Loading...
PC Res 3266RESOLUTION NO. 3266 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL GRANTING A SITE AND ARCHITECTURAL APPROVAL TO ALLOW MODIFICATIONS TO EXISTING INDUSTRIAL BUILDINGS ON PROPERTIES LOCATED AT 200-254 HACIENDA AVENUE AND 1315-1357 DELL AVENUES IN A CM/B-80 (CONTROLLED MANUFACTURING) ZONING DISTRICT. APPLICATION OF MR. BROCK GRAYSON. FILE NO. PLN2000-25. After notification and public heating, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the heating was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application PLN2000-25 An initial study was prepared for this project which concludes there are no significant environmental impacts and a Negative Declaration has been prepared for this project. The proposed building design and site layout are consistent with the industrial land use of the General Plan and the (CM B-80) Controlled Manufacturing designation for the site. The proposal achieves the following objectives: a) Provides attractive architectural elevation of the project buildings. b) Accommodates driveways and parking circulation to serves the proposed use consistent with the parking standards of the City. c) Creates an architecturally pleasing project reflective of the other approved research and development parks in the community through the introduction of landscaping and pavement treatments. o The proposed circulation accommodates the parking and access needs of the proposed uses. o The proposed project design addresses the site planning issues of the building placement and integrates the use with the surrounding neighborhood and uses. The project site plan indicates that 20 percent of the project will be landscaped. The project will not create a nuisance due to noise, litter, vandalism, traffic or other factors. The project will not significantly disturb the peace and enjoyment of nearby residential neighborhood. Planning Commission Resolution No. 3266 ~ PLN2000-25/200-254 HaciendaJl 315-1357 Dell Ave - Site Approval - Vasona Technology Park Page 2 Based on the foregoing findings of fact, the Planning Commission further finds and concludes that: The proposed project will aid in the enhancement and the harmonious development of the immediate area. The establishment, maintenance, or operation of the uses will not be detrimental to the public health, safety, peace, morals, comfort or general welfare of persons residing or working in the neighborhood of such proposed use. The proposed site layout provides a desirable site layout for a research and development use in this neighborhood. The project is adequately served by streets of sufficient capacity to carry the kind and quantity of traffic such uses would generate. The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions in accordance with the ordinance of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT 1. Project Approval: Approval is granted for a Site and Architectural Review Permit (PLN 2000-25) allowing development on property located at 200-250 E. Hacienda Avenue and 1315 - 1357 Dell Ave. consisting of the following: · A research and development project accommodating 308,070 square feet in seven existing buildings. Project approval shall substantially comply with project plans prepared by Brock Grayson, Ware & Malcomb Architects, Inc, dated 3/2/00,consisting of 17 sheets, except as modified by the Conditions of Approval contained herein. A four lot subdivision. Map approval shall be consistent with the tentative map prepared by Kier & Wright, Civil Engineers & Surveyors, dated February 2000 consisting of 2 sheets. · Project Planning and Phasing dated February 23, 2000 consisting of three pages prepared by Ware & Malcomb Architects,Inc. · Exterior parking, landscaping and building exterior improvements shall be completed within one year of Planning Commission approval on or before April 11,2001. · Building interior remodels and new occupancies shall comply with the applicant's project phasing and planning schedule, amendments in this schedule may be considered by the Community Development Director. 2. Detailed Building Elevations A. Materials and Colors: The applicant shall work with staff upon the recommendation of the Architectural Advisor to select specific building colors and materials for the new Planning Commission Resolution No. 3266 PLN2000-25/200-254 Hacienda/1315-1357 Dell Ave - Site Approval - Vasona Technology Park Page 3 o o o ° o the Community Development Director for review and approval prior to issuance of building permits. Architectural Details: The applicant shall submit plans and illustrated brochures indicating the location and design of architectural features such as light fixtures and parking lot lighting for approval by the Community Development Director. Parking and Driveways: All parking and driveway areas shall be developed in compliance with the approved plans and Chapter 21.50 (Parking and Loading) of the Campbell Municipal Code, subject to review by the Community Development Director. Trash Enclosures: Trash containers of a size and quantity necessary to serve the proposed use shall be located in areas approved by the Fire department and the Community Development Director and shall be designed to be architecturally compatible with the buildings and use with which it is associated. All trash enclosures are to be constructed at grade level and have a level area adjacent to the trash enclosure area to service these containers. Landscape/Irrigation Plan: The applicant shall submit four (4) sets of the landscape/irrigation plan indicating the details of project landscaping. Final plan to be prepared consistent with the WELS standards and the Tree Preservation Ordinance. The plan shall include the following: A) Details of enhanced pavement treatments at entry driveways. B) Provision of irrigation and planting details for all planting areas. C) Introducing a minimum 24-inch box trees and 5 gallon shrubs landscaping concept as well as relocating existing trees on the site. D) Tree Removal permit if applicable. as a part of the Signage Program: No signage is approved as part of the development applications approved herein. The applicant shall submit a sign program indicating all signs for the site including building identification, directional and multi-tenant monument signs . No sign shall be installed until such application is approved and a permit issued by the Community Development Director as specified in Chapter 21.53. of the Zoning Ordinance (Sign Ordinance). Construction Mitigation Measures: The applicant shall implement measures as specified in the Initial Study including the following: 1. Construction activities will be limited to daytime hours of 8:00 am to 5:00 p.m. weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and Holidays unless an exception is granted by the Building Official. 2. No pile driving is allowed for construction of the project. 3. All internal combustion engines for construction equipment used on the site will be properly muffled and maintained. All stationary noise generating construction equipment, such as air compressors and o Planning Commission Resolution No. 3266 PLN2000-25/200-254 Haciendadl 315-1357 Dell Ave - Site Approval - Vasona Technology Park Page 4 10. 11. 12. 13. 14. portable power generator, will be located as far as practical from the existing residences and businesses. 5. All active construction areas shall be watered at least twice daily. 6. Cover all trucks hauling soil and other loose materials stationed or prior to leaving the site. 7. Pave, apply water, or apply non-toxic soil stabilizers on all unpaved surfaces, and staging areas at the construction site. 8. Sweep daily all paved access roads, parking areas, staging areas, and adjacent public streets as directed by the City Engineer. 9. Enclose, cover, water or apply soil binders to exposed stockpiles. 10. Install sandbags or other erosion control measures to prevent runoff to all roadways, waterways or pubic walkways accessed by the public. Archaeological Monitoring Program: Provide an archaeological monitoring program prepared by a qualified archaeologist to monitor all subsurface excavation and construction for review and approval by the Community Development Director prior to the issuance of building permits. Garbage Collection and Outdoor Storage Facilties: Trash containers of a size and quantity necessary to serve new or modified building areas shall be located in areas approved by the Fire Department. Unless otherwise noted, enclosures, shall consist of a concrete floor surrounded by a solid wall or fence and have self-closing doors of a size specified by the Fire Department. All enclosures to be constructed at grade level and have a level area adjacent to the trash enclosure area to service these containers and to be architecturally compatible with the building walls. Outdoor storage facilities are prohibited unless authorized by the City in an architecturally designed enclosure. Mechanical Equipment: All roof-mounted and ground level mechanical equipment on new or remodeled structures on site, which are visible from the public right of way, shall be screened with similar building materials subject to the approval of the Community Development Director. Disabled Accessibility: All new and remodeled buildings shall provide disabled access in accordance with the Uniform Building Code (UBC), and the Uniform Federal Accessibility Standards (UFAS) and the Federal Americans with Disabilities Act (ADA). Phasing Plan: Applicant to submit a phasing and parking management plan for review and approval of the Community Development Director prior to the issuance of building or site development permits. The phasing and parking management plan shall ensure availability of project parking and access for existing uses. C,C & R's: Prior to recordation of the parcel map, applicant to prepare Covenants, Conditions and Restrictions in association with the map providing for mutual access, and parking and utility easements and ensuring maintenance of landscaping, parking areas, architectural continuity and common trash collection facilities. C, C & R's to be reviewed Planning Commission Resolution No. 3266 PLN2000-25/200-254 Hacienda/1315-1357 Dell Ave - Site Approval - Vasona Technology Park Page 5 and approved by the Community Development Director. It is required that the appearances of the buildings provide continuity. FIRE DEPARTMENT REQUIREMENTS 15. Developmental Review: Review of this proposal is limited to site access and water supply as they pertain to fire department operations and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes or building standards. Prior to performing any work, the applicant shall apply to the Building Department for appropriate construction permits. 16. UBC Compliance: At time of Building permit application, the applicant shall show compliance with the Uniform Building Code relative to any occupancy or area separation and exiting requirements. 17. Fire Sprinklers: The existing building's fire sprinkler system(s) shall be updated as necessary to accommodate any new proposed designs. Each system, if so modified, shall have plans submitted to this department for review and approval prior to any such modification occurring. 18. Hydrant/Fire Service Water Main System: As the proposed Tentative Map indicates that property lines will now intersect the existing, on-site fire hydrant and building fire service water main system, identify to this department in writing and with any such plan revision as may be necessary, how ownership and maintenance of these facilities will be continued. 19. HazMat Plans: It is required that HazMat Plans be filed with Santa Clara County Fire for uses on the site. BUILDING DIVISION REQUIREMENTS 20. Permits Required: A building permit application shall be required for the proposed changes in use (Industrial). The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 21. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. Plans shall be prepared to reflect all work associated with tenant improvement for the new proposed use. Code requirements for new use shall be identified and detailed in plans. 22. Size of Plans: The maximum size of construction plans submitted for building permits shall be 24 inches by 36 inches. 23. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C. Section 106.3.5. Please obtain City of Campbell Special Inspection forms from the Building Department. Planning Commission Resolution No. 3266 PLN2000-25/200-254 Hacienda/1315-1357 Dell Ave - Site Approval - Vasona Technology Park Page 6 24. Non-Point Source Pollution Control Program: The City of Campbell standard Santa Clara Valley Non-Point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" x 36") is available at the Building Department. 25. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: A. West Valley Sanitation District B. Santa Clara County Fire Department PUBLIC WORKS DEPARTMENT 26 Tentative Parcel Map: Prior to issuance of any grading or building permits for the site, the applicant shall submit a Tentative Parcel Map for review by the City. The current application processing fee is $2,257.50. 27 Parcel Map: Prior to issuance of any building permits for the site, the applicant shall submit a Parcel Map for recordation upon approval by the City. The current plan check fee is $1,125.00 plus $25 per parcel. 28. Preliminary Title Report: Prior to recordation of the Parcel Map, the applicant shall grant a Public Sidewalk Easement, as necessary, on private property along Dell Avenue and Hacienda Avenue frontages. The applicant shall cause all documents to be prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and recordation. 29. Easements: Prior to recordation of the Parcel Map, the applicant shall cause Easements to be recorded for private utilities, private storm drains, reciprocal ingress/egress and other easements as necessary. 30. Monuments: Prior to recording Parcel Map, all Monuments shown on the record map shall be set. 31. Street Improvement: Construction of an ADA compliant sidewalk with pedestrian ramps, accessible to the public, located within the existing mounded landscaped areas along the Hacienda and Dell Avenue frontages of the development. The sidewalk and associated sidewalk lighting, designed and constructed as required by the City Engineer, shall be maintained and operated in a safe and satisfactory manner by the owners. 32. Water Meter(s) and Sewer Cleanout(s): Existing and proposed water meter(s) and sewer cleanout(s) shall be installed on private property behind the public right-of-way line. 33. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall submit a Utility Installation Coordination Plan and Schedule for approval by the City Engineer for installation of street improvements and/or abandonment of all utilities. Streets, which have been resurfaced within the previous 5 years, will require boring and Planning Commission Resolution No. 3266 PLN2000-25/200-254 Hacienda/1315-1357 Dell Ave - Site Approval - Vasona Technology Park Page 7 34. 35. 36. 37. jacking for all new utility installations. Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. Drainage System: Prior to occupancy clearance, the applicant shall refurbish, remodel and reconstruct the on-site drainage system, as necessary, to demonstrate that the facilities are functioning normally in accordance with the requirements of the City. Storm Drain Area Fee: Prior to recordation of the Parcel Map, the applicant shall pay any unpaid Storm Drain Area Fee, which is $2,500 per acre. Santa Clara Valley Water District (SCVWD): Prior to recordation of the Parcel Map, the applicant shall obtain clearance from the SCVWD. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permitting requirements and the California Storm Water Best Management Practices handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District and the City of Campbell Municipal Code regarding Storm Water Pollution Prevention. This includes filing of a Notice of Intent with the Regional Water Quality Control Board and preparation of a Storm Water Pollution Prevention Plan. PASSED AND ADOPTED this 11th day of April, 2000, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: Commissioners: Commissioners: Commissioners: Commissioners: Francois, Gibbons, Jones, Kearns, Lowe None Hernandez, Lindstrom None APPROVED~,,.~~ ~ ~~ EliZabeth Gibbons, Chair ATTEST: Sharon Fierro, Secretary