PC Res 3580 RESOLUTION NO. 3580 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A SITE AND ARCHITECTURAL REVIEW PERMIT (PLN2004-65) FOR A NEW SINGLE-FAMILY RESIDENCE ON PROPERTY OWNED BY MR. NASIR A-EL Y ACY LOCATED AT 475 WALDO ROAD IN AN R-1-1O (SINGLE FAMILY RESIDENTIAL) ZONING DISTRICT. APPLICATION OF MR. NASIR A- ELYACY. FILE NO.: PLN2004-65. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application PLN2004-65: 1. The existing lot is a legal substandard lot size. The density of the proposed project site is 3.6 units per gross acre, which is not consistent with the General Plan land use designation of Low Density Residential (less than 3.5 units per gross acre), however, the subject lot is a pre- existing lot of record. 2. The proposed project is consistent with the R-1-10 (Single-Family Residential, 10,000 square foot minimum lot size) Zoning District in that it meets the minimum setbacks, height restriction, building coverage, floor area ratio and parking requirements of the R-1-10 Zoning District. 3. The project is consistent with the development standards and design guidelines of the San Tomas Area Neighborhood Plan. 4. The project consists of a new 3,728 square foot single-family residence with a building coverage of 23% and Floor Area Ratio of 38%. 5. The project provides six parking spaces where two parking spaces are required. 6. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood. 7. The proposed project is surrounded by single-family residences to the north, south, east and west. 8. The project qualifies as Categorically Exempt under Section 15303, Class 3 of the California Environmental Quality Act (CEQA) pertaining to the construction of one single-family residence. Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The proposed project is consistent with the General Plan and Zoning Ordinance Planning Commission Resolution No. 3580 PLN2004-65 - 475 Waldo Road - Site and Architectural Review Permit - New SFR Page 2 2. The proposed project, as conditioned, will aid III the harmonious development of the immediate area. 3. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required conditions of approval, will have a significant adverse impact on the environment. 4. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 5. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 6. There is a reasonable relationship and a rough proportionality between the conditions of approval and the impacts of the project. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission approves a Site and Architectural Review Permit (PLN2004-65) for a new single-family residence on property owned by Mr. Nasir A-Elyacy located at 475 Waldo Road in an R-1-10 (Single Family Residential) Zoning District, subject to the following conditions. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: 1. Approved Proiect: Approval is granted for a Site and Architectural Review Permit to allow the construction of a single-family residence located at 475 Waldo Road. The building design and site design shall substantially conform to the project exhibits listed below, except as may be modified by the conditions of approval herein: a. Project plans prepared by Betta Group received August 6, 2004 including a site plan, floor plans and elevations. Concept B is the approved roof design. b. Color/material board exhibit as received by the Planning Division on July 12, 2004. 2. Approval Expiration: The Site and Architectural Review Permit approval shall be valid for a period of one year from the date of final approval. Within this one-year period, a building permit must be obtained and construction completed one year thereafter or the Site and Architectural Review Permit shall be void. Planning Commission Resolution No. 3580 PLN2004-65 - 475 Waldo Road - Site and Architectural Review Permit - New SFR Page 3 3. Fences: Any existing or new fencing shall comply with Section 21.18.060 of the Campbell Municipal Code. Fencing along the property lines shall be replaced with a new fence at the expense of the applicant, unless it is determined to be in good condition by the Community Development Director. 4. Property Maintenance: The property is to be maintained free of any combustible trash, debris and weeds until the time that actual construction commences. All existing structures shall be secured by having windows boarded up and doors sealed shut, or be demolished or removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code.) 5. Parking and Driveways: All parking and driveway areas shall be developed in compliance with the approved plans and Chapter 21.28 (Parking and Loading) of the Campbell Municipal Code. 6. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 7. Construction Hours: Construction activities will be limited to the hours of 8:00 a.m. to 5:00 p.m. weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and Holidays unless an exception is granted by the Building Official. 8. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. Building Division: 9. Permits Required: A building permit application shall be required for the proposed new dwelling structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 10. Construction Plans: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 11. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 12. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. Planning Commission Resolution No. 3580 PLN2004-65 - 475 Waldo Road - Site and Architectural Review Permit - New SFR Page 4 13. Soils Report: Two copies of a current soils report, prepared to the satisfaction of the Building Official, containing foundation and retaining wall design recommendations shall be submitted with the building permit application. This report shall be prepared by a licensed engineer specializing in soils mechanics. 14. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. 15. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land surveyor shall be submitted to the project building inspector upon foundation inspection. This certificate shall certify compliance with the recommendations as specified in the soils report and the building pad elevation and on-site retaining wall locations and elevations are prepared according to approved plans. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer for the following items: a. pad elevation b. finish floor elevation (first floor) c. foundation corner locations 16. Title 24 Energv Compliance: California Title 24 Energy Compliance forms CF-1R and MF- 1R shall be blue-lined on the construction plans. 8% X 11 calculations shall be submitted as well. 17. Special Inspections: When a special inspection is required by UB.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with UB.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 18. Non-Point Source Control: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 19. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (379-1370) iv) Cambrian School District (377-2103) Planning Commission Resolution No. 3580 PLN2004-65 - 475 Waldo Road - Site and Architectural Review Permit - New SFR Page 5 Note: To Determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. d. Bay Area Air Quality Management District (Demolitions Only) 20. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. 21. Construction Fencing: This project shall be properly enclosed with construction fencing to prevent unauthorized access to the site during construction. The construction site shall be secured to prevent vandalism and/or theft during hours when no work is being done. All protected trees shall be fenced to prevent damage to root systems. PUBLIC WORKS DEPARTMENT 22. Plan Lines: Prior to issuance of any grading or building permits for the site, the applicant shall provide a plan layout showing the correct distance from the street centerline to the property line. 23. Work in the Public Right-of-Way: Prior to doing any work in the public right-of-way, the applicant shall obtain an encroachment permit, provide plans, pay fees and deposits, post security, and provide insurance. 24. Water Meter(s) and Sewer Cleanout(s): Proposed water meter(s) and sewer cleanout(s) shall be installed on private property behind the public right-of-way line. 25. Utilities: All on-site utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility compames. 26. Utility Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. Streets that have been resurfaced within the previous five years will require boring and jacking for all new utility installations. Waldo Road have been cape sealed in fiscal year 1998-99. Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. Planning Commission Resolution No. 3580 PLN2004-65 - 475 Waldo Road - Site and Architectural Review Permit - New SFR Page 6 27. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee of $2,000.00 per net acre, which is $455.00. PASSED AND ADOPTED this 24th day of August, 2004, by the following roll call vote: AYES: Commissioners: Alderete, Doorley, Francois, Hernandez, Rocha and Roseberry None Gibbons None NOES: ABSENT: ABSTAIN: Commissioners: Commissioners: Commissioners: APPROVED: ATTEST: