Loading...
CC Resolution 12706RESOLUTION NO. 12706 BEING A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL APPROVING AN AMENDMENT TO THE PRUNEYARD MASTER USE PERMIT TO ALLOW (1) A REVISED PHASING PLAN TO ALLOW THE APPROVED OFFICE BUILDING AND A PARTIAL EXPANSION OF THE EXISTING PARKING STRUCTURE TO BE CONSTRUCTED AS PHASE 3 AHEAD OF THE APPROVED RETAIL BUILDINGS (AS NEW PHASE 4), FURTHER EXPANSION OF THE EXISTING PARKING STRUCTURE IN PHASE 4, AND A FOUR-YEAR EXTENSION OF THE PERMIT DEADLINE FOR NEW PHASE 4 FROM DECEMBER 2022 TO DECEMBER 2026, (2) MINOR ARCHITECTURAL CHANGES, A NOMINAL INCREASE IN BUILDING AREA, AND ELIMINATION OF THE UNDERGROUND PARKING TO THE APPROVED OFFICE BUILDING, AND ASSOCIATED SITE/PARKING LAYOUT CHANGES, (3) A REVISED DESIGN FOR THE PARKING STRUCTURE EXPANSION TO INCORPORATE ENHANCED ARCHITECTURAL TREATMENT AND ASSOCIATED SITE LAYOUT/CIRCULATION CHANGES AROUND THE TRAFFIC CIRCLE TO INCREASE PEDESTRIAN CONNECTIVITY, (4) A CHANGE TO THE LAND USE PROGRAM TO ALLOW MEDICAL SERVICE CLINICS AS A PERMITTED USE WITHIN THE OFFICE PARCEL, AND (5) REVISE THE PARKING MANAGEMENT PLAN TO ALLOW EXCLUSIVE USE OF APPROXIMATELY 60 PARKING STALLS FOR THE NEW OFFICE BUILDING TENANT(S) DURING TYPICAL OFFICE HOURS, (6) REQUIRE IMPLEMENTATION OF THE VALET PARKING PROGRAM ONLY AT THE COMPLETION OF PHASE 3 (WHICH IS NOT REQUIRED AT THE CURRENT PHASE) WHEN CERTAIN OCCUPANCY THRESHOLDS ARE MET, AND (7) VARIOUS NON -MATERIAL TEXT CLARIFICATIONS, FOR THE PRUNEYARD SHOPPING CENTER AND OFFICES LOCATED AT 1875, 1887, 1901, 1919, 1995, & 1999 S. BASCOM AVENUE AND 777 E. CAMPBELL AVENUE. FILE NO: PLN-2020-54 After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. The City Council finds as follows with regard to File No. PLN-2020-54 Environmental Finding 1. The City has a prepared an Addendum to the previously adopted Mitigated Negative Declaration, pursuant to CEQA Guidelines Sec. 15164. The Addendum establishes that the proposed MUP Amendment would not result in any new significant impacts not previously disclosed in the adopted Mitigated Negative Declaration nor would it result in a substantial increase in the magnitude of any previously identified significant environmental impacts such that the adopted Mitigated Negative Declaration would continue to provide a full and adequate environmental review required by CEQA. The addendum will not be circulated for public review but will be attached to the adopted Mitigated Negative Declaration and posted to the City's website as required by the CEQA Guidelines. City Council Resolution 12706 Page 2 Approval of a Master Use Permit Amendment Evidentiary Findings 1. The Project Site is The Pruneyard Shopping Center and Offices, a 27 acre multi -use property encompassing three professional office buildings, a hotel, a multi -building retail shopping center, and a multi -level parking garage. The property is bounded by Bascom and Campbell Avenues to the east and south, Highway 17 to the west, and the Pruneridge Plaza Apartments and the Campisi Way terminus to the north. 2. The Project Site is within the C-2-0 (General Commercial/Overlay) Combining Zoning District as depicted on the Campbell Zoning Map adopted pursuant to Campbell Municipal Code Section 21.040.030. 3. The Project Site is designated by the General Plan Land Use Diagram as General Commercial, which corresponds with the above referenced Zoning District designations. 4. On October 18, 2016, the City Council adopted Resolution Nos. 12068-12071 and introduced Ordinance Nos. 2212 and 2213, approving the Pruneyard Shopping Center and Offices Expansion Project ('Proposed Project") consists of the following components: • Zoning Map Amendment (PLN2015-357): To amend the Campbell Zoning Map to rezone a portion of The Pruneyard from the C-2 (General Commercial) Zoning District to the C-2-0 (General Commercial / Overlay) Combining Zoning District for a consistent zoning designation over the entire property. • Master Use Permit (PLN2015-358): To allow the construction of a 100,000 square -foot (5-story) office building, four retail buildings constituting 18,600 square -feet, a 30,000 square -foot fitness facility or a 12,000 square -foot retail/office building, expansion of the existing parking structure (3 or 5 stories), various site improvements, alterations to existing buildings, establishment of a new land use program including specifying permitted and conditional uses, continued allowance of a shared parking program, and implementation of a transportation demand management program (TDM). • Tentative Vesting Parcel Map (PLN2015-77): To allow division of the property into three parcels. • Tree Removal Permit (PLN2015-335): To allow removal of on -site "protected" trees. • Master Sign Plan with a Freeway Oriented Sign (PLN2015-78): To allow a new comprehensive signage scheme including a freeway -oriented sign, an increase in sign area, height, and number. • Zoning Text Amendment (PLN2015-76): To revise various sections of the Campbell Zoning Code (Title 21 of the Campbell Municipal Code) to reference the land use program created by the Master Use Permit and to allow the signage proposed by the Master Sign Plan. City Council Resolution 12706 Approval of a Master Use Permit Amendment Page 3 5. The Pruneyard Master Use Permit was adopted pursuant to Campbell Municipal Code (CIVIC) Section 21.14.030 ('0' overlay/combining zoning district), which requires adoption of a "Master Use Permit" to create, establish, erect, construct, enlarge, place, or install any building, structure, or use within a regional commercial center located within the 'O' overlay/combining zoning district. 6. The Pruneyard Shopping Center and Offices satisfies the definition of a "regional commercial center" specified by CIVIC Chapter 21.72 (Definitions). 7. The Pruneyard Master Use Permit was "established" upon issuance of a Building Permit Phase 1 (A/B) on January 17, 2017, pursuant to CIVIC Section 21.56.030.B.1, at which time the Master Use Permit became controlling upon The Pruneyard. 8. The Master Use Permit provided for a phasing plan as follows, with deadlines to obtain a Building Permit for each phase: • Phase 1/A (December 1, 2017): New paint on existing buildings in central plaza and seating areas, removal of arcade comers at select locations to improve visibility of retailers, entry improvements at Bascom Avenue, and a variety of other localized modification Phase 1/B (December 1, 2017) Major renovation of central plaza, relocation of palm trees, enhanced pedestrian and bicycle pathways, construction of a new retail building (R4), renovation of Palisade Builders "greenhouse" windows, and renovation of towers. • Phase 2 (December 1, 2022): Construction of new retail building (R5). • Phase 3 (December 31, 2026): Construction of new retail buildings (R1, R2, R3) and parking structure (G1) expansion, and creation of west plaza. Phase 4 (December31, 2026): Construction of new office building (01). 9. The Proposed Project is an Amendment to the Pruneyard Master Use Permit to allow for (1) a revised phasing plan to allow the approved office building and a partial expansion of the existing parking structure to be constructed as Phase 3 ahead of the approved retail buildings (as new Phase 4), further expansion of the existing parking structure in Phase 4, and a four-year extension of the permit deadline for new Phase 4 from December 2022 to December 2026, (2) minor architectural changes, a nominal increase in building area, and elimination of the underground parking to the approved office building, and associated site/parking layout changes, (3) a revised design for the parking structure expansion to incorporate enhanced architectural treatment and associated site layout/circulation changes around the traffic circle to increase pedestrian connectivity, (4) a change to the land use program to allow medical service clinics as a permitted use within the office parcel, and (5) revise the parking management plan to allow exclusive use of approximately 60 parking stalls for the new office building tenant(s) during typical office hours, (6) require implementation of the valet parking program only at the completion of Phase 3 (which is not required at the current phase) when certain occupancy thresholds are met, and (7) various non -material text clarifications. City Council Resolution 12706 Page 4 Approval of a Master Use Permit Amendment 10.As specified by Part I, Section D (Approved Phasing) and Section G (Amendments) of the Pruneyard Master Use Permit, a request for an extension to the approved phasing deadlines or to allow a building addition and/or alteration beyond the scope permitted by Part III, Section C (Architectural Modifications), a land use not specifically permitted by Part IV, Section D (Land Uses Allowed), or any other proposal that the Community Development Director determines to constitute a "major change" as defined by CMC Section 21.56.060.D.1, shall require an Amendment to the Master Use Permit. 11. Pursuant to CMC Section 21.14.030.C.3, upon application for an Amendment, the City Council, upon recommendation of the Planning Commission, shall approve, conditionally approve, or deny a request for an amendment by resolution with respect to the considerations provided in subsection D (Consideration in review of applications) and the findings for a Conditional Use Permit provided in Section 21.46.040 (Findings and decision) in compliance with procedures prescribed by Campbell Municipal Code Chapter 21.64 (Public Hearings): 12. Properties within the Overlay Combining Zoning District are not subject to the City's standard parking requirements due to the special conditions and situations; therefore, a Parking Modification Permit is not necessary. 13. Due to the economic uncertainty created by the COVID-19 pandemic, the amended Master Use Permit would allow the approved expansion of the parking structure to occur in two phases. The first expansion would occur with construction of the new office building in new Phase 3. The second expansion would occur with construction of the new retail buildings in new Phase 4. The applicant procured a supplemental parking analysis, which was peer -reviewed by the City's traffic consultant that documents that the proposed expansion would be generally sufficient to accommodate the demand generated by the new office building during Phase 3, except during the holiday period, which may require implementation of a valet parking program. As conditioned, the exact sizing of the second garage expansion in Phase 4 would be determined through review of an "Architectural Modification" to be reviewed by the SARC and Planning Commission for consideration of the final Phase 4 layout and parking configuration. 14.The approval duration of the Master Use Permit, as amended, is consistent with the Campbell Municipal Code that allows the City to establish expiration dates within a permit or project approval. 15.The Master Use Permit, as amended, remains consistent with the purpose and intent the General Commercial Land Use Designation. 16.The Master Use Permit, as amended remains consistent with General Plan goal, policies, and strategies for the Pruneyard/Creekside, listed below, by substantially improving the aesthetic character and pedestrian -orientation of The Pruneyard, strengthening the center's linkage to Downtown Campbell, enhancing the connection to the Los Gatos Creek Trail, activating the southwest corner adjacent to the new "portals" opening with the new office and retail buildings, taking advantage of development capacities within an appropriately designated part of the City, sharing City Council Resolution 12706 Page 5 roval of a Master Use Permit Amendment parking facilities amongst different uses, and maintaining consistency with the adopted land use maximums. Goal LUT-14: The Pruneyard/ Creekside Area as an active, connected "urban village" with a mixture of commercial, office, residential, entertainment and recreational uses functioning as a community and regional focal point. Policy LUT-14.2: Development Intensities: Allow higher development intensities within the Pruneyard / Creekside area. Strategy LUT-142a: Maximum Height: Allow new buildings and redeveloped buildings to develop at the maximum height in the Pruneyard/Creekside Area, subject to traffic and environmental constraints. Strategy LUT-14.2b: Floor Area Ratio (FAR): Allow a maximum FAR of 2.0 for new development or redevelopment within the Pruneyard/Creekside Area. Policy LUT-14.3: Physically Connected: Encourage new development in the Pruneyard/ Creekside Area that is physically connected to existing development and oriented towards the creek trail with appropriate setbacks, and that provides logical connections and access to the creek trail. Strategy LUT-14.3d: Links to Los Gatos Creek: Ensure that new development provides visual and pedestrian linkages with Los Gatos Creek. Strategy LUT-14.4a: Floor Area Ratio: Allow sites of greater than 3 acres to maximize densities of up to 2.0 FAR for non-residential uses and up to a maximum residential density of 27 units per gross acre. Project densities on parcels of smaller size will be reduced on a sliding scale as indicated below: Strategy LUT-14.4d: Policy LUT-14.5: Minimum Acres Maximum FAR Allowable Density Range Up to .99 .30 Up to 8 du/acre 1.0 to 1.99 .50 8 to 16 2.0 to 2.99 1.0 8 to 21 3.0 and above 2.0 8 to 27 Parking Facilities: Joint use of parking facilities may be utilized with mixed - use development formats on larger parcels. Building Orientation: Orient buildings toward public streets. New buildings on corner lots should frame the intersection through the use of reduced setbacks where necessary for access, facades that incorporate prominent entries, windows, design details and landscaping. Strategy LUT-14.5b: Non-residential Entries: Orient entries of non-residential developments toward the public street and provide street -level windows and glass front display bays for all street -level office and retail. Strategy LUT-14.5c: Parking Lots: Encourage parking lots at the side of or rear of, or below buildings. Parking lots are strongly discouraged between buildings and the sidewalk. Strategy LUT-14.6b: Ground Floor Retail Uses. Ensure ground floor retail uses on Bascom and Hamilton Avenues, with vibrant street level elevations. Strategy LUT-14.6c: Decorative Features: Development projects should incorporate decorative features including plazas that incorporate amenities such as public art, special paving, tile, and fountains. 17.The Master Use Permit, as amended is also remains consistent with the following General Plan strategies and policies with regards to the appropriate type, intensity, City Council Resolution 12706 Page 6 of a Master Use Permit Amendment and location of development, provision of transportation features and programs, suitable pedestrian and bicycle access and amenities, safe and efficient site layout, creative and high quality architectural design, pedestrian -oriented urban form, maintaining a balanced mix of uses, implementation of public improvements, and provision of a variety of uses within the community. Strategy LUT-1.5a: Transit -Oriented Development: Encourage transit -oriented development including employment centers such as office and research and development facilities and the city's highest density residential projects by coordinating the location, intensity, and mix of land uses with transportation resources, such as Light Rail. Strategy LUT-1.5d: Higher Floor Area Ratios (FARM: Develop provisions for allowing higher FARs in new projects that provide a mix of uses, maintain a jobs/housing balance or are located within proximity to Light Rail. Strategy LUT-2.1c: Bicycle Facilities: Require adequate and secure bicycle facilities at employment centers, activity centers, and residential projects. Strategy LUT-2.1k: Private Development: Developers will be required to make public improvements related to their project to improve and enhance bicycle, pedestrian and transit opportunities consistent with City policy. Strategy LUT-2.1q: Transportation Demand Management (TDM): For new employment centers require TDM site design measures including carpool and van pool parking, bicycle storage, and discounted public transit programs. Strategy LUT-2.3a: Intersection Level of Service: To the extent possible, maintain level of service (LOS) on designated intersections consistent with the Santa Clara County Congestion Management Plan. Policy LUT-2.4: Jobs and Housing Balance: Maintain Campbell's balance of jobs and housing units to encourage residents to work in Campbell, and to limit the impact on the regional transportation system. Strategy LUT-2.4a: Full Range of Land Uses: Provide for a full range of land uses within the City, and for mixed -uses within specific development projects Policy LUT-5.3: Variety of Commercial and Office Uses: Maintain a variety of attractive and convenient commercial and office uses that provide needed goods, services and entertainment Strategy LUT-5.3b: Minimal Setbacks: Design commercial and office buildings city-wide to have minimal setbacks from the sidewalk except to allow for pedestrian oriented features such as plazas, recessed entryways, and wider sidewalks for outdoor cafes. Discourage parking areas between the public right -of way and the front fagade of the building. Strategy LUT-5.3c: Revitalization of Shopping Centers: Encourage the maintenance and revitalization of commercial shopping centers. Strategy LUT-5.3d: Commercial Centers: Review the design, use and upgrading of commercial centers via the discretionary permit process, and ensure that conditions of approval are adopted that require businesses to be well kept and operated in a way that limit impacts to adjacent uses. Strategy LUT-7.2n: Consistency with Plans: Ensure that new development and substantial remodeling projects are consistent with Specific Plans, Area Plans, City Standard Details and adopted Streetscape Standards to create cohesive design. Strategy LUT-9.1c: Land Use Objectives and Redevelopment Plans: Permit only those uses that are compatible with land use objectives and redevelopment plans. City Council Resolution 12706 Approval of a Master Use Permit Amendment Page 7 Policy LUT-9.3: Design and Planning Compatibility: Promote high quality, creative design and site planning that is compatible with surrounding development, public spaces and natural resources. Strategy LUT-9.3d: Building Design: Design buildings to revitalize streets and public spaces by orienting the building to the street, including human scale details and massing that engages the pedestrian. Strategy LUT-9.3e: Buildinq Materials: Encourage the use of long-lasting, high quality building materials on all buildings to ensure the long-term quality of the built environment. Strategy LUT-9.3f: Development Orientation: Orient new development toward public and private amenities or open space, in particular: [Orient high activity areas such as outdoor dining areas and plazas, and major pedestrian routes toward the amenity or open space]. Strategy LUT-9.3g: Pedestrian Amenities: Incorporate pedestrian amenities such as plazas, landscaped areas with seating, pedestrian walkways into new developments. Strategy LUT-9.3i: Master Plan of Phased Sites. Ensure developers of phased multi -building complexes provide a master plan demonstrating how the entire site will be developed. Strategy LUT-10.2a: Streetscape Standards: Implement Streetscape Standards with landscaped boulevard treatment on arterial streets, and implement the installation of street trees per the Standard Street Improvements. Strategy LUT-11.1d: Bicycle and Pedestrian Connections in Development: Encourage new or redeveloping projects to provide logical bicycle and pedestrian connections on site, between parking areas, buildings, and street sidewalks and to existing or planned public right-of-way facilities and encourage pedestrian passages between street -front sidewalks and rear -lot parking areas. Ensure that the bicycle and pedestrian connections interface safely. Policy LUT-11.2: Services Within Walking Distance: Encourage neighborhood services within walking distance of residential uses. Strategy LUT-12.1c: Parking Lot Design: Design parking lots to minimize impacts on the street system by providing adequate sized driveways, sufficient queuing and efficient circulation. Strategy LUT-13.1: Variety of Uses: Attract and maintain a variety of uses that create an economic balance within the City while maintaining a balance with other community land use needs, such as housing and open space, and while providing high quality services to the community. Strategy LUT-13.1c: Fiscal Effects of Land Use: Evaluate the fiscal effects of different land uses on City revenues and services. 18.The City Council has considered traffic safety, traffic congestion, and site circulation, including the effect of the site development plan on traffic conditions on abutting streets, the layout of the site with respect to locations and dimensions of vehicular and pedestrian entrances, exit driveways and walkways, the arrangement and adequacy of off-street parking facilities to prevent traffic congestion, the location, arrangement and dimensions of truck loading and unloading facilities, the circulation patterns within the boundaries of the development; and the surfacing and lighting of off-street parking facilities. 19.The City Council has also considered landscaping improvements, including the location, height and material of walls, fences, hedges, and screen plantings to insure City Council Resolution 12706 Approval of a Master Use Permit Amendment harmony with adjacent development or to conceal storage areas, utility installations or other unsightly development, the planting of ground cover or other surfacing to prevent dust and erosion; and the unnecessary destruction of existing healthy trees. 20.The City Council has also considered the building and site layout, including the general silhouette and mass of buildings, including location on the site, elevations and relation to natural plant coverage, all in relationship to the neighborhood, the exterior design of buildings in relation to adjoining structures in height, bulk, and area openings, breaks in the facade facing on the street, line and pitch of roof, and arrangement of structures on the parcel, and special conditions and situations concerning the property and the adjoining properties. Based upon the foregoing findings of fact, the City Council further finds and concludes that: 1. The uses (permitted and conditional) allowed by the Master Use Permit, as amended, are allowed within the C-2 General Commercial Zoning District, and comply with all other applicable provisions of this Zoning Code and the Campbell Municipal Code; 2. The Master Use Permit, as amended is consistent with the General Plan; 3. The Project Site is adequate in terms of size and shape to accommodate the fences and walls, landscaping, parking and loading facilities, yards, and other development features required in order to integrate the use with uses in the surrounding area; 4. The Project Site is adequately served by streets of sufficient capacity to carry the kind and quantity of traffic the use would be expected to generate; 5. The design, location, size, and operating characteristics of the development approved by the Master Use Permit, as amended, are compatible with the existing and future land uses on -site and in the vicinity of the subject property; 6. The establishment, maintenance, or operation of the Master Use Permit, as amended, on the Project Site will not be detrimental to the comfort, health, morals, peace, safety, or general welfare of persons residing or working in the neighborhood of the proposed use, or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the city; 7. The Master Use Permit, as amended, will aid in the harmonious development of the immediate area; 8. The Master Use Permit, as amended, is consistent with applicable adopted design guidelines; 9. The Master Use Permit, as amended, will not result in an over concentration of liquor establishments uses in the surrounding area; 10.The Master Use Permit, as amended, will not create a nuisance due to litter, noise, traffic, vandalism, or other factors; City Council Resolution 12706 Page 9 Approval of a Master Use Permit Amendment 11.The Master Use Permit, as amended, will not significantly disturb the peace and enjoyment of the nearby residential neighborhood; and 12.The Master Use Permit, as amended, will not significantly increase the demand on city services. 13.There is a reasonable relationship and a rough proportionality between the Conditions of Approval and the impacts of the project. 14.There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 15. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required conditions of approval, will have a significant adverse impact on the environment. THEREFORE, BE IT RESOLVED that the City Council approves an Amendment to the Pruneyard Master Use Permit, included in attached EXHIBIT B, to allow for (1) a revised phasing plan to allow the approved office building and a partial expansion of the existing parking structure to be constructed as Phase 3 ahead of the approved retail buildings (as new Phase 4), further expansion of the existing parking structure in Phase 4, and a four-year extension of the permit deadline for new Phase 4 from December 2022 to December 2026, (2) minor architectural changes, a nominal increase in building area, and elimination of the underground parking to the approved office building, and associated site/parking layout changes, (3) a revised design for the parking structure expansion to incorporate enhanced architectural treatment and associated site layout/circulation changes around the traffic circle to increase pedestrian connectivity, (4) a change to the land use program to allow medical service clinics as a permitted use within the office parcel, and (5) revise the parking management plan to allow exclusive use of approximately 60 parking stalls for the new office building tenant(s) during typical office hours, (6) require implementation of the valet parking program only at the completion of Phase 3 (which is not required at the current phase) when certain occupancy thresholds are met, and (7) various non -material text clarifications, for The Pruneyard Shopping Center and Offices, located at 1875, 1887, 1901, 1919, 1995, & 1999 S. Bascom Avenue and 777 E. Campbell Avenue, subject to the attached Conditions of Approval (attached Exhibit A). PASSED AND ADOPTED this 4th day of May, 2021, by the following roll call vote: AYES: COUNCILMEMBERS: Bybee, Landry, Lopez, Resnikoff, Gibbons NOES: COUNCILMEMBERS: None ABSTAINED: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None APPROVE . le" -A eth "Liz" Gibbons, Mayor ATTEST: Q Andrea SaDders, Deputy City Clerk EXHIBIT A CONDITIONS OF APPROVAL Master Use Permit Amendment Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT 1. Approval of Master Use Permit: Approval is granted for an Amendment to the Pruneyard Master Use Permit to allow (1) a revised phasing plan to allow the approved office building and a partial expansion of the existing parking structure to be constructed as Phase 3 ahead of the approved retail buildings (as new Phase 4), further expansion of the existing parking structure in Phase 4, and a four-year extension of the permit deadline for new Phase 4 from December 2022 to December 2026, (2) minor architectural changes, a nominal increase in building area, and elimination of the underground parking to the approved office building, and associated site/parking layout changes, (3) a revised design for the parking structure expansion to incorporate enhanced architectural treatment and associated site layout/circulation changes around the traffic circle to increase pedestrian connectivity, (4) a change to the land use program to allow medical service clinics as a permitted use within the office parcel, and (5) revise the parking management plan to allow exclusive use of approximately 60 parking stalls for the new office building tenant(s) during typical office hours, (6) require implementation of the valet parking program only at the completion of Phase 3 (which is not required at the current phase) when certain occupancy thresholds are met, and (7) various non -material text clarifications, for The Pruneyard Shopping Center and Offices located at 1875, 1887, 1901, 1919, 1995, & 1999 S. Bascom Avenue and 777 E. Campbell Avenue. 2. Approved Development Plans: The amended Master Use Permit incorporates by reference, and inclusion as Appendix A, those original Development Plans dated as received by the City of Campbell Planning Division on April 29, 2016, consisting of architectural and landscape drawings prepared by Lowney Architecture and civil drawings prepared by HMH ("Approved Development Plans"). The Approved Development Plans are amended by the 'Revised Development Plans" dated as received by the City of Campbell Planning Division on October 27, 2020, consisting of architectural and landscape drawings prepared by KSH Architects and civil drawings prepared by HMH, which are also incorporated by reference and inclusion as Appendix A-1 of the amended Master Use Permit. 3. Approval Effectiveness: Having being "established" upon issuance of a Building Permit for Phase 1 (A/B) in compliance with Campbell Municipal Code Section 21.56.030.B.1 (Issuance of Building Permit), the Amendment to the Master Use Permit shall be in effect immediately upon City Council action to approve this Resolution. Conditions of Approval Pruneyard Master Use Permit Amendment Page 2 4. Previous Conditions of Approval: Upon approval of this Resolution, the previously approved Conditions of Approval provided in City Council Resolution No. 12068 (Approving a Master Use Permit) shall be permanently superseded in their entirety by the Conditions of Approval specified herein, except as incorporated by reference by Condition of Approval No. 12. 5. Approval Duration/Phasing: Approved development may only occur in according to the pre -approved phasing and duration periods as specified by the Part I, Section D (Approved Phasing) of the amended Master Use Permit. Further extensions or revisions to the approval/phasing periods shall be processed as an Amendment. 6. Phase 4: The final build -out of new Phase 4, including the design and stall count of the second expansion of the parking structure ('G1') and related site work, is subject to additional City review and approval. Prior to issuance of Building Permits, the Owner shall submit architectural and site improvement drawings for all Phase 4 related work, including an associated shared parking analysis and proposed valet parking plan. These materials shall be reviewed as an Architectural Modification pursuant to Part III, Section C (Architectural Modification) of the amended Master Use Permit, which the Community Development Director shall forward to the Planning Commission for consideration and decision. 7. Caltrans Right -of -Way Improvements: The property owner shall continue to make a good faith effort to secure an agreement to construct a public plaza, consistent with the Approved Development Plans, within the Caltrans right-of-way located adjacent to the southwest corner of The Pruneyard property, construction of which shall only be required as part of Phase 3 of the project. 8. Mitigation Measures: Development approved by the amended Master Use Permit is subject to all applicable Mitigation Measures identified in the adopted Mitigated Negative Declaration, as approved by City Council Resolution No. 12067, which are herein incorporated by reference. 9. Master Sign Plan: As approved by City Council Resolution No. 12070, the "final" Master Sign Plan is incorporated by reference into the amended Pruneyard Master Use Permit by inclusion as Appendix B. Review and approval of signs shall be in compliance with the provisions of the amended Master Use Permit. 10. Administrative Procedures: Decisions on Architectural Modifications and Conditional Use Authorizations shall be made in compliance with the procedures prescribed by Campbell Municipal Code Chapter 21.71 (Administrative Decision Process). 11. Public Art: The project shall incorporate public art installations within office building plaza as referenced by Condition of Approval No. 7, above. The design of the public art installation within the office building plaza shall be reviewed by the Campbell Civic Improvement Commission. Conditions of Approval Pruneyard Master Use Permit Amendment PUBLIC WORKS DEPARTMENT Page 3 12. Prior to issuance of any Grading or Building Permits for the site, the applicant is required to complete the Conditions of Approval for the Master Use Permit for The Pruneyard project approved by the City Council October 18, 2016 (PLN2015-76, 77, 78, 79), with the understanding that the New Office Building and Parking Garage expansion shall satisfy all conditions of approval originally required of Phase 3, and the future Retail expansion will berequired to satisfy all Phase 4 and any outstanding requirements. Specifically: a. Originally approved Condition No. 27 (Street Improvements) shall now refer to Phase 3 and include an additional requirement that the project shall restore the pavement along the East Campbell Avenue frontage to the satisfaction of the City Engineer. b. Originally approved Condition No. 28(c) (New Traffic Signal Contribution) shall now refer to Phase 3. c. Originally approved Condition No. 28(d) (Corridor Signal Timing Study) shall nowrefer to Phase 4. 13. The public sidewalk along the East Campbell Avenue frontage shall be standard City sidewalk and not the contrasting colored concrete proposed to match the plaza area. The ground cover proposed for the park strip will be evaluated at the street improvement plan stage. The proposed design for the curb ramps at the driveway opposite Union Avenue willbe refined at the street improvement plan stage. 14. Any Public Service or Traffic Signal easements necessary to implement the Phase 3 frontage improvements along East Campbell Avenue shall be provided prior to occupancy of the Office Building. 15. The right-of-way dedication shown on the Tentative Map is no longer required based on thecurrent design of the street improvements. FIRE DEPARTMENT 16. Plans for new Phase 3 are approved with the conditions provided in the DRC Comment Sheet, dated November 23, 2020. Plans for new Phase 4 have not been reviewed and a full submittal will be required at the time of its development. EXHIBIT B PLACEHOLDER Amended