Loading...
PC Res 3367RESOLUTION NO. 3367 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL GRANTING THREE SITE AND ARCHITECTURAL APPROVALS (PLN2001-20/21/22) TO ALLOW AN THE CONSTRUCTION OF THREE NEW SINGLE-FAMILY RESIDENCES ON PROPERTY LOCATED AT 1555, 1561 AND 1573 VAN DUSEN LANE IN AN R-l-9 (SINGLE FAMILY RESIDENTIAL) ZONING DISTRICT. APPLICATION OF MR. MICHAEL COSTA. FILE NOS. PLN2001-20/21/22. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application PLN2001-20/21/22: 1. The proposed project is consistent with the R-l-9 (Single-family Residential, 9,000 square foot minimum lot size) zoning district. 2. The proposed project is consistent with the San Tomas Area Neighborhood Plan and complies with the San Tomas Area Neighborhood Plan design guidelines. 3. The development project consists of three new single-family residences on parcels that received approval through a Tentative Subdivision Map in June 1999. The proposed residences each have a distinctive design and well-articulated features. The three elevations incorporate representative architectural features of the San Tomas Area Neighborhood. Although two of the floor plans are very similar and one is a mirror image of this floor plan, the exterior elevations have varied rooflines, front entry treatments, window styles, and exterior materials and colors. o The proposed residences are consistent with the zoning designation and meet the minimum setbacks, height restriction of 28 feet, maximum lot coverage of 35 percent, maximum floor area ratio of .45, and parking requirements of the R-l-9 Zoning District. 6. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood and the San Tomas Area Neighborhood. 7. The density of the proposed project site is three units per gross acre, which is consistent with the General Plan land use designation. o The project is not located in a particularly sensitive environment; and no substantial evidence has been presented to suggest that there is a reasonably possibility that significant environmental impacts would result from the project due to unusual circumstances or from the cumulative impacts of successive projects of the same type in the same place. Planning Commission Resolution No. 3367 PLN2001-20/21/22 - 1555, 1561 & 1573 Van Dusen Lane- Site & Architectural Approvals Page 2 Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The proposed development and uses clearly will result in a more desirable environment and use of the land than would be possible under any other zoning classification. 2. The development and uses will be compatible with the General Plan of the City and will aid in the harmonious development of the immediate area. 3. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 4. There is a reasonable relationship and a rough proportionality between the Conditions of Approval and the impacts of the project. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division 1. Approved Project: Approval is granted for a Site and Architectural Review Permit to allow the construction of three new one-story, single-family residences at 1555, 1561 & 1573 Van Dusen Avenue. The building designs and site design shall substantially conform to the project exhibits listed below, except as may be modified by the Conditions of Approval herein: a. Set of plans prepared by Kirk Miller Affiliates received on July 2, 2001, including colored building elevations and a site plan. b. Paint and roofing samples submitted by Kirk Miller Affiliates on June 4, 2001. Architectural Details: Prior to issuance of building permits, the applicant shall provide: a. Details of the building materials including a window and door schedule. b. Details of the stamped concrete to be used in the front yard patio and walkway and interior courtyard. o Site and Architectural Review Permits Approval Expiration: Within one year from the date of approval, a building permit must be obtained and construction completed one year thereafter or the Site and Architectural Review Permit approvals shall be void. Fences: Any newly proposed fencing shall comply with Section 21.59.090 of the Campbell Municipal Code. A fencing plan depicting fencing type and height shall be submitted, prior to the issuance of building permits. Planning Commission Resolution No. 3367 PLN2001-20/21/22 - 1555, 1561 & 1573 Van Dusen Lane- Site & Architectural Approvals Page 3 o Property Maintenance: The property is to be maintained free of any combustible trash, debris and weeds until the time that actual construction commences. Any remaining debris from the demolition of structures shall be removed from the property. 6. Parking and Driveways: All parking and driveway areas shall be developed in compliance with the standards in Chapter 21.50 of the Campbell Municipal Code. Oak Preservation Requirements: A certified arborist shall be retained to develop Tree Protection Specifications to be utilized during construction, prior to the issuance of building permits for the project. The consulting arborist shall be on-site to supervise any excavation or construction within a 35-foot radius of the trunk of the coast live oak tree. All underground utility/drainage lines shall be located outside the 35-foot radius of the trunk of the oak tree, unless otherwise approved by the consulting arborist. Landscaping within the 35-foot radius dripline area shall consist of the tree's natural leaf litter mulch and no other plantings (e.g. turf, shrubs, etc.) or irrigation. The oak shall be not be pruned without approval of the consulting arborist. ° Landscaping: The applicant shall submit four sets of detailed landscape and irrigation plans to the Planning Division, prior to the issuance of building permits, for review and approval by the Community Development Director for compliance with all applicable conditions of approval, ordinances, laws and regulations. The plans must meet the following requirements: a. Landscape and irrigation plans shall be consistent with the City's Water Efficient Landscaping Standards (WELS). b. Each lot shall have a total of six (6) trees within the net lot area of the subject property. Existing trees in good health shall count towards this requirement. The size and species shall be noted on the plans and shall be located to minimize privacy impacts on adjacent properties. c. In addition to the six trees required at 1573 Van Dusen Lane, four (4) 36-inch box trees shall be required as a replacement for the 30-inch diameter Blue Atlas Cedar tree that was removed without a Tree Removal Permit. Park Impact Fee: Prior to issuance of a certificate of building occupancy, the applicant shall pay a park impact fee of $2,747.50 per unit. This fee is in addition to the Park In-Lieu Fee that is required at the time of Final Subdivision. Building Division 10. Permits Required: A building permit application shall be required for each proposed new structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 11. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. Planning Commission Resolution No. 3367 PLN2001-20/21/22 - 1555, 1561 & 1573 Van Dusen Lane- Site & Architectural Approvals Page 4 12. Size of Plans: The maximum size of construction plans submitted for building permits shall be 24 inches by 36 inches. 13. Soils Report: Two copies of a current soils report, prepared to the satisfaction of the Building Official, containing foundation and retaining wall design recommendations shall be submitted with the building permit application. This report shall be prepared by a licensed civil engineer specializing in soils mechanics. 14. Site Plan: Application for building permits shall include an accurate site plan that identifies property and proposed structures with dimensions and elevations as appropriate. The site plan shall also include site drainage details. 15. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land surveyor shall be submitted to the project building inspector upon foundation inspection. This certificate shall certify compliance with the recommendations as specified in the soils report and the building pad elevation and on-site retaining wall locations and elevations are prepared according to approved plans. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer for the following items: a. pad elevation b. finish floor elevation (first floor) c. foundation comer locations 16. Title 24 Energy compliance: California Title 24 Energy Compliance forms CF-IR and MF- 1R shall be blue-lined on the construction plans. 8~ by 11 calculations shall be submitted as well. 17. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 18. Non-Point Source Pollution Control: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" by 36") is available at the Building Division service counter. 19. Approvals Required: The project requires the following agency approvals prior to issuance of the building permit: West Valley Sanitation District (378-2407) Santa Clara County Fire Department (378-4010) School District: Planning Commission Resolution No. 3367 PLN2001-20/21/22 - 1555, 1561 & 1573 Van Dusen Lane- Site & Architectural Approvals Page 5 i) ii) iii) iv) Campbell Union School District (378-3405) Campbell Union High School District (371-0960) Moreland School District (379-1370) Cambrian School District (377-2103) Note: To Determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. PUBLIC WORKS DEPARTMENT 20. Parcel Map: Prior to issuance of any building permits, the applicant shall record a Final Parcel Map and provide evidence that all the Conditions of Approval of the Tentative Subdivision Map have been met. 21. Preliminary Title Report: Prior to issuance of any grading or building permits for the site, the applicant shall provide a current Preliminary Title Report. 22. Grading and Drainage Plan: Prior to issuance of a grading or building permit for each site, the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1994 edition of the UBC including Chapters 18, 33, and Appendix Chapter 33. Should the development require hauling of soil or other demolition materials on or off site, the applicant shall request and obtain approval of a haul route from the City Engineer. 23. Maintenance Security: Prior to issuance of occupancy approval for the site, all public street improvements required by the street improvement agreement and the encroachment permit must be completed and accepted by the City and the applicant must provide a one-year Maintenance Security in an amount of 25% of the Faithful Performance Bond. 24. Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and Sewer Cleanout(s) shall be installed on private property behind the public right-of-way line. 25. Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. 26. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall submit a Utility Installation Coordination Plan and Schedule for approval by the City Engineer for installation of street improvements and/or abandonment of all utilities. Streets, which have been resurfaced within the previous five years, will require boring and jacking Planning Commission Resolution No. 3367 PLN2001-20/21/22 - 1555, 1561 & 1573 Van Dusen Lane- Site & Architectural Approvals Page 6 for all new utility installations. Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. 27. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee which is $2,000 per acre. 28. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permitting requirements and the California Storm Water Best Management Practices handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District and the City of Campbell Municipal Code regarding Storm Water Pollution Prevention. FIRE DEPARTMENT 29. Required Fire Flow: The required fire flow for this project has been calculated at 1,750 gpm at 20-psi residual pressure. The required fire flow is available from area water mains and fire hydrant(s), which are located at the required spacing. 30. Final Parcel Map Approval: The applicant shall provide a copy of the recorded final parcel map prior to the issuance of building permits for the project. 31. Premises Identification: Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background PASSED AND ADOPTED this l0th day of July, 2001, by the following roll call vote: AYES: Commissioners: Doofley, Francois, Lowe NOES: Commissioners: None ABSENT: Commissioners: Jones ABSTAIN: Commissioners: None Gibbons, Hemandez, Lindstrom and ATTEST: APPROVED: Sharon Fierro, Secretary