PC Res 4405RESOLUTION NO. 4405 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A SITE AND ARCHITECTURAL REVIEW PERMIT (PLN2017-48) TO ALLOW CONSTRUCTION OF A NEW 3,063 SQUARE-FOOT TWO-STORY SINGLE-FAMILY HOME REUSING PORTIONS OF THE EXISTING STRUCTURE AND RESULTING IN A FLOOR AREA RATIO EXCEEDING 45 PERCENT (APPROXIMATELY 48 PERCENT PROPOSED) ON PROPERTY LOCATED AT 330 HARRISON AVENUE. After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. The Planning Commission finds as follows with regard to file number PLN2017-48: Environmental Finding 1. The project qualifies as a Categorically Exempt project per Section 15303, Class 3 of the California Environmental Quality Act (CEQA), pertaining to the construction of single-family dwellings. Evidentiary Findings 1. The project site is zoned R-1-6 (Single Family Residential) on the City of Campbell Zoning Map. 2. The project site is designated Low Density Residential (<6 units/gr. acre) on the City of Campbell General Plan Land Use diagram. 3. The project site is asingle-family residential property located on the east side of Harrison Avenue, south of Hamilton Avenue, and north of Tubby Street. 4. The project would allow for construction of a new 3,063 square-foot two-story single- family home resulting in a floor area ratio exceeding 45% (approximately 48% proposed). 5. The project requires review and approval of a Site and Architectural Review Permit due the proposed floor area ratio exceeding 45 percent. 6. The project incorporates steps and breaks in otherwise long building walls to reduce mass and enhance visual interest. 7. The project uses different materials and finishes to break up the fapade and keep the home from appearing too massive or boxy. 8. The design locates the second story at a significant setback from the front property line and maintains the front portion of the home as one-story for consistency with the adjacent one-story homes. Planning Commission Resolution No. 4405 330 Harrison Avenue -Site and Architectural Review Permit (PLN2017-48) Page 2 of 3 9. The building architecture and material selections are responsive to the existing building and neighborhood context which exhibits similar/matching features and designs. 10. The overall building height is well below what is allowed (26 feet 2 inches vs. 35 feet allowed). 11. No substantial evidence has been presented which shows that the project, as currently presented and subject to the required Conditions of Approval, will have a significant adverse impact on the environment. 12. There is a reasonable relationship and a rough proportionality between the Conditions of Approval and the impacts of the project. 13. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. Based upon the foregoing findings of fact and pursuant to Campbell Municipal Code Sec. 21.09.030 (Table 2-3) and 21.42.060(8) the Planning Commission further finds and concludes that: 1. The project will be consistent with the General Plan; 2. The project will aid in the harmonious development of the immediate area; 3. The project is consistent with applicable adopted design guidelines; 4. The perceived scale and mass of the home is compatible with the adjacent homes and the homes in the surrounding area; and 5. The home minimizes the use of design features that make it appear significantly larger than the adjacent homes and homes in the surrounding area. THEREFORE, BE IT RESOLVED that the Planning Commission approves a Site and Architectural Review Permit (PLN2017-48) to allow construction of a new 3,063 square- foot two-story single-family home reusing portions of the existing structure and resulting in a floor area ratio exceeding 45% (approximately 48% proposed) on property located at 330 Harrison Avenue, subject to the attached Conditions of Approval (attached Exhibit «A„ Planning Commission Resolution No. 4405 330 Harrison Avenue -Site and Architectural Review Permit (PLN2017-48) Page 3 of 3 PASSED AND ADOPTED this 8t" day of August, 2017, by the following roll call vote: AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners ABSTAIN: Commissioners: APPROVED: ~~`~ ~~~// ~~r vonne Kendall, Chair ATTEST: Paul Kerrriloyan, Secretary EXHIBIT A CONDITIONS OF APPROVAL Site and Architectural Review Permit (PLN2017-48) Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division Approved Project: Approval is granted for a Site and Architectural Review Permit (PLN2017-48) allowing construction of a new 3,063 square-foot two-story single-family home reusing portions of the existing structure and resulting in a floor area ratio exceeding 45% (approximately 48% proposed) on property located at 330 Harrison Avenue within the R-1-6 (Single-Family Residential) Zoning District. The project shall substantially conform to the project plans stamped as received by the Planning Division on June 26, 2017, except as may be modified by the conditions of approval herein. 2. Existing Protected Tree: Unless a Tree Removal Permit application is submitted and approved prior to building permit submittal, the construction plans shall be revised to identify the existing back yard tree as "Protected Ash Tree to remain and be protected. Tree Removal Permit required for future removal." 3. Revisions to Plans: The construction plans submitted fora building permit shall incorporate the following revisions: a. Revise the Site Plan and First Floor Plan as necessary to confirm a minimum setback of 20 feet is provided from the front property line to the front of the porch columns and/or building wall. b. Revise the Site Plan and Landscape Plan to replace the proposed turf blocks along the driveway with plant material. 4. Exterior Stairs: No exterior stairs to the second floor deck shall be allowed without approval by the Planning Commission of a Modification to a previous Site and Architectural Review Permit. 5. Water Efficient Landscape Standards: As a new construction project with a total project landscape area equal to or less than 2,500 square feet, this project is subject to the updated California Model Water Efficient Landscape Ordinance (MWELO) and may comply with the Prescriptive Compliance Option in Appendix D. This document is available at: http://www.cityofcampbell.com/DocumentCenter/View/176 or on the Planning Division's Zoning and Land Use webpage through www.cityofcampbell.com. The building permit application submittal shall demonstrate compliance with the applicable MWELO and landscaping requirements for the required front yard landscaping and shall include the following: Exhibit A -Conditions of Approval ~ 330 Harrison Avenue File No. PLN2017-48 Paae 2 of 7 a. Planting and Irrigation Plans that meet all requirements of the Prescriptive Compliance Option in Appendix D for the required front yard landscaping. Any additional landscaping associated with this project will be subject to the MWELO. b. A completed Landscape Information Form. c. A note on the Cover Sheet in minimum 1/2" high lettering stating "Planning Final Required. The new landscaping indicated on the plans must be installed prior to final inspection. Changes to the landscaping plan require Planning approval." 6. Permit Expiration: The Site and Architectural Review Permit approval shall be valid for one year from the date of final approval (expiring August 18, 2018). Within this one-year period, an application for a building permit must be submitted. Failure to meet this deadline will result in the Site and Architectural Review Permit being rendered void. 7. Planning Final Required: Planning Division clearance is required prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. Please add a note to the cover sheet of the project plans indicating this requirement (i.e. Planning Final Required). 8. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Section 21.18.060 of the Campbell Municipal Code and shall be submitted for review and approval by the Community Development Department. 9. Compliance with Other Regulations: The applicant shall comply with other state, county, and city ordinances that pertain to the proposed project and where they are conducted. 10. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 11.On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 12. Roof Vents: The applicant shall coordinate mechanical and plumbing plans to minimize the number of roof vents that are visible from the street frontage. The applicant shall provide the location of such vents on the building plan elevations and roof plans, to the satisfaction of the Community Development Director, prior to issuance of a building permit. 13. Construction Activities: The applicant shall abide by the following requirements during construction: Exhibit A -Conditions of Approval ~ 330 Harrison Avenue File No. PLN2017-48 Page 3 of 7 a. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. b. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. c. Unnecessary idling of internal combustion engines shall be strictly prohibited. d. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. e. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. Building Division 14. Permits Required: A building permit application shall be required for the proposed remodeling and addition to the existing structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 15. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 16. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 17. Plan Preparation: This addition may require plan prepared under the direction and oversight of a California licensed Engineer or Architect. When applicable, plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 18. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. 19. Seismic Requirements: Additions and Alterations to (e) residential structures shall comply with Section 3404 of the 2013 California Building Code (CBC). 20. Title 24 Energy Compliance: California Title 24 Energy Compliance forms shall be blue- lined on the construction plans. 8'/2 X 11 calculations shall be submitted as well. 21. Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Chapter 1, Section 106. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 22. Non-Point Source: The standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. Exhibit A -Conditions of Approval ~ 330 Harrison Avenue File No. PLN2017-48 Page 4 of 7 23.Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. School District: i. Campbell Union School District (378-3405) ii. Campbell Union High School District (371-0960) iii. Moreland School District (379-1370) iv. Cambrian School District (377-2103) Note: To determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. d. Bay Area Air Quality Management District (Demolitions Only) e. San Jose Water Company (279-7900) 24. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. 25. Intent to Occupy During Construction: Owners shall declare their intent to occupy the (e) dwelling during construction. The Building Inspection Division may require the premises to be vacated during portions of construction because of substandard and unsafe living conditions created by construction. 26. Build It Green: Applicant shall complete and submit a "Build it Green" inventory of the proposed new single family project prior to issuance of building permit. 27. CalGreen: This project shall comply with the mandatory requirements for Residential Structures, Chapter 4 of the California Green Building Code 2013 ed. 28. Storm Water Requirements: Storm water run-off from impervious surface created by this permitted project shall be directed to vegetated areas on the project parcel. Storm water shall not drain onto neighboring parcels. Public Works Department 29. Storm Drain Area Fee: Prior to the issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee of $2,120.00 per net acre, which is $371.00. 30. Encroachment Permit/Fees/Deposits: The applicant shall obtain an encroachment permit (including fees, surety and insurance) from the Public Works Department for the construction of the following public improvements: Exhibit A -Conditions of Approval ~ 330 Harrison Avenue File No. PLN2017-48 Page 5 of 7 a. Construct City standard curb and gutter along property frontage. b. Construct Accessible compliant driveway approach. c. Repair any damaged sidewalk along property frontage. d. Remove concrete from park/landscape strip. 31. Street Improvements Completed for Occupancy and Building Permit Final: Prior to allowing occupancy and/or final building permit signoff for any and/or all buildings, the applicant shall have the required street improvements and any pavement restoration installed and accepted by the City. 32. Water Meter: The project has an existing water meter installed in the public right-of-way. If the water service is required to be upsized as part of the project (i.e. due to fire sprinklers), then the new water meter shall be installed on private property behind the public right-of-way line. 33. Water Meter(s) and Sewer Cleanout(s): Any new water meter(s) and/or sewer cleanout(s) shall be installed on private property behind the public right-of-way line. 34.The following conditions only apply if the applicant has a need to install /upgrade utility services (water, sewer, gas, etc.) in the street: a. Utility Encroachment Permit: Separate permits for the installation of utilities to serve the development will be required (including water, sewer, gas, electric, etc.). Applicant shall apply for and pay all necessary fees for utility permits for sanitary sewer, gas, water, electric and all other utility work. b. Utility Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services are to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for new utilities shall be used whenever possible. c. Pavement Restoration: Based on the utility coordination plan, the applicant shall prepare a pavement restoration plan for approval by the City Engineer prior to any utility installation or abandonment. Streets that have been reconstructed or overlaid within the previous five years will require boring and jacking for all new utility installations. Harrison Avenue has not been reconstructed or overlaid in the last 5 years. The pavement restoration plan shall indicate how the street pavement shall be restored following the installation or abandonment of all utilities necessary for the project. 35. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District Exhibit A -Conditions of Approval ~ 330 Harrison Avenue File No. PLN2017-48 Paae 6 of 7 requirements, and the Campbell Municipal Code regarding stormwater pollution prevention. The primary objectives are to improve the quality and reduce the quantity of stormwater runoff to the bay. Resources to achieve these objectives include stormwater Best Management Practices Handbook for New Development and Redevelopment ("CA BMP Handbook") by the California stormwater Quality Association (CASQA), 2003; Start at the Source: A Design Guidance Manual for stormwater Quality Protection ("Start at the Source") by the Bay Area stormwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for stormwater Quality: A Companion Document to Start at the Source ("Using Site Design Techniques") by BASMAA, 2003. Fire Department 36. Plans not approved. To prevent plan review and inspection delays, the noted Developmental Review Conditions shall be addressed as "notes" on all pending and future plan submittals and any referenced diagrams to be reproduced onto the future plan submittal: a. Comment #1: Review of this Developmental proposal is limited to acceptability of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall make application to, and receive from, the Building Department all applicable construction permits. b. Comment #2: Fire Sprinklers Required: An automatic residential fire sprinkler system shall be installed in one- and two-family dwellings as follows: In all new one- and two-family dwellings and in existing one- and two-family dwellings when additions are made that increase the building area to more than 3,600 square feet. Exception: Aone-time addition to an existing building that does not total more than 1,000 square feet of building area. NOTE: The owner(s), occupant(s) and any contractor(s) or subcontractor(s) are responsible for consulting with the water purveyor of record in order to determine if any modification or upgrade of the existing water service is required. A State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to this department for review and approval prior to beginning their work. CRC Sec. 313.2 as adopted and amended by CBLMC c. Comment #3: Water Supply Requirements: Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any Exhibit A -Conditions of Approval ~ 330 Harrison Avenue File No. PLN2017-48 Paae 7 of 7 manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 2010 CFC Sec. 903.3.5 and Health and Safety Code 13114.7 d. Comment #4: Construction Site Fire Safety: All construction sites must comply with applicable provisions of the CFC Chapter 33 and our Standard Detail and Specification SI-7. Provide appropriate notations on subsequent plan submittals, as appropriate to the project. CFC Chp. 33 e. Comment #5: Address identification. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Where required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address numbers shall be maintained. CFC Sec. 505.1