Loading...
PC Res 4308RESOLUTION NO. 4308 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A SITE AND ARCHITECTURAL REVIEW PERMIT (PLN2016-138) TO ALLOW FORA 499-SQUARE-FOOT, SINGLE-STORY ADDITION TO THE REAR OF AN EXISTING RESIDENCE LOCATED AT 1045 SALERNO DRIVE. FILE NO.: PLN2016-138 After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. The Planning Commission finds as follows with regard to file number PLN2016-138: Environmental Finding(s) 1. The project qualifies as a Categorically Exempt project per Section 15301, Class 1 of the California Environmental Quality Act (CEQA), pertaining to minor alterations to existing private structures. Evidentiary Findings 1. The project site is zoned R-1-8 (Single Family Residential) on the City of Campbell Zoning Map. 2. The project site is designated Low Density Residential (4.5 units/gr. acre) on the City of Campbell General Plan Land Use diagram. 3. The project site is located within the Cambrian 36 annexed area, commonly known as "Campbell Village," on the west side of Salerno Drive, south of Curtner Avenue. 4. The proposed project consists of a one-story 2,502 square-foot (1,414 sq. ft. residence, 499 sq. ft. detached garage) single-story, single-family residence with a building coverage of 28% and a floor area ratio of 27.5%. 5. The proposed project will be compatible with the R-1-8 (Single Family Residential) Zoning District with approval of a Site and Architectural Review Permit. 6. The existing residence provides two parking spaces, satisfying the applicable parking requirement. 7. The proposal is consistent with the City adopted Design Guidelines for Single Family Homes. Based upon the foregoing findings of fact and pursuant to CMC Section 21.42.020, the Planning Commission further finds and concludes that: 1. The project will be consistent with the General Plan; 2. The project will aid in the harmonious development of the immediate area; Planning Commission Resolution No. 4308 PLN2016-138 -Site and Architectural Review Permit -Residential Addition Page 2 of 2 3. The project is consistent with applicable adopted design guidelines; and 4. This project is Categorically Exempt under Section 15301, Class 1 of the California Environmental Quality Act (CEQA), pertaining to minor to minor alterations to existing private structures. THEREFORE, BE IT RESOLVED that the Planning Commission approves a Site and Architectural Review Permit (PLN2016-138) to allow fora 499-square-foot, single-story addition to the rear of an existing residence located at 1045 Salerno Drive, subject to the attached Conditions of Approval (attached Exhibit "A"). PASSED AND ADOPTED this 12th day of July, 2016, by the following roll call vote: AYES: Commissioners NOES: Commissioners ABSENT: Commissioners ABSTAIN: Commissioners ATTEST: Dodd, Finch, Kendall, Reynolds, Rich and Young None Bonhagen None APPROVED: Paul Kertmoyan, Secretary EXHIBIT A RECOMMENDED CONDITIONS OF APPROVAL Site and Architectural Review Permit -1045 Salerno Drive (PLN2016-138) Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division Approved Project: Approval is granted for a Site and Architectural Review Permit (PLN2016-138) to allow fora 499-square-foot, single-story addition to the rear of an existing residence located at 1045 Salerno Drive. The project shall substantially conform to the project plans and color and material board as received by the Planning Division on May 31, 2016, except as may be modified by the Conditions of Approval herein. 2. Permit Expiration: The Site and Architectural Review Permit approval shall be valid for one year from the date of final approval (expiring July 22, 2017). Within this one-year period, an application for a building permit must be submitted. Failure to meet this deadline will result in the Site and Architectural Review Permit being rendered void. 3. Planning Final Required: Planning Division clearance is required prior to final Building Permit clearance. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. 4. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 5. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Campbell Municipal Code Section 21.18.060 and shall be submitted for review and approval by the Community Development Department. 6. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 7. Construction Activities: The applicant shall abide by the following requirements during construction: Exhibit A -Conditions of Approval ~ 1045 Salerno Drive Page 2 a. The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. b. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. c. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. d. Unnecessary idling of internal combustion engines shall be strictly prohibited. e. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise- sensitive receptors such as existing residences and businesses. f. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. Building Division 8. Permits Required: A building permit application shall be required for the proposed addition to the existing structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 9. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 10. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 11. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 12. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Elevation bench marks shall be called out at all locations that are identified as "natural grade" and intended for use to determine the height of the proposed structure. 13. Title 24 Energy Compliance: California Title 24 Energy Compliance forms shall be blue-lined on the construction plans. 8'/2 X 11 calculations shall be submitted as well. 14. Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Appendix Chapter 1, Section 106. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. Exhibit A -Conditions of Approval ~ 1045 Salerno Drive 3 15. Non-point Pollution Control Program: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 16. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. Bay Area Air Quality Management District (Demolitions Only) d. School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (379-1370) iv) Cambrian School District (377-2103) Note: To determine your school district, contact the offices identified above or visit: http://www.sccoe.k12.ca.us/resourcesfamilies/districtlocator. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. 17. Intent to Occupy During Construction: Owners shall declare their intent to occupy the dwelling during construction. The Building Inspection Division may require the premises to be vacated during portions of construction because of substandard and unsafe living conditions created by construction. 18. Build it Green: Applicant shall complete and submit a "Build it Green" inventory of the proposed new single family project prior to the issuance of a building permit. 19. Stormwater Requirements: Storm water run-off from impervious surface created by this permitted project shall be directed to vegetated areas on the project parcel. Storm water shall not drain onto neighboring parcels. 20. CA Green Building Code: This project is subject to the mandatory requirements for new residential structures (Chapter 4) under the California Green Building Code, 2013 edition. FIRE DEPARTMENT 21. Formal Plan Review: Review of this development proposal is limited to accessibility of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall make application to, and receive from, the Building Division all applicable construction permits.