Loading...
CC Resolution 12913 - Fiscal Year 21/22 Annual Street Maintenance - Project 22-BBRESOLUTION NO. 12913 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL ACCEPTING IMPROVEMENTS FOR THE FISCAL YEAR 21/22 ANNUAL STREET MAINTENANCE — COLLECTOR AND RESIDENTIAL STREET RESURFACING, PROJECT 22-BB, DIRECTING THE CITY ENGINEER TO FILE THE NOTICE OF COMPLETION, AUTHORIZING THE FINANCE DIRECTOR TO PERFORM A BUDGET ADJUSTMENT WHEREAS, on February 1, 2022, City Council adopted Resolution No. 12799 authorizing the advertisement of bids, awarding the contract, and signing of a construction contract for the Project; and WHEREAS, on March 17, 2022, a construction contract in the amount of $2,441,656.08 was awarded to G. Bortolotto & Company, Inc., of San Carlos, California; and WHEREAS, in September of 2022, G. Bortolotto & Company, Inc. completed the installation of various improvements in accordance with the Project plans and specifications for the Project 22-BB; and WHEREAS, due to labor compliance issues involving three subcontractors, the Notice of Withholding of Contract Payments was sent on October 12, 2022, in accordance with Labor Code sections 1742 and 1771.6 to the prime contractor and all impacted subcontractors advising that an estimated maximum wage restitutions to workers (from the subcontractors) and penalties due to the City equal to $5,070.50 will be held back when the retention is released; and WHEREAS, approximately $938,213 of pavement maintenance funds remains unspent in the Project budget; and WHEREAS, staff recommends the fund transfer of the Project balance to the Annual Street Maintenance — FY23 (Hamilton Avenue), Project 23-BB for resurfacing the corridor from western to eastern city limits; and WHEREAS, a budget adjustment has been prepared to transfer the remaining Project budget to the Annual Street Maintenance — Hamilton Avenue Street Resurfacing, Project 23-BB. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Campbell hereby accepts the improvements constructed by G. Bortolotto & Company, Inc. for the Fiscal Year 21/22 Annual Street Maintenance — Collector and Residential Street Resurfacing, Project 22-BB, directs the City Engineer to file the Notice of Completion, and authorizes the Finance Director to perform a budget adjustment. PASSED AND ADOPTED this 6t" of December 2022, by the following roll call vote: AYES: Councilmembers: Gibbons, Lopez, Landry, Bybee, Resnikoff NOES: Councilmembers: None ABSENT: Councilmembers: None APPROVED: Paul Resnikoff, Mayor ATTEST: AQer , "�e}D Andrea San rs, City Clerk Recording Requested by and when recorded, mail to: City of Campbell City Clerk's Office 70 North First Street, City Hall — Upper Level Campbell, CA 95008 (408)866-2150 ��t r q y CITY OF CAMPBELL NOTICE OF COMPLETION AND ACCEPTANCE OF PUBLIC WORKS CONTRACT (C.C.C.3093) li A A"" This document is for the benefit of the City of Campbell. Request for the Recordation without fee is made in accordance with Section 6103 of the Government Code of the State of California. Contractor's Name: G. Bortolotto & Company, Inc. Contract Date:4/1 1/2022 Surety: Everest Reinsurance Company Final Contract Amount: $2,526,109.01 Job Title: FY 21 /22 Annual Street Maintenance — Collector and Residential Street Resurfacing, Project 22-BB Location: Various collector and residential streets in the City of Campbell, California. Scope of Work: Included the following: Resurfacing of various street segments as follows, overlayed of 0.96 centerline miles of residential streets with hot mix asphalt concrete; installed either a rubber cape seal or slurry seal over 3.9 centerline miles of collector and residential streets; crack sealed 40 segments of residential streets; applied preventive maintenance treatments (including digouts and crack sealing) on 1.1 centerline miles of S. Bascom Avenue; repaired high severity pavement failure areas at various locations along Hamilton Avenue; and installed other incidental work such as ADA curb ramps. Owner: City of Campbell, City Hall, 70 North Street, Upper Level, Campbell, CA 95008 This work was accepted by me on 9/14/2022, on behalf of the City of Campbell. I certify under penalty of perjury that the foregoing is true and correct. (C.C.P. 2015.5) Executed on at Campbell, California Amy Olay, City Engineer Department of Public Works City of Campbell Revised 1/23/17 City of Campbell Request for Budget Adjustments Department/Program___ Division Date Request No. Public Works 22-BB Annual Street Maintenance December 6, 2022 BA-12 Budget to be Reduced un rogram ccount Number er escripion Amount EXPENDITURES 435.22BB 7883 Annual Street Maintenance (159,041) 435.22BB 7883 Transfer to 23-BB (938,218) REVENUES 435.535 4921 Utility Reimbursement (64,471) 435.535 4921 Los Gatos Cost Share (133,150) Budget to be Increased Fund/Program Account Number Description Amount EXPENDITURES 204.990 9999 Capital Transfer Out 38,580 435.23BB 7883 Transfer from 22-BB 938,218 REVENUES 204.760 4518 SB1 Revenue 38,580 435.990 6999 Capital Transfer In 38,580 REASON FOR REQUEST - BE SPECIFIC: To amend the overall budget of 22-BB: 1. To reflect a decrease in project budget by $159,041 as a result of an increase to SB1 revenue and a decrease in cost share and utility reimbursement. 2. To transfer remaining project balance of $938,218 from 22-BB to 23-BB Will Fuentes Todd Ca urso Brian Loventhal Finance Director Puba-works Director City Manager