CC Resolution 12999 - Approval of (PS&E) for Measure O - Library Project (No. 23-SS)RESOLUTION NO. 12999 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL APPROVING THE PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND AUTHORIZING THE PUBLIC WORKS DIRECTOR TO SOLICIT BID PROPOSALS FROM THE LIST OF PRE -QUALIFIED CONTRACTORS, FOR THE MEASURE O — LIBRARY RENOVATIONS PROJECT (NO. 23-SS) WHEREAS, the Campbell Library (Library) is a City facility that has been operated by the Santa Clara County Library District (SCCLD) for over 40 years — through a lease agreement — as part of the County's public library system; and WHEREAS, over time, frequent mechanical failures, outdated building components and structural deficiencies were becoming increasingly more costly and impacting SCCLD's ability to operate current and future library programs; and WHEREAS, in November 2018, Campbell voters passed Measure O authorizing the City to issue $50,000,000 in general obligation (GO) bonds to finance the design and construction of a new Police Operations Building (with a new EOC) and renovations to the Campbell Library; and WHEREAS, a total of $20.5M in Measure O funds has been allocated for the Library Renovations project (No.-23-SS); and WHEREAS, on May 19, 2020, Jayson Architecture was awarded the Library's design consultant services contract and was followed by the City Council's approval of the project's schematic design on April 6, 2021; and WHEREAS, in early 2022, after evaluating the applications received in response to the Request for Qualifications (RFQ) advertised for construction services, staff deemed the following contractors qualified for invitation to bid on the Library's construction contract upon the City Council's approval of the final plans, specifications, and estimates (PS&E).. 1. Gonsalves & Stronck Construction Company, Inc., 2. BHM Construction, 3. Lathrop Construction Associates, Inc., and 4. BOBO Construction, Inc., and WHEREAS, between 2018 .and 2023, the Library project also received additional funding from the Santa Clara County Library District ($510k); California State Library Building Forward Grant Program ($4.7M); and Silicon Valley Clean Energy (SVCE) ($500k); and WHEREAS, these additional funds created capacity within the Library's existing budget to address infrastructure improvements that were included in the project's original scope of work but were later omitted due to budgetary constraints; and WHEREAS, in January 2023, the City Council approved authorization to amend the existing consultant services agreement with Jayson Architecture for additional design and engineering services to incorporate (re -design) these elements back into the project's scope of work; and WHEREAS, upon completion of the re -design work in March 2023, Griffin Structures performed a constructability review and granted their subsequent approval of the project's final plans; and WHEREAS, during the April 4, 2023, Measure O study session, the Library's design details were discussed by the City Council — with comments forwarded to Jayson Architecture for consideration during their preparations of the project's final PS&E; and WHEREAS, as a result, the project's updated engineer's estimate includes both the base scope of work and the three add alternates, with a 10% change order construction contingency, all identified as separate expenditures for a total estimated project cost of $24,386,580; and WHEREAS, based on this total estimate, and the Library's current budget of $26,228,450, the project is projected to have a surplus of approximately $1.84M in Measure O funds; and WHEREAS, sufficient funding is available to proceed with the Library Renovations project in the City's approved CIP budget for 'Civic Center Improvements — Library Renovations (Project No. 23-SS); and WHEREAS, staff is recommending City Council approval of the Library's final PS&E and authorization to invite the project's list of prequalified contractors to bid on its construction contract. NOW, THEREFORE, BE IT RESOLVED that the City of Campbell hereby approves the the final plans, specifications, and estimate (PS&E) for the Campbell Library Renovations Project (No. 23-SS), authorizing the Public Works Director to solicit bid proposals from the project's list of pre -qualified general contractors; and staff to later return to Council to present the bid results and request approval to award the project's construction contract at that time. PASSED AND ADOPTED this 6th day of June 2023, by the following roll call vote: AYES: Councilmembers: Lopez, Scozzola, Furtado, Landry, Bybee NOES: Councilmembers: None ABSENT: Councilmembers: None APPROVED: a�� JA/___1_ Anne Bybee, Mayor ATTEST: Andrea San s, City Clerk