1589 S. Bascom (99-37)
DEVELOPMENT REVIEW COMMENT SHEET
PRE-APPLICATION
Distribution:
Comments:
July 26, 1999
August 9, 1999
ROUTE TO:
Architectural or Landscape Advisor
X Fire Department
Police Department
Redevelopment Agency
X Engineering
X Traffic Engineering
Corporation Yard
X Building Division
PROJECT DESCRIPTION: Pre-application to consider the remodel of an existing service station,
Chevron, consisting of the addition of a new gasoline dispenser and the construction of a new 1,300 square
foot pay point building.
INFORMATION:
File No: PA 99-37
APN: 282-24-007
Applicant: Robert Kurima
Project Address: 1589 S. Bascom Avenue
Zoning: C-2-S (General Commercial) zoning district
General Plan: Commercial
PROJECT PLANNER: Aki R. Irani
DEPARTMENTAL RECOMMENDATION:
If it can be determined that this project will require minimal or no comments by your department/agency,
please return this comment sheet with your initials to the Project Planner as soon as possible.
Status
Initial
No Comment
Additional informationlrevisions(see attached)
Draft conditions of approval attached
~
/
;,:
CheVrOn
=== Chevron
San Ramon, CA
July 14, 1999
City of Campbell
Community Development Department
70 N. First Street
Campbell, CA 95008
~~
. '~--
;.:~'i _ ,:~ ':'" <'"~ ~_:.
"':'-'..~;,,'I'.. .,
-'-.'
, '. J
; f J, -..-
0': ,'1 - , ,
'. '...,...'
CITY n!: t'\ ..
'"' ~ I V 1" ,'pln
t)L4NN1i"VG:D/P~L
CHEVRON STATION #9-7870
1589 S. BASCOM AVE.
CAMPBELL, CA
Aki Irani, Planner I
Please find the enclosed 6 copies of the site plan for the proposed Chevron project at the comer
of S. Bascom and Hamilton. The drawing is on a 1" = 20' -0" scale.
The scope of the project is as follows: reuse existing underground storage tanks (4) in their
current position; demolish existing under-canopy pay point building and replace with an
additional gasoline dispenser (for a new total of 6 dispensers); the existing canopy and dispensers
will remain in their current configuration; construct a new remote pay point building with
approximately 300 sq. ft. of sales area and a total area of approximately 1300 sq. ft.; and install
additional monument identification signage.
Some of the concerns that I have pertain to required setbacks from property lines and being able
to comply with the City of Campbell Streetscape requirements on such a small, limited site. Our
initial concerns, as on any of our service station sites, involve customer ability to safely circulate
around the site, a safe path for our tanker truck deliveries, easy and safe access onto and off of
the property, and clearances between our dispensers and other obstacles (i.e. curbing, building,
etc.).
If you have any questions or concerns, please do not hesitate to call Robert Kurima at 925-842.
2877. Thank you very much for your time and suggestions.
r-R~\~
Robert Kurima
Property Development Specialist
Cc: file
C:\Jcuri\7870 Pre application document.doc
~I
....1
8/
;1
('
+-'
'+-
CT
(f)
o
ex)
t0
N
N
"
>-
I-
0:::
W
0...
o
0:::
0...
C'~
f
to
", 0
t:" "
~;thA
~" ....~
,,', I.
:!'~-~.
1: ;tiM
~ "'1
':"/'
", .1
I
II
aJ
II
--'.
N~
C'i", c,j a...
"-' a.. lL.f
h? '"<'"'70
~.~ :r. <!:S
()~
- It.. ~.=:;
-J O~
;:; f: ~
(.)
e
:rtQy ~ Hlnoe
~
r---____________ ,
'----------.
,
,
,
,
,
,
,
I
I
,
I
,
~ "'q] I
I
I
,
I
,
I
I
------- ,
I
I
,
I
' :,
L----______l____ ~
--
AI .01,1" .ra S
:::---:::::
o ---_______ 0
" \
1 0 0 ::) ~ I
''----------"
"----------\
1 0 0 ::) ~ ,
''----------"
I (0 O--:-~--~
''----------"
, "----------\
, 1 00 . ~ ,
, "
~ -- ------- 0
,
"
~
,
,
I
,
,
,
, 1
,
,
1
10
,
,
1
I
1
,
,
,
,
,
1
,
,
1
,
CJ
{Cr... ~
I
/
---
~..~
(en.. ~
,
~~\
.'"
{'~
''i>'
i-,
,
,
.....
"-
.--
~
--
.....
"-
r--
N
~~
I~
~
'1 :3
Iii
I'"
~
....
x
~
l!!
~y
Z.
~~
O~
o
lC)
i
i
ll"IM_
OH'U/S8-II-lIO/0L8L
o \'. C44t
2~'~. \
... "-
"So....
.. ,
'O.qCH ...'i\.Q "
CITY OF CAMPBELL
Public Works Department
August 10, 1999
Mr. Robert Kurima
Chevron
600 I Bollinger Canyon Road
San Ramon, CA 94583
Re: PA #99-37
Remodel of Chevron Station (#9-7870)
1589 S. Bascom Avenue, Campbell, CA
Dear Mr. Kurima:
In accordance with our discussions, I am enclosing a copy of some of the documents
related to the preliminary application processed for the above-referenced site concerning
remodeling of the service station. Please consider eliminating the two driveways nearest
the intersection similar to the prior application, copies of which are enclosed.
Please give me a call at (408) 866-2158 if you would like to discuss this matter further.
/
.(/
j /
I
Enclosures
cc: Peter Eakland, Traffic Engineer
Bill Helms, Land Development Manager
H:\ WORD\LANDDEV\CHEVRON(JD)
70 North First Street' Campbell, California 95008-1423 ' TEL 408,866.2150 'FAX 4083760958 . roD 408.866.2790
~ ~
",
O~'CA.c,
~~.. A~~
... r"
U ~
o 0
... ...
'$0 ..
~. ,,'
O"CH"Y.O'
MEMORANDUM
CITY OF CAMPBELL PUBLIC WORKS DEPARTMENi
TO:
Barbara Ryan
Project Planner
DATE: August 29, 1996
FROM:
Michelle Quinney, City Engineer
Cruz S. Gomez, Assistant Enginee~~G9- /.;1////---
Peter Eakland, Traffic Engineer [T1~ ~
Application No. P A 96-34
Address: 1589 S. Bascom Avenue
Applicant: Eugene Silva for Robert H. Lee
Project Description: Addition of Mini-Mart, Consolidation of Driveways, New
Driveway Width (40' to 45'), Streetscape Installed to Avoid Need to Move
Canopy, New Tanks (3 in 1)
SUBJECT:
Preliminary application comments based upon a rough sketch submitted by the applicant:
1. Dedicate street right-of-way for Bascom and Hamilton Avenues to 17 feet north from the
existing face of curb of Hamilton Avenue, to 17 feet west from the existing face of curb of
Bascom Avenue, including to a 17 feet radial distance northwesterly from the existing face of
curb at the return area.
2. Remove existing sidewalk and the two existing driveways closest to the return area.
3. Construct standard sidewalks and streetscape peer Streetscape Standards for Bascom and
Hamilton Avenues.
.'
4, Relocate the two remaining driveways, including drainage facilities, to reflect the loss of one:
driveway. The driveway on Hamilton should be 40 feet wide. The driveway on Bascom should
be at least 30 feet wide. Although a wider driveway would be desirable, it would not be
desirable to have a potential conflict between traffic going to the outbound lane and vehicles
parked at the closest pump area (worst case would be a northbound vehicle at the northernmost
hose with the gas tank in the rear of the vehicle). The driveway radii should be increased to
compensate for the inability to widen the driveway to 40 feet.
5. Remove and replace existing street lighting system, including foundations, complete standards,
mast arms, luminaires, pull boxes, conduits, conductors, and appurtenances. Relocate sign
panels on new standards.
-..
,-
Barbara Ryan
1589 S. Bascom Avenue
August 28, 1996
Page 2
6. Remove and reconstruct curb ramp.
7. Relocate sanitary sewer cleanouts and water meters to behind back of new sidewalks or
driveways.
8. Remove and replace existing asphalt concrete pavement, 12" strip, at driveway removal areas.
"
"
h: \1589sbascom.coa(mp)
~
I
/
I -
I
2. I
I I
1
j ,'"
!wl
~l
oil
-,
J,r.~.lq,'!'zi
I
~
/--" .",...... ,..... ,.......
,( ,/ '1" '-
1 I I I I I
~O':Ollollof-,
I 'I I' " I ~
,"'11~11~11~11
I II I' I )-
IOllOllOllol ~
I ), ,I if} ~
\~__ \_~/ \...--1 '.~"" ~
'-I
M
lPfi "..
I I : /, I
I :: :
.---4:).... _______"" ______~-- 1, .1
t 11 ~ 7=';---
! a!"G .~ i i 11
I .,..~ ~ ~ ~ r
I _'4t ~ I ...l i c... 19
I a ~ ~ 'i, I ~
....; I v
, III Jl '" '
I ".3 i \ I
I I , I l
L_ ~ ~.!.."'I
--;~-----~ ...~----~
II II V -
I L.J~
I : ~l
I J ~ t(
, 1 ~e
,-.... III ~
!~
~~
1'_...
(
i
-
il
~!
.J
lot
I !
, ). I
~ 1 i
, ~ !
I ! i
I Q'!
1 'J '
, '
t\-.
Jl '!!
"fQ
1-~
-*
g .1
~
~~
(/1-----
r!..
~
-l1
~~
3~
z
.~,-a
.."
-
~ ,
'1;- ~~ ;~-{;i
I \ fr'"..... I
, \
J~
~J
~v ~O.J.'lJ,1ffi
~
I'
~
,r
,
n, ;
&as
~
t:
S
~
i
8-26-1 996 1 1 : 4eAM :. "'fRO.' '::AMPBELL PUBL I C WKS 408 3760958
"
-', :.": ~
t::..
" c
0(
,.
,
"" ~
..
{:!'
I;'
I.
~. l~
<..:
(':}
, -
" -!-<
& ~
'" 'f
t' '."
',"",
~
\
-'f'
-\,
M
~
-
.~
r
f?~
~~
.2 ~J
t)~
S~
1-
e~
~~ 0
r
, ,
1 ,
I i a.----'-
, 1
1 '
r-tJ
J Co
\' 1: 00
' 'e -.r
I ! ~
~ ~
.~
loeJ
I
J
-~
il
._ _.-I
I
I
I -
/
,_"I.
~
~
~
.(l'. ,..,
.J.r1~J.q,1'l:l1
~
'.')-
,~"\ (~..., 1'......, ,"'-,
'01. II II h
1 1101101101
I 'I II II I ~
1"'I~II:1dt111
I I JI 'f ...
'OIJO';O,.of ~
t,_J l~) \......) t....~) g
I ,
,01
I
!
)'
.
. I
~ . 1
r--.p.------.ti(;-~---~-..;. I
; A -i .~,;: A: i
I ~ ~ f" C\l tl .
I la, v ~ ~
I -0 a w C[: . $
I "~~~ ,
I L. (S . ,
: .a e.a ~ 1 ~. \
L~____ _~~t.'\..!____~_
'-.0- I ,VI , V
IW~
I f ~l
~ } ~~
,-, ! ~
1IC."6
,ot .
~.
.A od
1-~
ilr
is ..~
~~
P.2
~; ;2
I' '~
CM: ; <:
i' ;~
. I .
II i ~
rll
J; ~! ~
1:[ i
~
\'-'
P
t: 0.-
il 0'..,
3 ~<:\
i
'J\~
\-
\) .
\\\ .,.
",.
~ x
2' "'~
...~-~ '.k
~ [~ v,
......-: . \
~
" S'
"if
\. .
'Ii
!j ~
"
{"It
Y.
~".. .(
~~
,t
~
-(t~ ,:\
\,,' "
'>
1J,.,..i,
"
,,,,I
:>" '
Y
rj . "".c
~ ~~
c... ~. ~
~:1
l4 r::;. 'i ~
<. -..
~J
4 .
DEVELOPMENT REVIEW COMMENT SHEET
'-~t 4- -9.t~~
Comments: August 26, 1996
ROUTE TO:
X Architectural
X Fire Department
X Police Department
Redevelopment Agency
X Engineering
X Traffic Engineer
Corporation Yard
X BuildingDivision
1~-{ \2-.
~~
C-~
.IG1''''O
~UG \. S ,~cao .
. C'88"nt
.~ ..."'lint'
p~"'"-
PROJECT DESCRIPTION
Addition ofMini.man, consolidation of driveways. new dri\'cway widths wider (40' to 45' instead 000'),
streetscape installed in such a way that not need to move C:illopy, new tanks (3 in 1). See applicant's questions
on Transmittal letter.
INFORMATION:
Pre-app 96-34
Address: 1589 S, Bascom
APN 282-24-007
Applicant: Eugene Silva for Robert H. Lee
Zoning: C.2.S
General Plan: Commercial
PROJECT PLANNER: Barbara Ryan
DEPARTMENTAL RECOMMENDATION:
Streetscape on Hamilton and Bascom
Status
Initial
Comments attached
/ ~'(
~
)8ERT H. LEE & ASSOCIATES, INC.
. 1137 No. McDowell Boulevard
PETALUMA, CALIFORNIA 94954.14b_
~1~ -)~
ll.rE1Y1YlEOO CIDW uOO~~~[f1]01TiT~[b
(707) 765.1660
FAX (707) 765.9908
TO ~ ~y~~
{\ ~ 6f=. (l A'1PP-J:: r L-
ea I"iMMUUIli' t:::tw6L.OF'Ml?:.J.J'T"
.q08. e~..e~l
litE.:
WE ARE SENDING YOU QQ. Attached 0 Under separate cover via 1=',,-,4 the following items:
>
o Shop drawings 0 Prints 0 Plans 0 Samples 0 Specifications
o Copy of letter 0 Change order 0
COPIES DATE NO. DESCRIPTION
I e{ e.!qt- 1 ~ 6tTB ~
THESE ARE TRANSMllTED as checked below:
o For approval
o Approved as submitted
o Approved as noted
o Returned for corrections
o Resubmit_copies for approval
o Submit_copies for distribution
o Retum_corncted prints
>
o For your use
o As requested
JlI.. For review and comment
o FOR BIDS DUE
REMARKS~~ A -
'1C'u.. ,~ A JtS.Vt6IiD
Cl
19
Cl PRINTS RETURNED AFTER LOAN 10 US
~ I ~~n~c:'"'f1.IE! '6"1'R1:w'.-r"'Ct'JU'III, ~~~.
J.l~P- =- ~':::~:~ ~ pRSA:Jt. A ~DaDfn.~." ~A 1(:/ ~,~
I. ,
-- A J!!;. ~"'LJ.L1 ~ ~/~? u.11t ~o 10 ,...,~ ~~ ~~.
~ ~Q:)~"=~~~
UJE 1.\ ~ O~ ,e ~"E. ~~e. CM..fj,~"1 bJAtt)?
~ ('...out 0 c.P t'\A1C.I!. TJ.4P-. U~<.tJ OIt1\I~u.:A'1'6 t AdI4l:# ~u ~ ~OJ!. (4t;}.4t; ')1-
~ ~,u.. T'12A"F=I~ ~\~L.\~;=D ~ c:;...,ftUI ~v'J:I~ o,J S..JIASaoM ~ 6E ~~-.or
--r'U.a... \1t.!I~