Loading...
CC Resolution 12363 RESOLUTION NO. 12363 BEING A RESOLUTION OF CITY COUNCIL OF THE CITY OF CAMPBELL APPROVING A MAJOR MODIFICATION (PLN2018- 213) TO A PREVIOUSLY APPROVED PLANNED DEVELOPMENT PERMIT (PD 82-09) TO ALLOW CONSTRUCTION OF A 550 SQUARE-FOOT ACCESSORY STRUCTURE WITHIN THE HERITAGE VILLAGE APARTMENTS ON PROPERTY LOCATED AT 23 HERITAGE VILLAGE LANE. FILE NO.: PLN2018-213 After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. The City Council finds as follows with regard to file numbers PLN2018-213: Evidentiary Findings 1. The project site is the Heritage Village Apartments, a 6-acre residential community consisting of 144 apartment units, located between South Winchester Boulevard and Third Street. 2. The project site is within the P-D (Planned Development) Zoning District and is designated with a High Density Residential land use designation by the General Plan. 3. The project site was developed under a planned development rezoning (PD 82-09) granted by the City Council in 1983, which also allowed for the adaptive reuse of the historic Campbell Union Grammar School building to professional office. 4. The proposed project is an application to modify the previously approved Planned Development Permit (PD 82-09) to allow construction of a 550 square-foot accessory structure. 5. The proposed project constitutes a "Major Modification" to the previously approved Planned Development Permit because it "proposes to add additional square footage or substantially alter the design or specifications approved by the site plan shall be reviewed by the planning commission and approved by the City Council" (CMC Sec. 21.12.030.H.3.b). 6. The proposed project, as conditioned, would be consistent with the following General Plan policies and strategies: - Strategy LUT-9.3d: Building Design: Design buildings to revitalize streets and public spaces by orienting the building to the street, including human scale details and massing that engages the pedestrian. Strategy LUT-9.3e: Building Materials: Encourage the use of long-lasting, high quality building materials on all buildings to ensure the long-term quality of the built environment. 7. In review of the proposed project, the City Council considered the site circulation, traffic congestion, and traffic safety effects of the project, including the effect of the site development plan on traffic conditions on abutting streets; the layout of the site with respect to locations and dimensions of vehicular and pedestrian entrances, exit City Council Resolution 12363 Page 2 of 3 Approving a Planned Development Modification PLN2018-213 — 23 Heritage Village Lane driveways, and walkways; the arrangement and adequacy of off-street parking facilities to prevent traffic congestion; the location, arrangement, and dimensions of-truck loading and unloading facilities; the circulation patterns within the boundaries of the development, and; the surfacing and lighting of the off-street parking facilities. 8. The City Council further considered the landscaping design of the proposed project, including the location, height, and material offences, walls, hedges, and screen plantings to ensure harmony with adjacent development or to conceal storage areas, utility installations, and other unsightly aspects of the development; the planting of groundcover or other surfacing to prevent dust and erosion, and the preservation of existing healthy trees. 9. The City Council further considered the proposed project's architectural and site layout, including the general silhouette and mass, including location on the site, elevations, and relation to natural plant coverage, all in relationship to the surrounding neighborhood; the exterior design in relation to adjoining structures in terms of area, bulk, height, openings, and breaks in the facade facing the street; and appropriateness and compatibility of the proposed uses in relation to the adjacent uses and the area as a whole. 10.No substantial evidence has been presented which shows that the project, as currently presented and subject to the required conditions of approval, will have a significant adverse impact on the environment. Based upon the foregoing findings of fact, the City Council further finds and concludes that: 1. The proposed development or uses clearly would result in a more desirable environment and use of land than would be possible under any other zoning district classification; 2. The proposed development would be compatible with the general plan and will aid in the harmonious development of the immediate area; 3. The proposed development would not be detrimental to the health, safety or welfare of the neighborhood or of the city as a whole. 4. The establishment will not create a nuisance due to litter, noise, traffic, vandalism or other factors; 5. The establishment will not significantly disturb the peace and enjoyment of the nearby residential neighborhood; and 6. This project is Categorically Exempt under Section 15303 (Class 3) of the California Environmental Quality Act (CEQA) Guidelines pertaining to the construction of accessory (appurtenant) structures. City Council Resolution 12363 Page 3 of 3 Approving a Planned Development Modification PLN2018-213 - 23 Heritage Village Lane THEREFORE, BE IT RESOLVED that the City Council approves a Major Modification (PLN2018-213) to a previously approved Planned Development Permit (PD 82-09) to allow construction of a 550 square-foot accessory structure within the Heritage Village Apartments on property located at 23 Heritage Village Lane, subject to the attached Conditions of Approval (attached Exhibit "A"). PASSED AND ADOPTED this 2nd day of October; 2018, by the following roll call vote: AYES: COUNCILMEMBERS: Gibbons, Landry, Cristina, Waterman, Resnikoff NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None ABSTAIN: COUNCILMEMBERS: None APPROVED: i' -� if- Paul Resnikoff, Mayor • ATTEST. 2LUIA Wend ood, City Clerk EXHIBIT A CONDITIONS OF APPROVAL Major Modification (PLN2018-213) Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item, under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division 1. Approved Project: Approval is granted for a Major Modification (PLN2018-213) to a previously approved Planned Development Permit (PD 82-09) to allow construction of a 550 square-foot accessory structure within the Heritage Village Apartments on property located at 23 Heritage Village Lane. The project shall substantially conform to the Revised Project Plans, stamped as received by the Planning Division on July 21, 2018, except as modified by the required revisions specified by Condition of Approval No. 7 (Plan Revisions). 2. Permit Expiration: The Major Modification approved herein ("Approval") shall be valid for one (1) year from the date of City Council approval (expiring October 2, 2018). . Within this one-year period, an application for building permit(s) must be submitted. Failure to meet this deadline or expiration of an issued building permit will result in the Approval being rendered void. Once established, this Approval shall be valid in perpetuity on the property, subjected to continued operation of the use. Abandonment, discontinuation, or ceasing of operations for a continuous period of twelve months shall void the Approval. 3. Previous Conditions of Approval: The conditions of approval contained herein shall be considered additional to those provided by PD 82-09. 4. Planning Final Required: Planning Division clearance is required prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall, not be approved without prior authorization of the Community Development Director. 5. Location of Mechanical Equipment: No roof-mounted mechanical equipment (i.e. air conditioning units, ventilation ducts or vents), shall be added to the existing buildings without providing screening of the mechanical equipment from public view and surrounding properties. The screening material and method shall be architecturally compatible with the building and requires review and approval by the Community Development Director and Building Division prior to installation of such screening. 6. On-Site Lighting: Exterior lighting shall be shielded away from adjacent residential units and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Exhibit A— Conditions of Approval Page 2 of 4 23 Heritage Village Lane PLN2018-213 — Major Modification Community Development Director for compliance with the Campbell Lighting Design Standards (CMC Sec. 21.18.090). 7. Plan Revisions: The construction plans submitted for a building permit shall incorporate the following revision(s): a. Window Treatment: Windows shall incorporate obscured frosting and/or blinds or curtains. b. Lighting: All interior lighting fixtures shall include a sensor or timer to ensure that lighting remains off during night-time hours. c. Plumbing Fixtures: Only plumbing fixture(s) necessary for one (1) mop-sink shall be allowed. d. No Parking Signs: "No parking" sign(s) shall be installed in front of the roll-door area to prevent unauthorized parking. 8. Operational Standards: The doors into the structure are required to be kept closed when not in use. Materials to be stored in the structure shall not be left unsecured overnight. Building Division 9. Construction Activities: The applicant shall abide by the following requirements during construction: a. The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. b. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. c. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. d. Unnecessary idling of internal combustion engines shall be strictly prohibited. e. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise- sensitive receptors such as existing residences and businesses. f. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. 10.Permits Required: A building permit application shall be required for the proposed structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such'work is part of the permit. Exhibit A— Conditions of Approval Page 3 of 4 23 Heritage Village Lane PLN2018-213 — Major Modification 11.Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 12.Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 13.Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path ,of travel to public sidewalks shall be detailed. 14.Title 24 Energy Compliance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building; 15.Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.0 Chapter 1, Section 106. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 16.Non-Point Source: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 17.Title 24 Accessibility— Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. 18.Title 24 Accessibility — New Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and public sidewalks. 19.Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District b. Santa Clara County Fire Department d. Santa Clara County Department of Environmental Health 20.P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in_the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval Exhibit A— Conditions of Approval Page 4 of 4 23 Heritage Village Lane PLN2018-213 — Major Modification process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. 21.Storm Water Requirements: Storm water run-off from impervious surface created by this permitted project shall be directed to vegetated areas on the project parcel. Storm water shall not drain onto neighboring parcels. PUBLIC WORKS DEPARTMENT , 22.Encroachment Permit / Fees / Deposits: Prior to issuance of any building permits, the applicant shall pay various fees and deposits, post security and provide insurance necessary to obtain an encroachment permit for construction of the standard public street improvements, as required by the City Engineer. The plans shall include the following, unless otherwise approved by the City Engineer: a. Upgrade the existing driveway approach on Winchester Boulevard closest to the new storage building (north driveway) to be Accessible (ADA) compliant. Reconstruct the existing driveway approach using City Standard Detail D-18 http:/Iwww.cityofcampbell.com/DocumentCenter/View/2317 23.Street Improvements Completed for Occupancy and Building Permit Final: Prior to allowing occupancy and/or final building permit signoff for any and/or all buildings, the applicant shall have the required street improvements and pavement restoration installed and accepted by the' City, and the design engineer shall submit as-built drawings to the City. . • •