Loading...
PC Res 4350RESOLUTION NO. 4350 BEING A RESOLUTION OF THE PLANNING COMMISSION OF. THE CITY OF CAMPBELL APPROVING A MODIFICATION (PLN2016-351) TO A PREVIOUSLY-APPROVED SITE AND ARCHITECTURAL REVIEW PERMIT (S 73-56) TO ALLOW THE INSTALLATION OF A NEW GUARDRAIL SYSTEM ALONG THE PERIMETER OF THE ROOF OF AN EXISTING COMMERCIAL . BUILDING LOCATED AT 503 & 504 VANDELL WAY. FILE NO.: PLN2016-351 After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents, the hearing was closed: The Planning Commission finds as follows with regard to file number PLN2016-351: 1. The project site is zoned C-M/40 (Controlled Manufacturing) on the City of Campbell Zoning Map. 2. The project site is designated Research and Development on'the City of Campbell General Plan Land Use diagram. 3. The project site is the Allergan manufacturing and storage facility located at the west end of Vandell Way (a cul-de-sac); east of Winchester Blvd. (across the light rail tracks), south of Hacienda Avenue and north of Division Street. 4. The proposed- project would allow for the installation of a new `Pararail Guardrail System' along the perimeter of the roof of an existing commercial building. 5. The proposed project will not result in the increas_ a of any floor area or change to lot coverage. Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The project will be consistent with the General. Plan; 2. The project will aid in the harmonious development of the immediate area; and 3. The project is consistent with applicable adopted design guidelines. 4. The project- is Categorically Exempt under Section 15301 of the California Environmental Quality Act (CEQA), pertaining to alterations to existing private structures involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. Planning Commission Resolution No. 4350 PLN2016-351 -Modification to Site and Architectural Approval (503 & 504 Vandell Way) Paae 2 of 2 THEREFORE, BE iT RESOLVED that the Planning Commission approves~a Modification (PLN2016-351) to apreviously-approved Site and Architectural Review Permit (`S' 73-56) to allow for the installation of anew `Pararail Guardrail System' along the perimeter of the roof of an existing .commercial building on property located at 503 & 504 Vandell Way, subject to the attached Conditions of Approval (attached Exhibit "A"). PASSED AND ADOPTED this 22"d day of November, 2016, by the following roll call vote: . AYES: Commissioners: Hernandez, Kendall, Reynolds, Rich and Young NOES: Commissioners: ABSENT: Commissioners ABSTAIN: Commissioners: APPROVED: 'l/ ~~`~ ~~~ vonne Kendall, Chair ,/ _ ATTEST: Paul rmoyan, Secretary EXHIBIT A CONDITIONS OF APPROVAL Modification (PLN2016-351) to Site and Architectural Review Permit (S 73-56) 503 & 504 Vandell !N_ay Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of .Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division 1. Approved Project: Approval is granted for a Modification (PLN2016-351) to a previously approved Site and Architectural Review Permit (S 73-56) to allow for the installation of a new `Pararail Guardrail System' along the perimeter of the roof of an. existing commercial building 'on property located 503 & 504 Vandell Way. The project shall substantially conform to the project plans received by the Planning Division on Ocfober 31, 2016, except as may be modified by the Conditions of Approval herein. 2. Plan Revisions: The building permit submittal construction plans shall incorporate the following revisions: a. Color: The `ParaRail' Guardrail System shall be indicated to be painted `white' to match the existing building. 3. Permit Expiration: The Modification to a Site and Architectural Review Permit approval shall be valid for one-year from the date of final approval (expiring December 2, 2017). Within this one-year period, an application for a building permit must be submitted. Failure to meet this deadline or expiration of an issued building permit will result in the approval being rendered void. 4. .Planning Final Required: Planning Division clearance is required prior to final Building Permit clearance. Construction not in substantial compliance with the approved project plans shall not be approved without .prior authorization of the necessary approving body. 5. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director. prior to installation of the lighting for compliance with all applicable. Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 6. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. Exhibit A -Conditions of Approval ~ Modification (PLN2016-351) Page 2 of 3 7. Construction Activities: The applicant shall abide by the following requirements during construction: - a. The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. b. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. c. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. d. Unnecessary idling of internal combustion engines shall be strictly prohibited. e. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. f: Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell: Building Division 8. Permits Required: A building permit application shall be required for the proposed work. The building permit shall include Electrical/ Plumbing Mechanical fees when such work is part of the permit. 9. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 10. Construction Plans:. The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 11.Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 12. Site Plan: Application for building permit shall include a competent site plan that identifies property .and proposed structures with dimensions and- elevations as appropriate. Site plan shall also include site drainage details. Elevation bench marks . shall be called out at all locations that are identified as- "natural grade" and intended for use to determine the height of the proposed structure. 13. Title 24 Energy Compliance: California Title 24. Energy Compliance forms shall be blue- lined on the construction plans. 8'/z X 11 calculations shall be submitted as well. 14.S~ecial Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be Exhibit A -Conditions of Approval ~ Modification (PLN2016-351) ~ Page 3 of 3 submitted to the Building Official for approval prior;to issuance of the building permits, in accordance with C.B,C Chapter 1, Section 106. Please obtain City of Campbell, Spircial In~spirction forms from the Building Inspection Division Counter. 15. Non-point Source Pollution: The City of Campbell, standard Santa Clara Valley Non- point Source Pollution Control Program .specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. . 16.Approvals Required: ,The project requires the following agency approval prior to issuance of the building ,permit: ~ - o Santa Clara County Fire Department (378-4010) 17. Storm Water Requirements: Storm water run-off from impervious surface created by this permitted project shall be directed to vegetated areas on the project parcel. Storm water shall not drain onto neighboring parcels. _5