CC Resolution 12149RESOLUTION NO. 12149
BEING A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CAMPBELL APPROVING A PLANNED DEVELOPMENT
PERMIT (PLN2016-233) TO ALLOW CONSTRUCTION OF A SIX-
UNIT TOWNHOME BUILDING; A PARKING MODIFICATION
PERMIT (PLN2016-235) TO ALLOW CONSIDERATION OF
PRIVATE DRIVEWAYS AS GUEST PARKING; AND A MINOR
MODIFICATION (PLN2016-303) TO A PREVIOUSLY APPROVED
PLANNED DEVELOPMENT PERMIT (PLN2015-170) TO ALLOW
RECONFIGURATION OF PARKING STALLS WITHIN A
COMMON LOT OF THE 'MADISON' TOWNHOME PROJECT, ON
PROPERTY LOCATED AT 500 SAM CAVA LANE AND ALONG
LOTTIE LANE (FORMALLY 280 DILLON AVENUE, ET. AL.)
After notification and public hearing, as specified by law and after presentation by the
Community Development Director, proponents and opponents, the hearing was closed.
The City Council finds as follows with regard to File No. PLN2016-233, PLN2016-235, and
PLN2016-303:
Environmental Findin
1. Based on the proposed revised project description, the environmental review prepared
for the Infill Environmental Checklist/Mitigated Negative Declaration, and a
supplemental analysis, the City has concluded that the proposed revised project would
not result in any new significant impacts not previously disclosed in the adopted Infill
Environmental Checklist/Mitigated Negative Declaration nor would it result in a
substantial increase in the magnitude of any significant environmental impact
previously identified in the Infill Environmental Checklist/Mitigated Negative
Declaration. For these reasons, a Second Addendum to the adopted Infill
Environmental Checklist/Mitigated Negative Declaration for the revised Dillon Avenue
Townhomes and Apartments Project (aka "Madison") has been prepared and a
supplemental or subsequent Environmental Impact .Report or Infill Environmental
Checklist/Mitigated Negative Declaration is not required for the proposed revised
project.
Evidentiary Findings
1, At its meeting of November 3, 2014, the City Council adopted Ordinance No. 2185
approving a Planned Development Permit for a planned residential development
consisting of 81 townhome units (fee title ownership), 19 apartment (rental) units, and
associated on- and off-site improvements. The Planned Development Permit was
approved subject to a Tentative Vesting Subdivision Map approved by Resolution No.
11736 on October 21.2014.
2. At its meeting of July 22, 2015, the City Council adopted Resolution Nos. 11864 and
11865, approving a Modification to the approved Tentative Vesting Subdivision Map
~ City Council Resolution Page 2
~ Approval of a Planned Development Permit, Parking Modification Permit, and
a Minor Modification to a Planned Development Permit
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
3.
and Planned Development Permit, allowing development of the project in two phases
(i.e., recordation of a tract map and issuance of building and grading permits).
At its meeting of November 17, 2015, the City Council adopted Resolution No. 11921
and on December 1, 2015, Ordinance No. 2195, approving a Modification to the
approved Tentative Vesting Subdivision Map and a Modification to the approved
Planned Development Permit, respectively," to allow an expansion of the approved
project to include 90 in-fee townhome parcels/units and two apartment parcels (allow
28 rental units).
4. The overall project site is generally located near the southeast intersection of Sam
Cava Lane and Dillon Avenue, abutting the Campbell Public Works Maintenance
Corporation Yard to the south and the Los Gatos Creek Trail to the west. The parcel
subject to the proposed subdivision and development is located along Sam Cava Lane
as the street turns to become Gilman Avenue.
5. The submitted Planned Development Permit (PLN2016-233) would allow construction
of a six-unit townhome building as part of the overall approved project; the Parking
Modification Permit (PLN2016-235) would allow consideration of private driveways as
guest parking; and the Minor Modification (PLN2016-303) to a previously approved
Planned Development Permit (PLN2015-170) would allow reconfiguration of parking
stalls within a common lot of the 'Madison' townhome project
' 6. The subject parcel is zoned P-D (Planned Development) as shown on the Campbell
Zoning Map and designated Commercial/Med.-High Density Residential (14-27
units/gr. acre) as shown on the Campbell General Plan Map.
7. The subject parcel is within the boundaries of the South of Campbell Avenue (SOCA)
Plan, as incorporated within the Campbell General Plan Appendix Al-3.
8. The subject parcel may be subdivided and developed pursuant to the density
allowance for Sub-Area 3 (Dillon/Gilman) of the SOCA Plan because the subject
parcel, in combination with the entirety of the overall project, exceeds the minimum lot
size for the residential development in the 12-27 unit/acre range.
~ 9. The density of the expanded project is consistent with the allowable land use and
maximum density permitted by the Commercial/Med.-High Density Residential (14-27
units/gr. acre) and High Density Residential (21-27 units/gr. acre) General Plan land
~ use designations.
10. The expanded project would be consistent with the following SOCA and General Plan
policies and strategies. These policies encourage high quality development that is
oriented to the public street, and which is sensitive of the interface with the Los Gatos
Creek Trail.
City Council Resolution Page 3
Approval of a Planned Development Permit, Parking Modification Permit, and
a Minor Modification to a Planned Development Permit
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
• Policy LUT-16.2: Buildino Orientation: Orient buildings to a public street.
• Strategy LUT-16.2a: Residential Entries: Locate building entries facing the streets for all residential
units located along a public street.
• Policy LUT-16.3: Building and Site Design: Encourage high quality building and site design in the
SOCA Area.
• Strategy LUT-16.3a: Residential Entries: Design and Landscape screen structures within SOCA area
to minimize the perceived mass of the building as viewed from the Los Gatos Creek Trail and to
enhance the project's appearance as viewed from Highway 17.
11. The expanded project would also be consistent with the following General Plan policies
and strategies specified herein that encourage an overall "smart-growth" approach to
development within the City in that it would place high density, transit-oriented housing
in proximity to the Campbell Light Rail Station and Downtown Campbell:
• Strategy LUT-1.5a: Transit-Oriented Development: Encourage transit-oriented developments
including employment centers such as office and research and development facilities and the city's
highest density residential projects by coordinating the location, intensity, and mix of land uses with
transportation resources, such as Light Rail.
• Strategy LUT-2.11: Public Transit: Coordinate with regional transportation agencies including VTA
and the Metropolitan Transportation Commission (MTC) to improve public transportation service and
promote public transit as a viable alternative to driving, particularly within the Priority Development
Areas (PDA).
• Strategy LUT-3.1c: High Density Residential: Allow higher residential densities in the North of
Campbell Area (NOCA), South of Campbell Area (SOCA), and areas near the Light Rail stations as
an incentive to redevelop older, less intensive uses (see individual plans for allowed densities)
accessible to public transit.
12. Consideration of private driveways as guest parking substantially satisfies the intent of
the applicable parking requirement in that the driveways are sized to standard
residential park stall dimensions and will be reserved for guest use only as
implemented through a new requirement in the project's codes, covenants, and
restrictions (CC&Rs).
13. The reconfiguration of parking stalls (from parallel to perpendicular) within a common
lot the project does not add additional building square footage or substantially alter the
design or specifications approved by the site plan, and therefore may considered as a
'Minor Modification' to the approved Planned Development Permit.
Based upon the foregoing findings of fact, the City Council further finds and concludes
that:
The expanded development will clearly result in a more desirable environment and use
of the land than would be possible under any other zoning district classification.
2. The expanded development will be compatible with the General Plan of the City and
will aid in the harmonious development of the immediate area.
City Council Resolution Page 4
Approval of a Planned Development Permit, Parking Modification Permit, and
a Minor Modification to a Planned Development Permit
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
3. The expanded development will not result in allowing more residential units than would
be allowed by other residential zoning districts, which are consistent with the General
Plan designation of the property.
4. The expanded development will not be detrimental to the health, safety or welfare of
the neighborhood or the City as a whole.
5. There is a reasonable relationship and a rough proportionality between the Conditions
of Approval and the impacts of the project.
6. There is a reasonable relationship between the use of the fees imposed upon the
project and the type of development project.
7. Due to the unique nature and circumstances of the project, or special development
features, the anticipated number of parking spaces necessary to serve the use or
structure is less than that required by the applicable off-street parking standard, and
would be satisfied by the existing or proposed number of parking spaces, as supported
by review of the applicant's documentation and/or a parking demand study prepared by
a qualified transportation engineer accepted by the decision-making body.
8. Conditions of approval have been incorporated into the project to ensure the long-term
adequacy of the provided off-street parking.
9. Approval of the parking modification permit will further the purpose of this chapter
10. No substantial evidence has been presented from which a reasonable argument could
be made that shows that the project, as currently presented and subject to the required
conditions of approval, will have a significant adverse impact on the environment.
THEREFORE, BE IT RESOLVED that the City Council approves a Planned Development
Permit (PLN2016-233) to allow construction of a six-unit townhome building, a. Parking
Modification Permit (PLN2016-235) to allow consideration of private driveways as guest
parking, and a Minor Modification (PLN2016-303) to a previously approved Planned
Development Permit (PLN2015-170) to allow reconfiguration of parking stalls within a
common lot of the 'Madison' townhome project, on property located at 500 Sam Cava
Lane and along Lottie Lane (formally 280 Dillon Avenue, et. al.), subject to the attached
Conditions of Approval (attached Exhibit A).
City Council Resolution Page 5
Approval of a Planned Development Permit, Parking Modification Permit, and
a Minor Modification to a Planned Development Permit
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
PASSED AND ADOPTED this 18th day of April, 2017, by the following roll call vote:
AYES: COUNCILMEMBERS: Cristina, Landry, Waterman, Resnikoff
NOES: COUNCILMEMBERS: Gibbons
ABSENT: COUNCILMEMBERS: None
ABSTAIN: COUNCILMEMBERS: None
APPROVED: ~ ~S~
liz h "Liz" Gibbons, Mayor
ATTEST: .a~a
Wendy od, City Clerk
EXHIBIT A
CONDITIONS OF APPROVAL
Planned Development Permit (PLN2016-233)
Parking Modification Permit (PLN2016-235)
Minor Modification (PLN2016-303)
Where approval by the Director of Community Development, City Engineer, Public Works
Director, City Attorney or Fire Department is required, that review shall be for compliance
with all applicable conditions of approval, adopted policies and guidelines, ordinances,
laws and regulations and accepted engineering practices for the item under review.
Additionally, the applicant is hereby notified that he/she is required to comply with all
applicable Codes or Ordinances of the City of Campbell and the State of California that
pertain to this development and are not herein specified.
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division:
1. Approved Proiect: Approval is granted for a Planned Development Permit (PLN2016-
233) to allow construction of a six-unit townhome building, a Parking Modification
Permit (PLN2016-235) to allow consideration of private driveways as guest parking,
and a Minor Modification (PLN2016-303) to a previously approved Planned
Development Permit (PLN2015-170) to allow reconfiguration of parking stalls within a
common lot of the 'Madison' townhome project, on property located at 500 Sam Cava
Lane and along Lottie Lane (formally 280 Dillon Avenue, et. al.). The project shall
substantially conform to the Revised Project Plans (including architectural, civil, and
landscaping sheets), dated as received by the March 14, 2017, except as may be
modified by the Conditions of Approval herein.
~ 2. Permit Expiration: This Approval is valid for a period of two (2) years from the date of
City Council approval unless an extension is granted prior to the expiration date.
3. Previous Conditions of Approval: The conditions of approval contained herein shall be
considered additional to those provided by City Council Ordinance No. 2195 (Modified
Planned Development Permit PLN2015-170).
4. Tract Map: The Planned Development Permit approval is contingent upon recordation
of the Tract Map to divide the subject property. The Tract Map shall be recorded prior
to the issuance of building or grading permits.
5. Architectural Refinements: Architectural refinements to the project that would not
substantially alter the design as determined by the Community Development Director,
including but not limited to the use of front porches and stoops, may be administratively
~ reviewed and approved by the Community Development Director prior to issuance of
;building permits.
6. Landscaping Plan: The construction drawings for a building permit shall include a
"final" landscaping plan, including irrigation details and associated calculations, in
Conditions of Approval Page 2
P-D Permit, Parking Modification Permit, and a Minor Modification
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
compliance with Chapter 2.7, Division 2, of Title 23 of the California Code of
Regulations as adopted by the Campbell water-efficient landscape guidelines.
7. Equal Access: As codified within the project's CC&Rs, the Home Owners Association
shall maintain equal access to all common facilities and amenities by all residents
(renters and homeowners) of the project.
Utility Boxes and Back-Flow Preventers: The applicant shall submit a plan prior to
installation of the underground PG&E utility (transformer) boxes and San Jose Water
Company back-flow preventers, indicating the location of the boxes for approval by the
Community Development Director.
~' 9. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and
directed on site in compliance with City of Campbell Lighting Design Standards (CMC
~~ 21.18.090). However, lighting along the private roadways shall be of sufficient
illumination to ensure the security of the development. The design and type of lighting
I' fixtures and lighting intensity of any proposed exterior lighting for the project shall be
reviewed and approved by the Community Development Director. Lighting fixtures shall
be of a decorative design to be compatible with the residential development and shall
I incorporate energy saving features.
10. Pad Certification: Following site grading and prior to preparation of individual building
pad forms, the following improvements shall be certified by a licensed land surveyor
and reviewed by the Community Development Director to determine consistency with
the Planning Commission recommended plan (grade, pad and drainage).
11. Residential Address Identification: The applicant shall submit a detail sheet showing
uniform residential address identification material type and location on the building wall
for review and approval by the Community Development prior to the issuance of
Building Permits. In order to obtain approval, numbers or addresses shall be placed on
all new and existing buildings in such a position as to be plainly visible and legible from
the street or road fronting the property. Additionally, number material and color is
required to contrast with their background.
12. Property Maintenance: The property is to be maintained free of any combustible trash,
debris, and weeds until the time that actual construction commences. Any vacant
existing structures shall be secured, by having windows boarded up and doors sealed
shut, or be demolished or removed from the property (Section 11.201 and 11.414,
1985 Ed. Uniform Fire Code).
13. Stormwater and Grading Requirements: The project shall comply with City stormwater
and grading requirements (CMC Sec. 20.80.020, 21.16.100, and 14.02), as more
specifically itemized in the Public Works Department Conditions of Approval for the
Tentative Vesting Subdivision Map.
Conditions of Approval Page 3
P-D Permit, Parking Modification Permit, and a Minor Modification
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
14'. Sound Attenuation: The project shall comply with the City Residential Noise Standards
(CMC 21.16.070.E) through incorporation of attenuation measures specified in the
project's acoustic analysis.
15. Soil Remediation: Any soil remediation that may be necessary shall be completed
pursuant to CMC 21.18.080.6 prior to issuance of building permits
16. Cultural Resources: If archaeological or paleontological resources are encountered
during excavation or construction, construction personnel shall be instructed to
immediately suspend all activity in the immediate vicinity of the suspected resources
and the City and a licensed archeologist or paleontologist shall be contacted to
evaluate the situation. A licensed archeologist or paleontologist shall be retained to
inspect the discovery and make any necessary recommendations to evaluate the find
under current CEQA guidelines prior to the submittal of a resource mitigation plan and
monitoring program to the City for review and approval prior to the continuation of any
on-site construction activity.
17. Human Remains: In the event a human burial or skeletal element is identified during
excavation or construction, work in that location shall stop immediately until the find
can be properly treated in compliance with § 7050.5 of the California Health and Safety
Code and § 5097.94 of the California Public Resources Code. The City and the Santa
Clara County Coroner's office shall be notified. If deemed prehistoric, the Coroner's
office would notify the Native American Heritage Commission who would identify a
"Most Likely Descendant (MLD)." The archeological consultant and MLD, in conjunction
with the project sponsor, shall formulate an appropriate treatment plan for the find,
which might include, but not be limited to, respectful scientific recording and removal,
being left in place, removal and reburial on site, or elsewhere. Associated grave goods
are to be treated in the same manner.
18. Construction Activity: The following standards shall apply to construction of the project:
~ Mitigation Measure A/R-1: The project applicant shall ensure that construction plans
include the BAAQMD Best Management Practices for fugitive dust control. The
' following will be required for all construction activities within the project area. These
measures will reduce fugitive dust emissions primarily during soil movement,
grading and demolition activities, but also during vehicle and equipment movement
on unpaved project sites:
a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded
areas, and unpaved access roads) shall be watered two times per day.
b. All haul trucks transporting soil, sand, or other loose material off-site shall be
covered.
c. All visible mud or dirt track-out onto adjacent public roads shall be removed
using wet power vacuum street sweepers at least once per day. The use of dry
power sweeping is prohibited. ,
Conditions of Approval Page 4
P-D Permit, Parking Modification Permit, and a Minor Modification
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
d. All vehicle speeds on unpaved roads shall be limited to 15 mph. .
e. All streets, driveways, and sidewalks to be paved shall be completed as soon as
possible. Building pads shall be laid as soon as possible after grading unless
' seeding or soil binders are used.
f. Idling times shall be minimized either by shutting equipment off when not in use
or reducing the maximum idling time to 5 minutes (as required by the California
airborne tox.ics control measure Title 13, Section 2485 of CCR). Clear signage
shall be provided for construction workers at all access points.
~ g. All construction equipment shall be maintained and properly tuned in
~ accordance with manufacturer's specifications. All equipment shall be checked
by a certified mechanic and determined to be running in proper condition prior
i to operation.
h. A publicly visible sign shall be posted with the telephone number and person to
~b contact at the Lead Agency regarding dust complaints. This person shall
'i respond and take corrective action within 48 hours. BAAQMD's phone number
shall also be visible to ensure compliance with applicable regulations.
• Mitigation Measure A/R-2: The project applicant shall ensure that construction
contract specifications include a requirement that all off-road diesel-powered
construction equipment used for project improvements be equipped with a Level3
Verified Diesel Emissions Control (VDEC).
• Construction Hours (CMC 18.04.052): Construction activity shall be limited to the
' hours of eight a.m. and five p.m. daily, Monday through Friday. Saturday hours of
construction shall be nine a.m. and four p.m. There shall be no construction activity
i on Sundays or National Holidays.
• Construction Noise (CMC 18.04.052): No loud environmentally disruptive noise over
I fifty dbs., such as air compressors without mufflers, continuously running motors or
generators, loud playing musical instruments or radios will be allowed during the
authorized hours of construction, Monday through Saturday, where such noise may
be a nuisance to adjacent residential neighbors. Such nuisances shall be
discontinued.
• Contractor Contact Information Posting: The project site shall be posted with the
name and contact number of the lead contractor in a location visible from the public
street prior to issuance of building permits.
Building Division:
19. Permits Required: A building permit application shall be required for each proposed
new townhouse living unit and/or structure. The building permit shall include
Electrical/Plumbing/Mechanical fees when such work is part of the permit.
20. Construction Plans: The Conditions of Approval shall be stated in full on the cover
~ sheet of construction plans submitted for building permit. ,
Conditions of Approval Page 5
P-D Permit, Parking Modification Permit, and a Minor Modification
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
21. Staging/Sales and Occupancy: Prior to grant of occupancy, the applicant shall provide
a final occupancy plan demonstrating how the project will be staged for sales and how
' structures will be visited by prospective buyers. Plan shall also indicate how completed
units will be occupied while other units are still being constructed.
~ 22. Size of Plans: The minimum size of construction plans submitted for building permits
~ shall be 24 inches by 36 inches.
23. Plan Preparation: This project requires plans prepared under the direction and
oversight of a California licensed Engineer or Architect. Plans submitted for building
permits shall be "wet stamped" and signed by the qualifying professional person.
24, Soils Report: As required by the CMC Sec. 21.18.130 all new development shall
conform to the California Building Code provisions regarding engineering and
geotechnical analysis. Two copies of a current soils report, prepared to the satisfaction
of the Building Official, containing foundation and retaining wall design
recommendations shall be submitted with the building permit application. This report
shall be prepared by a licensed engineer specializing in soils mechanics.
' 25. Site Plan: Application for building permit shall include a competent site plan that
identifies property and proposed structures with dimensions and elevations as
appropriate. Site plan shall also include site drainage details.
26. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land
surveyor shall be submitted to the project building inspector upon foundation
inspection. This certificate shall certify compliance with the recommendations as
~ specified in the soils report and the building pad elevation and on-site retaining wall
I locations and elevations are prepared according to approved plans. Horizontal and
i vertical controls shall be set and certified by a licensed surveyor or registered civil
engineer for the following items:
a. pad elevation
b. finish floor elevation (first floor)
c. foundation corner locations
27. Title 24 Energy Compliance: California Title 24 Energy Compliance forms shall be
blue-lined on the construction plans. 8% X 11 calculations shall be submitted as well.
28. Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the
architect or engineer of record shall prepare an inspection program that shall be
submitted to the Building Official for approval prior to issuance of the building permits,
in accordance with C.B.C Appendix 1, Section 106. Please obtain City of Campbell
Special Inspection forms from the Building Inspection Division Counter.
29. Non-Point Source Pollution Control: The City of Campbell standard Santa Clara Valley
Non-point Source Pollution Control Program specification sheet shall be part of plan
Conditions of Approval Page 6
P-D Permit, Parking Modification Permit, and a Minor Modification
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
submittal. The specification sheet (size 24" X 36") is available at the Building Division
service counter.
~ 30. Approvals Required: The project requires the following agency approval prior to
issuance of the building permit:
a. West Valley Sanitation District (378-2407)
b. Santa Clara County Fire Department (378-4010).
c. Bay Area Air Quality Management District (Demolitions Only)
d. School District:
i. Campbell Union School District (378-3405)
ii. Campbell Union High School District (371-0960)
iii. Moreland School District (379-1370)
iv. Cambrian School District (377-2103)
Note: To determine your district, contact the offices identified above. Obtain the School
District payment form from the City Building Division, after the Division has approved
the building permit application.
31. P.G. & E.: The applicant is advised to contact P.G. &E. as early as possible in the
i approval process. Service installations, changes and/or relocations may require
substantial scheduling time and can cause significant delays in the approval process.
The applicant should also consult with P.G. & E. concerning utility easements,
distribution pole locations and required conductor clearances.
32. Construction Fencing: This project shall be properly enclosed with construction fencing
' to prevent unauthorized access to the site during construction. The construction site
shall be secured to prevent vandalism and/or theft during hours when no work is being
done. All protected trees shall be fenced to prevent damage to root systems.
FIRE DEPARTMENT
33. Fire Review: Review of this Developmental proposal is limited to acceptability of site
access and water supply as they pertain to fire department operations, and shall not be
construed as a substitute for formal plan review to determine compliance with adopted
model codes. Prior to performing any work the applicant shall make application to, and
receive from, the Building Department all applicable construction permits.
34. Automatic Fire Sprinkler System Required: Approved automatic sprinkler systems in
new and existing buildings and structures shall be provided in the locations described
in this Section or in Sections 903.2.1 through 903.2.18 whichever is the more
restrictive. For the purposes of this section, firewalls used to separate building areas
shall be constructed in accordance with the California Building Code and shall be
without openings or penetrations. An automatic sprinkler system shall be provided
throughout all new buildings and structures. Exception: Group A, B, E, F, I, L, M, S and
U occupancy buildings and structures that do not exceed 1,000 square feet of building
area. NOTE: The owner(s), occupant(s) and any contractor(s) or subcontractor(s) are
responsible for consulting with the water purveyor of record in order to determine if any
Conditions of Approval Page 7
P-D Permit, Parking Modification Permit, and a Minor Modification
File No.: PLN2016-233, PLN2016-235, and PLN2016-303
modification or upgrade of the existing water service is required. NOTE: Covered
porches, patios, balconies, and attic spaces may require fire sprinkler coverage. A
State of California licensed (C-16) Fire Protection Contractor shall submit plans,
calculations, a completed permit application and appropriate fees to this department for
review and approval prior to beginning their work. Section 903.2 as adopted and
amended by CBLMC.
35. Water Supply Requirement: Potable water supplies shall be protected from
contamination caused by fire protection water supplies. It is the responsibility of the
applicant and any contractors and subcontractors to contact the water purveyor
supplying the site of such project, and to comply with the requirements of that purveyor.
Such requirements shall be incorporated into the design of any water-based fire
protection systems, and/or fire suppression water supply systems or storage containers
that may be physically connected in any manner to an appliance capable of causing
contamination of the potable water supply of the purveyor of record. Final approval of
the system(s) under consideration will not be granted by this office until compliance
with the requirements of the water purveyor of record are documented by that purveyor
as having been met by the applicant(s). 2010 CFC Sec. 903.3.5 and Health and Safety
Code 13114.7.
36. Construction Site Fire Safety: All construction sites must comply with applicable
provisions of the CFC Chapter 14 and our Standard Detail and Specification SI-7.
Provide appropriate notations on subsequent plan submittals, as appropriate to the
project. CFC Chp. 33.
37. Premises Identification: Approved numbers or addresses shall be placed on all new
and existing buildings in such a position as to be plainly visible and legible from the
street or road fronting the property. Numbers shall contrast with their background. CFC
Sec. 505.
PUBLIC WORKS DEPARTMENT
38. Tentative Vesting Subdivision Map: All Conditions of Approval of the Vesting Tentative
Subdivision Map (PLN2016-234) shall be implemented and fulfilled to the satisfaction
of the City Engineer.