Loading...
PC Res 3781 RESOLUTION NO. 3781 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL GRANTING A SITE AND ARCHITECTURAL REVIEW PERMIT (PLN2006-108) TO ALLOW THE CONSTRUCTION OF AN ADDITION TO AN EXISTING SINGLE- FAMILY RESIDENCE ON PROPERTY OWNED BY MR. PHAM DINH NGUYEN LOCATED AT 1215 AUDREY AVENUE IN AN R-1-10 (SINGLE FAMILY RESIDENTIAL) ZONING DISTRICT. APPLICATION OF MR. PHAM DINH NGUYEN. FILE NO: PLN2006- 108. After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application PLN2006-108: 1. The density of the proposed project site is 2.4 units per gross acre, which is consistent with the General Plan land use designation of Low Density Residential (less than 3.5 units per gross acre). 2. The proposed project is consistent with the R-1-10 (Single-Family Residential, 10,000 square foot minimum lot size) Zoning District and meets the minimum setbacks, height restriction, building coverage, floor area ratio, and parking requirements of the R-1-10 Zoning District. 3. The project is consistent with the development standards and design guidelines of the San Tomas Area Neighborhood Plan. 4. The home consists of a 3,633 square foot one-story single-family residence, with a building coverage of 23% and a floor area of 22%. 5. The project provides two covered and two uncovered parking spaces, where a minimum of one covered and one uncovered parking space is required. 6. The height of the home is 19'-0", where the maximum height limit is 28'-0". 7. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood. 8. The proposed project does not include the removal of any protected trees. 9. The proposed one-story residence incorporates representative architectural features of homes in the San Tomas Neighborhood including simple hipped and gabled rooflines, a stucco exterior, and an attached garage. Planning Commission Resolution No. 3781 PLN2006-108 - 1215 Audrey Avenue - Site and Architectural Review Permit Page 2 10. The proposed project is surrounded by single-family residential uses on all sides. 11. The project qualifies as Categorically Exempt under Section 15301, Class 1 of the California Environmental Quality Act (CEQA) pertaining to the construction of additions to existing residences. Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The proposed project is consistent with the City of Campbell General Plan and Zoning Ordinance. 2. The proposed project, as conditioned, will aid in the harmonious development of the immediate area. 3. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood. 4. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required conditions of approval, will have a significant adverse impact on the environment. 5. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 6. The proposed project will contribute to the housing stock in the City of Campbell and serve the housing needs of the community. 7. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 8. There is a reasonable relationship and a rough proportionality between the conditions of approval and the impacts of the project. THEREFORE, BE IT RESOLVED that the Planning Commission approves a Site and Architectural Review Permit (PLN2006-108) to allow the construction of an addition to an existing single-family residence on property owned by Mr. Pham Dinh Nguyen located at 1215 Audrey Avenue in an R-1-10 (Single Family Residential) Zoning District. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under Planning Commission Resolution No. 3781 PLN2006-108 - 1215 Audrey Avenue - Site and Architectural Review Permit Page 3 review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Plannina Division: 1. Approved Proiect: Approval is granted for a Site and Architectural Review Permit to allow the construction of a new addition to an existing single-family residence located at 1215 Audrey Avenue. The building design and site design shall substantially conform to the project exhibits listed below, except as may be modified by the conditions of approval herein: a. Project Plans and color/material board prepared by the project designer, Daniel Zavoiu and received by the Planning Division on September 25, 2006, including a site plan, floor plans, and elevations. b. Applicant to work with the Community Development Director on the selection of an upgraded garage door that provides some sort of a vertical element in the middle to soften its visual appearance. 2. Approval Expiration: The Site and Architectural Review Permit approval shall be valid for a period of one year from the date of final approval. Within this one-year period, a building permit must be obtained and construction completed one year thereafter or the Site and Architectural Review Permit shall be void. 3. Fences: Any existing or new fencing shall comply with Section 21.18.060 of the Campbell Municipal Code. Fencing along the property lines shall be replaced with a new fence at the expense of the applicant, unless it is determined to be in good condition by the Community Development Director. 4. Propertv Maintenance: The property is to be maintained free of any combustible trash, debris and weeds until the time that actual construction commences. All existing structures shall be secured by having windows boarded up and doors sealed shut, or be demolished or removed from the property (Section 11.201 and 11.414,1985 Ed. Uniform Fire Code.) 5. Parkina and Drivewavs: All parking and driveway areas shall be developed in compliance with the approved plans and Chapter 21.28 (Parking and Loading) of the Campbell Municipal Code. Applicant shall provide semi-pervious pavers or stamped concrete for the driveway. Planning Commission Resolution No. 3781 PLN2006-108 - 1215 Audrey Avenue - Site and Architectural Review Permit Page 4 6. Landscape Plan: The applicant shall submit a final landscape plan, prior to the issuance of building permits, for review and approval by the Community Development Director. The landscape plan shall substantially conform to the approved site plan and the City's Water Efficient Landscaping Standards (WELS). The two required trees shall be installed prior to the issuance of a Certificate of Building Occupancy. 7. Utilities: All new on-site utilities shall be installed underground per section 21.18.140 of the Campbell Municipal Code. 8. On-Site Liahtina: On-site lighting shall be shielded away from adjacent properties and directed on site in compliance with Section 21.18.090 of the Campbell Municipal Code. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 9. Contractor Contact Information Postina: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 10. Construction Hours: Construction activities will be limited to the hours of 8:00 a.m. to 5:00 p.m. weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and Holidays, unless an exception is granted by the Building Official. 11. Roof Vents: The applicant shall coordinate mechanical and plumbing plans to minimize the number of roof vents that are visible from the street frontage. The applicant shall provide the location of such vents on the building plan elevations and roof plans, to the satisfaction of the Community Development Director, prior to issuance of a building permit. BuildinCl Division: 12. Permits Reauired: A building permit application shall be required for the proposed new single family dwelling. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 13. Plan Preparation: Portions of this project require plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying profeSSional person. 14. Construction Plans: The conditions of approval shall be stated in full on the cover sheet of construction plans submitted for building permit. Planning Commission Resolution No. 3781 PLN2006-108 - 1215 Audrey Avenue - Site and Architectural Review Permit Page 5 15. Size of Plans: The size of construction plans submitted for building permits shall be 24 inches by 36 inches. 16. Site Plan: The application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. site plans shall also include site drainage details. 17. Title 24 Enerav Compliance: California Title 24 Energy Compliance forms CF-1 R and MF-1 R shall be blue-lined on the construction plans. 8% by 11 calculations shall be submitted as well. 18. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 19. Non-Point Source Pollution Control: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" by 36") is available at the Building Division service counter. 20. Approvals ReQuired: The project requires the following agency approvals prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. Bay Area Air Quality Management District (Demolitions Only) d. School District:* i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (379-1370) iv) Cambrian School District (377-2103) *To determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. 21. P.G.&E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with PG&E concerning utility easements, distribution pole locations, and required conductor clearances. Planning Commission Resolution No. 3781 PLN2006-108 - 1215 Audrey Avenue - Site and Architectural Review Permit Page 6 22. Intent to Occupv Dwellina: Owners shall declare their intent to occupy or not occupy the new dwelling upon completion of construction. Forms can be obtained at the Building Division Counter. 23. Construction Fencina: This project shall be properly enclosed with construction fencing to prevent unauthorized access to the site during construction. The construction site shall be secured to prevent vandalism and/or theft during hours when no work is being done. All Protected trees shall be fenced to prevent damage to root systems. PUBLIC WORKS DEPARTMENT 24. Plan Lines: Prior to issuance of any grading or building permits for the site, the applicant shall provide a plan layout showing the correct street dimensions (dimension widths of the entire street and dimension from property line to center line of roadway), and existing street improvement dimensions (sidewalk, curb, gutter, etc.). 25. Work in the Public-Riaht-of-Wav: Prior to doing any work in the public right-of-way, the applicant shall obtain an encroachment permit, provide plans, pay fees and deposits, post security, and provide insurance. 26. Utilities: All on-site utilities shall be installed underground per Section 21.18.140 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. 27. Utilitv Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services are to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for new utilities shall be used whenever possible. 28. Utilitv Encroachment Permit: Separate permits for the installation of utilities to serve the development will be required (including water, sewer, gas, electric, etc.). Applicant shall apply for and pay all necessary fees for utility permits for sanitary sewer, gas, water, electric, and all other utility work. 29. Pavement Restoration: Based on the utility coordination plan, the applicant shall prepare a pavement restoration plan for approval by the City Engineer prior to any utility installation or abandonment. Streets that have been reconstructed or overlaid within the previous five years will require boring and jacking for all new utility Planning Commission Resolution No. 3781 PLN2006-108 - 1215 Audrey Avenue - Site and Architectural Review Permit Page 7 installations. Audrey Avenue has not been reconstructed or overlaid in the last 5 years. The pavement restoration plan shall indicate how the street pavement shall be restored following the installation or abandonment of all utilities necessary for the project. 30. Additional Street Improvements: Should any new utility main lines or other work required to service the development affect any public improvements, the City may add conditions to the development/project, at the discretion of the City Engineer, to restore pavement or other public improvements to the satisfaction of the City. 31. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee of $2,060.00 per net acre, which is $763.00. COUNTY FIRE DEPARTMENT 32. Formal Plan Review: Review of this Developmental proposal is limited to acceptability of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall make application to, and received from, the Building Department all applicable construction permits. 33. Required Fire Flow: The fire flow for this project is 1000 gpm at 20 psi residual pressure. The required fire flow is available from area water mains and fire hydrant(s) which are spaced at the required spacing. 34. Premises Identification: Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. Revise drawings in writing to reflect compliance with this requirement. Planning Commission Resolution No. 3781 PLN2006-108 - 1215 Audrey Avenue - Site and Architectural Review Permit Page 8 PASSED AND ADOPTED this 28th day of November, 2006, by the following roll call vote: AYES: Commissioners: Alderete, Doorley, Francois, Gibbons, Rocha and Roseberry None Ebner None NOES: ABSENT: ABSTAIN: Commissioners: Commissioners: Commissioners: APPROVED~~ ~ Bob Alderete, Chair ATTEST:~~ y~ " Sharon Fierro, Secretary