PC Res 4332 (2)RESOLUTION NO. 4332 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A SITE AND ARCHITECTURAL REVIEW PERMIT TO ALLOW THE CONSTRUCTION OF A 629 SQUARE FOOT ADDITION TO AN EXISTING SINGLE-FAMILY RESIDENCE ON PROPERTY LOCATED AT 1045 NORMANDY DRIVE. FILE NO. PLN2016-219. After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. The Planning Commission finds as follows with regard to file number PLN2016-219: 1. The project site is zoned R-1-8 (Single Family Residential) on the City of Campbell Zoning Map. 2. The project site is designated Low Density Residential (4.5 units/gr. acre) on the City of Campbell General Plan Land Use diagram. 3. The proposed project will be compatible with the R-1-8 (Single Family Residential) Zone District with approval of a Site and Architectural Review Permit. 4. The project site is located along Normandy Drive. 5. The application is subject to design review under the City of Campbell Design Guidelines for Additions to Single Family Homes. 6. The addition is compatible with the original home including scale and mass, colors and materials, window type, and roof slope. The home will maintain the existing street setback, consistent with the two adjacent residences. Privacy impacts are minimized by maintaining asingle-story design and larger than required setbacks.. 7. No substantial evidence has been presented which shows that the project, as currently presented and subject to the required Conditions of Approval, will have a significant adverse impact on the environment. Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The project will be consistent with the General Plan; 2. The project will aid in the harmonious development of the immediate area; 3. The project is consistent with applicable adopted design guidelines; and Planning Commission Resolution No. 4332 PLN2016-21-9 - Approving a Planned Development Permit - 1045 Normandy Dr. Page 2'. _ - ' 4. Staff recommends that the Planning Commission find that this project is Categorically Exempt under Section 15301, Class 1 of the California Environmental Quality Act (CEQA), pertaining to additions to existing structures. THEREFORE, BE IT RESOLVED that the Planning Commission approves a Site and Architectural Review Permit (PLN2016-219) to allow a 629 square .foot addition to an existing residence on property located at 1045 Normandy Drive, subject to the attached Conditions of Approval (attached Exhibit "A"). PASSED AND ADOPTED this 27th day of September, 2016, by the following roll call vote: AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners: ABSTAIN: Commissioners: ATTE Paul Kermoyan, ; Dodd., Hernandez, Kendall, Reynolds and Young None Bonhagen and Rich None APPROVED: ~"' Cynt 'a Dodd, Chair .-,--~ Secretary EXHIBIT ~- CONDITIONS OF APPROVAL Site and Architectural Review Permit (PLN2016-219) Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMl1NITY DEVELOPMENT DEPARTMENT Planning Division 1. Approved Project: Approval is granted for a Site and Architectural Review Permit (PLN2016-219) to allow construction of a 629 square foot addition to an existing 1,265 square foot single-story single-family residence for a total floor area of 1,894 square feet on property located at 1045 Normandy Drive. The project shall substantially conform to the revised project plans stamped as received by the Planning Division on September 14, 2016, except as may be modified by the Conditions of Approval herein. 2. Permit Expiration: The Site and Architectural Review Permit approval shall be valid for one year from the date of final approval (expiring October 7, 2017). Within this one-year period, an application for a building permit must be submitted. Failure to meet this deadline will result in the Site and Architectural Review Permit being rendered void. 3. Planning Final Required: Planning Division clearance is required prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. 4. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ,ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. Exhibit A -Conditions of Approval 1045 Normandy Drive -Site and Architectural Review Permit (PLN2016-219) Pacae 2 of 6 5. Construction Activities: The applicant shall abide by the following requirements during construction: a. The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. b. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. c. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. d. Unnecessary idling of internal combustion engines shall be strictly prohibited. e. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. f. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. Public Works Division 6. Response Letter: Upon submittal of the Building Permit Application, the applicant shall provide an itemized response letter verifying that all the Public Works Conditions of Approval have been met or addressed. 7. Preliminary Title Report: Prior to issuance of any grading or building permits for the site, the applicant shall provide a current (within the past 6 months) Preliminary Title Report. 8. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee, currently set at $2,120.00 per net acre, which is $443.00. 9. stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District requirements, and the Campbell Municipal Code regarding stormwater pollution prevention. The primary objectives are to improve the quality and reducethe quantity of stormwater runoff to the bay. Exhibit A -Conditions of Approval 1045 Normandy Drive -Site and Architectural Review Permit (PLN2016-219) Page 3 of 6 Resources to achieve these objectives include Stormwater Best Management Practices Handbook for New Development and Redevelopment ("CA BMP Handbook") by the California Stormwater Quality Association (CASQA), 2003; Start at the Source: A Design Guidance Manual for Stormwater Quality Protection ("Start at the Source") by the Bay Area Stormwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for Stormwater Quality: A Companion Document to Start at the Source ("Using Site Design Techniques") by BASMAA, 2003. 10. Deferred Street Improvement Agreement: Prior to issuance of any grading or building permits for the site, the owner shall execute a deferred street improvement agreement for construction of standard street improvements. Unless otherwise approved by the City Engineer these improvements shall include, but are not limited to, removal and replacement of street pavement structural section to centerline, relocation of utility poles and facilities as required, installation of curb, gutter, sidewalk, ADA compliant driveways, street trees, street lights, necessary drainage facilities and necessary conforms to existing improvements. 11. Water Meter(s) and Sewer Cleanout(s): Existing and proposed water meter(s) and sewer cleanout(s) shall be relocated or installed on private property behind the public right-of-way line. 12. Utility Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services are to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for new utilities shall be used whenever possible. 13. Pavement Restoration: Based on the utility coordination plan, the applicant shall prepare a pavement restoration plan for approval by the City Engineer prior to any utility installation or abandonment. Streets that have been reconstructed or overlaid within the previous five years will require boring and jacking for all new utility installations. Normandy Drive has not been reconstructed or overlaid in the last 5 years. The pavement restoration plan shall indicate how the street pavement shall be restored following the installation or abandonment of all utilities necessary for the project. 14. Utility Encroachment Permit: Separate encroachment permits for the installation of utilities to serve the development will be required (including water, sewer, gas, electric, etc.). Applicant shall apply for and pay all necessary fees for utility permits for sanitary sewer, gas, water, electric and all other utility work. Exhibit A -Conditions of Approval 1045 Normandy Drive -Site and Architectural Review Permit (PLN2016-219) Page 4 of 6 15. Additional Street Improvements: Should it be discovered after the approval process that new utility main lines, extra utility work or other work is required to service the development, and should those facilities or other work affect any public improvements, the City may add conditions to the development/project/permit, at the discretion of the City Engineer, to restore pavement or other public improvements to the satisfaction of the City. Building Division To the satisfaction of the Building Division Manager/Building Official: 16. PERMITS REQUIRED: A building permit application shall be required for the proposed remodeling and addition to the existing structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 17. PLAN PREPARATION: Portions of this project require plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 18. CONSTRUCTION PLANS: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 19. SIZE OF PLANS: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 20. SITE PLAN: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. 21. TITLE 24 ENERGY COMPLIANCE: California Title 24 Energy Compliance forms CF-1 R and MF-1 R shall be blue-lined on the construction plans. 8% X 11 calculations shall be submitted as well. 22. SPECIAL INSPECTIONS: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Chapter 1, Section 106. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 23. The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The Exhibit A -Conditions of Approval 1045 Normandy Drive -Site and Architectural Review Permit (PLN2016-219) Paae 5 of 6 specification sheet (size 24" X 36") is available at the Building Division service counter. 24. APPROVALS REQUIRED: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. Bay Area Air Quality Management District (Demolitions Only) d. San Jose Water Company (279-7900) e. School District: i. Campbell Union School District (378-3405) ii. Campbell Union High School District (371-0960) iii. Moreland School District (379-1370) iv. Cambrian School District (377-2103) Note: To Determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. 25. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. 26. INTENT TO OCCUPY DURING CONSTRUCTION: Owners shall declare their intent to occupy the dwelling during construction. The Building Inspection Division may require the premises to be vacated during portions of construction because of substandard and unsafe living conditions created by construction 27. CONSTRUCTION FENCING: This project shall be properly enclosed with construction fencing to prevent unauthorized access to the site during construction. The construction site shall be secured to prevent vandalism and/or theft during hours when no work is being done. All protected trees shall be fenced to prevent damage to root systems 28. BUILD IT GREEN: Applicant shall complete and submit a "Build it Green" inventory of the proposed new single family project prior to issuance of building permit. 29. STORM WATER REQUIREMENTS: Storm water run-off from impervious surface created by this permitted project shall be directed to vegetated areas on the project parcel. Storm water shall not drain onto neighboring parcels Exhibit A -Conditions of Approval 1045 Normandy Drive -Site and Architectural Review Permit (PLN2016-219) Page 6 of 6 30. This project shall comply with the mandatory requirements for Residential Structures, Chapter 4 of the California Green Building Code 2013 ed. 31. This Structure, if classified as a new Single Family Dwelling under Chapter 18.32 of the Campbell Municipal Code, shall be equipped with residential fire sprinklers compliant with Section R313 of the California Residential Code 2013 ed.