Loading...
90 S. First St. CI1Y OF CAMPBELL, CI1Y ENGINEER'S CONS1RUCTION ESTIMA 1E PERMIT NO. Address Hyde Park Expansion By C. Gomez ~..~ Date 12/6/94 Approved: R. Har~nT AI bh Ill"A A. -' Surface Construction v Mobilization 1 Lump Sum Estimate = $2,500.00 Construction Traffic Control!Phasing 1 Lump Sum Estimate = $2,000.00 Construction Staking Lump Sum Estimate = Clearing & Grubbing Lump Sum Estimate = Sawcut Concrete 300 LF @ $4.50 = $1,350.00 Roadway Concrete Removal 2285 SF @ $3.50 = $7,997.50 4" Parking Asphalt Concrete Removal 6815 SF @ $2.00 = $13,630.00 Curb & Gutter Removal 130 LF @ $5.50 = $715.00 Relocate Street Parking Lot Lights 1 EA @ $1,000.00 = $1,000.00 Curb & Gutter, Type A2 280 LF @ $16.00 = $4,480.00 Type Bl Curb 120 LF @ $12.00 = $1,440.00 Sidewalk 1045 SF @ $4.50 = $4,702.50 Driveway Approach, Comm. SF @ $6.00 = Handicap Ramp 2 EA@ $475.00 = $950.00 Extruded Curb, Type Al- B3 EA@ $10.00 = Parking Lot Excavation (145)(47)(8") 169 CY @ $15.00 = $2,535.00 New AC Pavement (2550SF)(12") 198 EA $35.00 = $6,930.00 Adjust Manhole to Grade EA @ $425.00 = Adjust Handhole to Grade 1 EA @ $325.00 = $325.00 Signing, Striping, Markings, Markers 1 Lump Sum Estimate = $1,000.00 Irrigation, Planting Work Lump Sum Estimate = Top Soil Backfill(145)( 47)(12") 252 CY @ $20.00 = $5,040.00 Pavement Key Cut 75 LF @ $10.00 = $750.00 Demolish 4"X7"-6"XI6" Precast Wall, Piers 120 fLF @ L.S. = $3,500.00 Demolish 8"XI8"X40" PCC Retaining Wall W/5' CL Fence 130 LF @ L.S. = $5,000.00 Storm Drainage 12" or 15" RCP 200 LF@ $35.00 = $7,000.00 Street Inlet 2 EA@ $1750.00 = $3,500.00 Break & Enter ManholelInlet 1 EA @ $750.00 = $750.00 Demolish Existing Inlet Plug RCPs 2 EA @ $750.00 = $1,500.00 TOTAL ESTIMATE $78,595.00 USE FOR BOND $75,000.00 :~ .Per Planning - cost does not include: planting, sod, irrigation, onsite lighting, etc. h:HydeParkExpansion( mp) T