Loading...
PC Res 3477RESOLUTION NO. 3477 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL GRANTING A SITE AND ARCHITECTURAL REVIEW PERM1T (PLN2002-144) TO ALLOW A SECOND STORY ADDITION ON AN EXISTING SINGLE-FAMILY RESIDENCE ON PROPERTY OWNED BY VON AND JHAINE GOESLING LOCATED AT 1384 WALNUT DRIVE IN AN R-l-10 (SINGLE FAMILY RESIDENTIAL) ZONING DISTRICT. APPLICATION OF MR. LOUIS DORCICH, ON BEHALF OF VON AND JHAINE GOESLING. FILE NO. PLN2002-144. After notification and public heating, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the heating was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application PLN2002-144: 1. The density of the proposed project site is 3.4 units per gross acre, which is consistent with the General Plan land use designation of Low Density Residential (less than 3.5 units per gross acre.) The proposed project is consistent with the R-l-10 (Single-Family Residential, 10,000 square foot minimum lot size) Zoning District and meets the minimum setbacks, height restriction, building coverage, floor area ratio, and parking requirements of the R-1-10 Zoning District. 3. The project is consistent with the development standards and design guidelines of the San Tomas Area Neighborhood Plan. The project consists of a 4,223 square foot two-story residence, a 397 square foot attached garage, and a 64 square foot covered porch with a building coverage of 32% and Floor Area Ratio of 0.44. 5. The project provides four parking spaces where a minimum of two parking spaces are required. 6. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood. A ten-foot setback is provided from the northern side property line and an existing seven-foot six-inch setback is provided from the southern side property line. A twenty-five foot setback is provided from the front property line and a twenty-nine foot setback from the rear property line. Planning Commission Resolution No. 3477 PLN2002-144 - 1384 Walnut Drive - Site and Architectural Review Permit Page 2 The proposed two-story residence incorporates representative architectural features of homes in the San Tomas Neighborhood including hipped and gabled roof forms, a two-car garage door, composition shingle roofing and stucco siding. Additional elements include the decorative porch, divided window treatments, and stone treatment on the chimney and entry. 9. The proposed project is surrounded by single-family residential uses to the north, south, and west and a commercial use to the east. 10. The project qualifies as Categorically Exempt under Section 15303, Class 3 of the California Environmental Quality Act (CEQA) pertaining to the construction of a single-family residential addition. Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The proposed project is consistent with the General Plan and Zoning Ordinance. 2. The proposed project, as conditioned, will aid in the harmonious development of the immediate area. o No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required Conditions of Approval, will have a significant adverse impact on the environment. 4. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 5. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 6. There is a reasonable relationship and a rough proportionality between the Conditions of Approval and the impacts of the project. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission grants a Site and Architectural Review Permit (PLN2002-148) to allow the construction of a second story addition on an existing single-family residence on property owned by Von and Jhaine Goesling located at 1384 Walnut Drive, subject to the following conditions: Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Planning Commission Resolution No. 3477 PLN2002-144 - 1384 Walnut Drive - Site and Architectural Review Permit Page 3 Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: Approved Project: Approval is granted for a Site and Architectural Review Permit to allow the construction of a second story addition on an existing single-family residence located at 1384 Walnut Drive. The building design and site design shall substantially conform to the project exhibits listed below, except as may be modified by the Conditions of Approval herein: o o 1. Project plans prepared by Louis Dorcich and received by the Planning Division on January 8, 2003, including a site plan, floor plans, elevations, and landscape plan. 2. Color/material board received by the Planning Division on November 15, 2003. 3. Colored Elevation received by the Planning Division on January 8, 2003. Approval Expiration: The Site and Architectural Review Permit approval shall be valid for a period of one year from the date of final approval. Within this one-year period, a building permit must be obtained and construction completed one year thereafter or the Site and Architectural Review Permit shall be void. Fences: Any existing or new fencing shall comply with Section 21.59.090 of the Campbell Municipal Code. Fencing along the property lines shall be replaced with a six-foot high "good neighbor" wood fence at the expense of the applicant, unless it is determined to be in good condition by the Community Development Director. Property Maintenance: The property is to be maintained free of any combustible trash, debris and weeds until the time that actual construction commences. All existing structures shall be secured by having windows boarded up and doors sealed shut, or be demolished or removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code.) Parking and Driveways: All parking and driveway areas shall be developed in compliance with the approved plans and Chapter 21.50 (Parking and Loading) of the Campbell Municipal Code. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a Planning Commission Resolution No. 3477 PLN2002-144 - 1384 Walnut Drive - Site and Architectural Review Permit Page 4 decorative design to be compatible with the residential development and shall incorporate energy saving features. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 8. Accessory Building: The accessory building shall be removed prior to final inspection. o Tree Protection Plan: Prior to issuance of building permits, the applicant shall submit a tree protection plan in accordance with the City's Water Efficient Landscape Guidelines (WELS) and the Tree Preservation Ordinance to indicate how the existing trees to be retained on site will be protected during construction. BUILDING DIVISION 10. Permits Required: A building permit application shall be required for the proposed new dwelling unit. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 11. Construction Plans: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 12. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 inches by 36 inches. 13. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 14. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. 15. Title 24 Energy Compliance: California Title 24 Energy Compliance forms CF-IR and MF- IR shall be blue-lined on the construction plans. 81/2 by 11 calculations shall be submitted as well. 16. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. Planning Commission Resolution No. 3477 PLN2002-144 - 1384 Walnut Drive - Site and Architectural Review Permit Page 5 17. Non-Point Source Pollution Control: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" by 36") is available at the Building Division service counter. 18. Approvals Required: of the building permit: a. b. C. d. The project requires the following agency approvals prior to issuance West Valley Sanitation District (378-2407) Santa Clara County Fire Department (378-4010) Bay Area Air Quality Management District (Demolitions Only) School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (379-1370) iv) Cambrian School District (377-2103) Note: To Determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. 19. PG&E: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with PG&E concerning utility easements, distribution pole locations and required conductor clearances. PUBLIC WORKS DEPARTMENT 20. Work in the Public Right-of-Way: Prior to doing any work in the public right-of-way, the applicant shall obtain an encroachment permit, provide plans, pay fees and deposits, post security, and provide insurance. 21. Water Meter(s) and Sewer Cleanout(s): Existing and proposed water meter(s) and sewer cleanout(s) shall be installed on private property behind the public right-of-way line. 22. Utilities: All new on-site utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. 23. Utility Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. Streets, which have been resurfaced within the previous five years, will require boring and jacking for all new utility installations. Planning Commission Resolution No. 3477 PLN2002-144 - 1384 Walnut Drive - Site and Architectural Review Permit Page 6 Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. FIRE DEPARTMENT 24. Required Fire Flow: The fire flow for this project is 1,750 gpm at 20 psi residual pressure. The required fire flow is available from area water mains and fire hydrant(s), which are spaced at the required spacing. PASSED AND ADOPTED this 28th day of January, 2003, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: Commissioners: Commissioners: Commissioners: Commissioners: Alderete, Doorley, Francois, Gibbons and Rocha None Hemandez and Jones None APPROVED:F' ~q~'~~ ~eo~ Doo[ley, Acting C~.~ ATTEST: ..~~k~''-~ Sharon Fierro, Secretary