screening.
Planning Commission Resolution No. 4187 Page 2 of 10
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
6. Building Colors: Prior to building permit issuance, the applicant shall provide a
minimum of three paint swatches indicating a slightly warmer, off-white, paint color for
the building stucco and a sample of the mid-range "teak" staining treatment proposed
for the Ipe wood siding to be reviewed and approved by the Director of Community
Development. The applicant shall further be required to paint a small segment of the
building in the three, previously provided, paint colors prior to painting the building.
The final building colors and staining of the Ipe wood siding are subject to review and
approval of the Director of Community Development.
7. Outdoor Storage: No outdoor storage is permitted on the property.
Building Division
8. Permits Required: A building permit application shall be required for the proposed
Tenant Improvements to the (e) commercial space. The building permit shall include
Electrical/Plumbing/Mechanical fees when such work is part of the permit.
9. Construction Plans: The conditions of Approval shall be stated in full on the cover
sheet of construction plans submitted for building permit.
10. Size of Plans: The minimum size of construction plans submitted for building permits
shall be 24 in. X 36 in.
11. Plan Preparation: This project requires plans prepared under the direction and
oversight of a California licensed Engineer or Architect. Plans submitted for building
permits shall be "wet stamped" and signed by the qualifying professional person.
12. Site Plan: Application for building permit shall include a competent site plan that
identifies property and proposed structures with dimensions and elevations as
appropriate. Site plan shall also include site drainage details. Site address and parcel
numbers shall also be clearly called out. Site parking and path of travel to public
sidewalks shall be detailed.
13. Title 24 Energy Compliance: California Title 24 Energy Standards Compliance forms
shall be blue-lined on the construction plans. Compliance with the Standards shall be
demonstrated for conditioning of the building envelope and lighting of the building.
14. Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the
architect or engineer of record shall prepare an inspection program that shall be
submitted to the Building Official for approval prior to issuance of the building permits,
in accordance with C.B.C Chapter 1, Section 106. Please obtain City of Campbell,
Special Inspection forms from the Building Inspection Division Counter.
15. Non-Point Source Pollution: The City of Campbell, standard Santa Clara Valley Non-
point Source Pollution Control Program specification sheet shall be part of plan
Planning Commission Resolution No. 4187 Page 3 of 10
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
submittal. The specification sheet (size 24" X 36") is available at the Building Division
service counter.
16. Title 24 Accessibility -Commercial: On site general path of travel shall comply with
the latest California Title 24 Accessibility Standards. Work shall include but not be
limited to accessibility to building entrances from parking facilities and sidewalks.
17. Title 24 Accessibility -Commercial: This project shall comply fully with the provisions
of Chapter 11 B of California Building Code 2013 ed.
18. Approvals Required: The project requires the following agency approval prior to
issuance of the building permit:
a. West Valley Sanitation District
b. Santa Clara County Fire Department
c. Santa Clara County Department of Environmental Health
d. San Jose Water Company
e. City of San Jose Dept. of Environmental Resources
19. P.G.&E.: Applicant is advised to contact Pacific Gas and Electric Company as
early as possible in the approval process. Service installations, changes and/or
relocations may require substantial scheduling time and can cause significant delays
in the approval process. Applicant should also consult with P.G.&E. concerning utility
easements, distribution pole locations and required conductor clearances.
20. LEED for New Construction: Applicant shall complete and return Leed Project
Checklist prior to issuance of permit.
21. Storm Water Requirements: Storm water run-off impervious surface created by this
permitted project shall be directed to vegetated areas on the project parcel. Storm
water shall not drain onto neighboring parcels.
22. California Green Building Code: This project shall comply with Non-Residential
Mandatory Requirements, Chapter 5 -California Green Building Code 2013 ed.
Public Works
23. Response Letter: Upon submittal of the Street Improvement Plans and the Grading
and Drainage Plans, the applicant shall provide an itemized response letter verifying
that all the Public Works Conditions of Approval have been met or addressed.
24. Proof of Ownership: Prior to issuance of any grading, drainage, or building permits
for the site, the applicant shall provide a current Preliminary Title Report, grant deed,
or other satisfactory proof of ownership.
Planning Commission Resolution No. 4187 Page 4 of 10
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
25. Right-of-Way for Public Street Purposes: Prior to issuance of any grading, drainage,
or building permits for the site, the applicant shall fully complete the process to cause
additional right-of-way to be granted in fee for public street purposes along the South
Bascom Avenue frontage to accommodate the new sidewalk, unless otherwise
approved by the City Engineer. The applicant shall submit the necessary documents
for approval by the City Engineer, process the submittal with City staff's comments
and fully complete the right-of-way process. The applicant shall cause all documents
to be prepared by a registered civil engineer/land surveyor, as necessary, for the
City's review and recordation.
26. Grading and Drainage Plan: Prior to issuance of any grading, drainage, or building
permits for the site, the applicant shall conduct hydrology studies based on a ten-year
storm frequency, prepare an engineered grading and drainage plan, and pay fees
required to obtain necessary grading permits. Prior to occupancy, the design
engineer shall provide written certification that the development has been built per the
engineered grading and drainage plans.
In addition, a plan review letter will be required of the Geotechnical engineer for the
entire grading and drainage system which should include but is not limited to a review
of the subsurface of the non-compacted biotreatment material that may have potential
for subsurface failure and surface failure due to vehicle loads.
27. Drainage System: Prior to occupancy clearance, the applicant shall refurbish,
remodel, and reconstruct the on-site drainage system, as necessary, to demonstrate
that the facilities are functioning normally in accordance with the requirements of the
City.
28. Storm Drain Area Fee: Prior to issuance of any grading, drainage, or building permits
for the site, the applicant shall pay the required Storm Drain Area fee, currently set at
$2,650.00 per net acre, which is $2,517.00.
29. Utilities: All on-site utilities shall be installed underground per Section 21.18.140 of
the Campbell Municipal Code for any new or remodeled buildings or additions.
Applicant shall comply with all plan submittals, permitting, and fee requirements of the
serving utility companies.
Utility locations shall not cause damage to any existing street trees. Where there are
utility conflicts due to established tree roots or where a new tree will be installed,
alternate locations for utilities shall be explored. Include utility trench details where
necessary.
30. Water Meter(s) and Sewer Cleanout(s): Existing and proposed water meter(s) and
sewer cleanout(s) that are being modified as part of this project shall be relocated or
installed on private property behind the public right-of-way line.
Planning Commission Resolution No. 4187 Page 5 of 10
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
31. Utility Coordination Plan: Prior to issuance of building permits for the site, the
applicant shall submit a utility coordination plan and schedule for approval by the City
Engineer for installation and/or abandonment of all utilities. The plan shall clearly
show the location and size of all existing utilities and the associated main lines;
indicate which utilities and services are to remain; which utilities and services are to
be abandoned, and where new utilities and services will be installed. Joint trenches
for new utilities shall be used whenever possible.
32. Pavement Restoration: Based on the utility coordination plan, the applicant shall
prepare a pavement restoration plan for approval by the City Engineer prior to any
utility installation or abandonment. The pavement restoration plan shall indicate how
the street pavement shall be restored following the installation or abandonment of all
utilities necessary for the project.
33. Street Improvement Agreements/Plans/Encroachment Permit/Fees/Deposits Prior to
issuance of any grading, drainage, or building permits for the site, the applicant shall
execute a street improvement agreement, cause plans for public street improvements
to be prepared by a registered civil engineer, pay various fees and deposits, post
security and provide insurance necessary to obtain an encroachment permit for
construction of the standard public street improvements, as required by the City
Engineer. The plans shall include the following, unless otherwise approved by the
City Engineer:
a. Show location of all existing utilities within the new and existing public right of
way.
b. Relocation of all existing utilities including utility boxes, covers, poles, etc.
outside of sidewalk area. No utility boxes, covers, etc. will be allowed in the
sidewalk area.
c. Removal of existing driveway approach and necessary sidewalk, curb and
gutter.
d. This project is subject to the City's Streetscape Standards for Bascom Avenue,
which requires a 10 foot landscaped park strip with City approved street trees 40
feet on center, and a 7 foot sidewalk along S. Bascom Avenue.
e. This project is subject to the City's Streetscape Standards for East Campbell
Avenue, which requires a 10 foot wide sidewalk with City approved street trees
in 4' x 4' tree wells 30 feet on center. This requirement only applies to the
portion of the East Campbell Avenue frontage between South Bascom Avenue
and the project's first driveway on East Campbell Avenue.
f. Installation of ADA compliant driveways on S Bascom Avenue and East
Campbell Avenue frontages, with new City standard curb, gutter, and sidewalk
along the frontages between the two driveways.
g. Installation of new ADA compliant ramp at the southeast corner of East
Campbell Avenue and South Bascom Avenue.
Planning Commission Resolution No. 4187 Page 6 of 10
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
h. Installation of asphalt concrete overlay per street pavement restoration plan for
utility installation and/or abandonment, as required by the City Engineer.
Installation of streetlights, conduits, conductors and related facilities in
accordance with the City of Campbell's Street Lighting Policies. Installation of
traffic control, stripes and signs.
Construction of conforms to existing public and private improvements, as
necessary. Submit final plans in a digital format acceptable to the City.
34. Street Improvements Completed for Occupancy and Building Permit Final: Prior to
allowing occupancy and/or final building permit signoff for any and/or all buildings, the
applicant shall have the required street improvements and pavement restoration
installed and accepted by the City, and the design engineer shall submit as-built
drawings to the City.
35. Maintenance of Landscaping_ Owner(s), current and future, are required to maintain
the landscaped park strip and tree wells in the public right of way. This includes, but
is not limited to: trees, lawn, plantings, irrigation, etc. Trees shall not be pruned in a
manner that would not allow the tree to grow to a mature height.
36. Utility Encroachment Permit: Separate permits for the installation of utilities to serve
the development will be required (including water, sewer, gas, electric, etc.).
Applicant shall apply for and pay all necessary fees for utility permits for sanitary
sewer, gas, water, electric and all other utility work.
37. Additional Street Improvements: Should it be discovered after the approval process
that new utility main lines, extra utility work or other work is required to service the
development, and should those facilities or other work affect any public
improvements, the City may add conditions to the development/project/permit, at the
discretion of the City Engineer, to restore pavement or other public improvements to
the satisfaction of the City.
38. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or
building permits, the applicant shall comply with the National Pollution Discharge
Elimination System (NPDES) permit requirements, Santa Clara Valley Water District
requirements, and the Campbell Municipal Code regarding stormwater pollution
prevention. Specifically the project must include source control, site design and
treatment measures to achieve compliance with Provision C.3. of the NPDES Permit.
Measures may include, but are not limited to, minimization of impervious surface
area, vegetated swales, infiltration areas, and treatment devices. The primary
objectives are to improve the quality and reduce the quantity of stormwater runoff to
the bay.
Resources to achieve these objectives include Stormwater Best Management
Practices Handbook for New Development and Redevelopment ("CA BMP
Handbook") by the California Stormwater Quality Association (CASQA), 2003; Start
Planning Commission Resolution No. 4187 Page 7 of 10
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
at the Source: A Design Guidance Manual for Stormwater Quality Protection ("Start
at the Source") by the Bay Area Stormwater Management Agencies Association
(BASMAA), 1999; and Using Site Design Techniques to Meet Development
Standards for Stormwater Quality: A Companion Document to Start at the Source
("Using Site Design Techniques") by BASMAA, 2003.
Upon submission of the grading permit, the applicant shall calculate and submit to the
City the amount of impervious surface created by the development including the
types of stormwater controls to be used. The applicant shall submit preliminary sizing
and design showing stormwater controls meet the City's requirements.
Prior to issuance of the grading permit:
a. The applicant's designer or engineer shall submit the required certification
indicating that sizing, selection, and design of treatment BMP's for the project
site has been completed to meet the requirements of the City of Campbell's
NPDES permit, No. 01-119, Provision C.3.
b. The applicant shall sign the "Covenants for the Operation and Maintenance of
Stormwater Facilities" and submit a Stormwater Management Plan.
Prior to occupancy:
a. A qualified BMP certifier is required to inspect the stormwater management
facilities, submit a complete set of as-built drawings to Public Works
Engineering, and certify on these drawings that:
1. The stormwater management facilities were constructed in compliance with
the approved plans.
2. The as-built drawings show all pertinent constructed dimensions,
elevations, shapes, and materials.
3. All variations in construction from the approved design plan have been
identified, including omissions to and additions from the approved plan.
4. Any changes are in conformance with local, state, or federal regulations.
b. The applicant shall provide security for the operation and maintenance of
stormwater pollution prevention measures installed or provided as a part of this
project.
39. Private Improvements Agreement: Prior to issuance of any grading, drainage, or
building permits for the site, the owner shall execute an "Agreement for Private
Improvements in the Public Right of Way". This agreement would be required to allow
the existing utility facilities (water meters, backflow preventers, etc.) located in the
public right of way along the frontage of this property, and any other non-City standard
improvements, to remain.
Planning Commission Resolution No. 4187 Page 8 of 10
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
Santa Clara County Fire Department
40. Review: Review of this Developmental proposal is limited to acceptability of site
access and water supply as they pertain to fire department operations, and shall not
be construed as a substitute for formal plan review to determine compliance with
adopted model codes. Prior to performing any work the applicant shall make
application to, and receive from, the Building Department all applicable construction
permits.
41. Fire Sprinklers: Approved automatic sprinkler systems in new and existing buildings
and structures shall be provided in the locations described in this Section or in
Sections 903.2.1. through 903.2.18 whichever is the more restrictive. For the
purposes of this section, firewalls used to separate building areas shall be
constructed in accordance with the California Building Code and shall be without
openings or penetrations. An automatic sprinkler system shall be provided throughout
all new buildings and structures. Exception: Group A, B E, F, I, L, M, S, and U
occupancy buildings and structures that do not exceed 1,000 square feet of building
area. NOTE: The owner(s), occupant(s) and any contractor(s) or subcontractor(s) are
responsible for consulting with the water purveyor of record in order to determine if
any modification or upgrade of the existing water service is required. A State of
California licensed (C-16) Fire Protection Contractor shall submit plans, calculations,
a completed permit application and appropriate fees to this department for review and
approval prior to beginning their work. CRC Sec. 903.2 as adopted and amended by
CMC.
42. Hood/Duct Extinguishing Systems: Automatic fire-extinguishing systems installed as
an alternative to the required automatic sprinkler systems of Section 903 shall be
provided by the fire code official. Automatic fire-extinguishing systems shall not be
considered alternatives for the purposes of exceptions or reductions allowed by other
requirements of this code. Commercial hood and duct systems. Each required
commercial kitchen exhaust hood and duct system required by Section 609 to have a
Type I hood shall be protected with an approved automatic fire-extinguishing system
installed in accordance with this code. CFC Sec. 904.
43. Water Supply Requirements: Portable water supplies shall be protected from
contamination caused by fire protection water supplies. It is the responsibility of the
applicant and any contractors and subcontractors to contact the water purveyor
supplying the site of such project, and to comply with the requirements of that
purveyor. Such requirements shall be incorporated into the design of any water-
based fire protection systems, and/or fire suppression water supply systems or
storage containers that may be physically connected in a manner to an appliance
capable of causing contamination of the portable water supply of the purveyor of
record. Final approval of the system(s) under consideration will not be granted by this
office until compliance with the requirements of the water purveyor of record are
Planning Commission Resolution No. 4187 Page 9 of 10
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
documented by that purveyor as having been met by the applicant(s). 2010 CFC Sec.
903.3.5 and Health and Safety Code 13114.7.
44. Trash Enclosures: Dumpsters with an individual capacity of 1.0 cubic yards [200
gallons (0.76 m3)] or more shall not be stored in buildings or placed within 5 feet
(1524mm) of combustible walls, openings or combustible roof eave lines unless the
dumpsters are constructed of noncombustible materials or of combustible materials
with a peak rate of heat release not exceeding 300 kW/m2 when tested in
accordance with ASTM E 1354 at an incidental heat flux of 50 kW/m2 in the
horizontal orientation. Exceptions: 1. Dumpsters in areas protected by an approved
automatic sprinkler system installed throughout in accordance with Section 903.3.1.1.
45. Cooking Oil: Storage of cooking oil (grease) in commercial cooking operations shall
comply with Chapter 57. Systems used to store cooking oils in larger than 60-gallon
(227 L) above ground tanks shall also comply with Sections 610.2 through 610.5. For
purposes of this section, cooking oil shall be classified as a Class IIIB liquid unless
otherwise determined by testing. CFC Sec. 610.
46. Construction Site Fire Safety: All construction sites must comply with applicable
provisions of CFC Chapter 33 and our Standard Detail and Specifications SI-7.
Provide appropriate notations on subsequent plan submittals, as appropriate to the
project. CFC Chp. 33.
47. Address Identification: New and existing buildings shall have approved address
numbers, building numbers or approved building identification placed in a position
that is plainly legible and visible from the street or road fronting the property. These
numbers shall contrast with their background. Address numbers shall be Arabic
numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6mm)
high with a minimum stroke width of 0.5 inch (12.7 mm). Where access is by means
of a private road and the building cannot be viewed from the public way, a monument,
pole or other sign or means shall be used to identify the structure CFC Sec. 505.1.
48. Plans Not Approved: To prevent plan review and inspection delays, the above noted
Developmental Review Conditions shall be addressed as "notes" on all pending and
future plan submittals and any referenced diagrams to be reproduced onto the future
plan submittal.
Planning Commission Resolution No. 4187
PLN2014-157 - 2000 S. Bascom Avenue
Site and Architectural Review Permit -New Restaurant Building
Page 10 of 10
PASSED AND ADOPTED this 27th day of January, 2015, by the following roll call vote:
AYES: Commissioners
NOES: Commissioners
ABSENT: Commissioners
ABSTAIN: Commissioners
Dodd, Finch, Kendall, Reynolds, Rich and Young
None
None
None
APPROVED:
Pamela Finch, Chair
ATTEST:
Paul Kermoyan, Secretary