CC Resolution 12157RESOLUTION NO. 12157
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL
ACCEPTING IMPROVEMENTS FOR VIRGINIA AVENUE SIDEWALK IMPROVEMENT
PROJECT, FILE THE NOTICE OF COMPLETION, AND AUTHORIZE
A BUDGET ADJUSTMENT
WHEREAS, on June 30, 2016, the Director of Public Works awarded a construction
contract to JJR Construction, Inc. for the construction of the Virginia Avenue Sidewalk
Improvement Project 14-HH; and
WHEREAS, JJR Construction, Inc. completed installation of various improvements in
accordance with the project plans and specifications for the Virginia Avenue Sidewalk
Improvement Project 14-HH; and
WHEREAS, $12,330 in CIPR Funds has been identified to offset project expenditures;
and
WHEREAS, a budget adjustment has been prepared for transferring $12,330 from the
CIPR fund into the Virginia Avenue Sidewalk Improvement Project 14-HH.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Campbell
hereby accepts the improvements constructed by JJR Construction, Inc. for the Virginia
Avenue Sidewalk Improvement Project 14-HH, directs the City Engineer to file the
Notice of Completion, and authorizes the Finance Director to execute a budget
adjustment in the amount of $12,330.
PASSED AND ADOPTED this 16~h day of May, 2017 by the following roll call vote
AYES: COUNCILMEMBERS: Cristina, Landry, Waterman, Resnikoff
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Gibbons
APPROVED:
~~ ~~
Paul Resnikoff, Vice May r
ATTEST:
Wendy ood, City Clerk
Recording Requested by and
when recorded, mail to:
City of Campbell
City Clerk's Office
70 North Airs[ Street, City Hall -Upper Level
Campbell, CA 95008
(A08)866-2150
`~s ~ c,t,yA CITY OF CAMPBELL
~> r:~ ~--~ ?, NOTICE OF COMPLETION AND ACCEPTANCE
`'`` >~`"= = OF PUBLIC WORKS CONTRACT
U h '~ r M1
° A
'F °KI'l1 AM1° y
This document is for the benefit of the City of Campbell. Request for the Recordation without fee is made in accordance
with Section 6103 of the Government Code of the State of California.
Contractor's Name: JJR Construction, Inc. Contract Date: 7/25/2016
Surety: Great American Insurance Company Final Contract
Amount: $992,664.00
Job Title: Project 14-HH: Virginia Avenue Sidewalk Improvement Project
Location: Virginia Avenue between Budd Avenue and Hacienda Avenue in Campbell, CA
Scope of Work: The project includes the installation of sidewalk, accessibility ramps, street trees, signing and striping, curb
and gutter, accessible driveways, and storm drain, and utility relocation. Sharrows and other signage and pavement markings
were added to encourage bicycle usage within the project limits. New storm drain inlets were installed to address drainage
conditions created by the installation of the proposed improvements. In order to install these inlets new storm drain lines and
manholes were installed to connect these new inlets to the existing storm drain system. Additionally, existing roadway grades
were adjusted to provide proper conforms to the pedestrian improvements. The existing curb ramps and some of the existing
sidewalk and driveways that did not meet ADA requirements were removed and replaced with ADA compliant improvements.
Both underground and overhead utilities were relocated to accommodate the new storm drain and sidewalk improvements.
Owner: City of Campbell, City Hall, 70 North Street, Upper Level, Campbell, CA 95008
This work was accepted by me on 5/17/2017, on behalf of the City of Campbell. I certify under pena]ty of perjury that the
foregoing is true and correct. (C.C.P. 2015.5)
Executed on 5/17/2017
at Campbell, California
Amy Olay, City Engineer
Department of Public Works
City of Campbell