Loading...
87-139 ENGEOTECH, INC. Soil and Geological Engineers 473 Sapena Court, Unit 15 · Santa Clara, CA 95054 . (408) 988-8225 December 23, 1987 Norman B. Houge, Inc. 200 Cr1stich Lane Campbell, California 95008 Attention: Mr. Gilbert Ruiz Subject: Street Repair Smith Avenue Campbell, California TESTING AND INSPECTION DURING STREET REPAIR Gentlemen: Per your request, our firm performed testing and inspection during Street Repair of Smith Avenue near San Tomas Aquino Road in Campbell, California. The existing asphalt and rock was dug out and hauled away from the srea. The subgrade in the area was prepared according to the plans and compacted. The results of the field density tests indicated that the subgrade wasoompacted to 95.3 to 97.2% relative compaction. The A.C. was placed and compacted with a roller. The results of the tests showed that the A.C. was compacted to 97.2 to 98.4% relative compaction. If you have any question, please give us a call. yours truly, ENGEOTECH, I NC. ~~~~ Muhammad Hussain, P.E.