Pruneyard Expansion Master Plan
..
MEMORANDUM
,_.~~ ~A~~~:t~
\" "Y1 "-' i
Date November ;\2~.~ {~: --. I
t(^~ ; .., H::(C(Ll~'~;~
~ I~ v () \ .,y_L',\fl"",'ij{'~1
\ c ;J'c?- \v1t~l~.
1 . ....--.---. 1;---.---- I
'l:--.,r< \ \.\ !
Lh">l.
......~_..-
To:
Bill Helms
Engineering Manager
From:
Gary Kruger, Traffic Engineer
Subject:
Pruneyard Traffic circulation and Access Issues
----------------------------------------------------------
Don has asked me to briefly list the traffic circulation
and access issues regarding the pruneyard and environs. There
are four areas of concern, and they are interrelated.
1. Pedestrian Circulation:
The pedestrian circulation system is deficient in
several ways. First, there is no sidewalk along the
north side of campbell east of Highway 17. Second, the
high volume driveways intersecting with Bascom lead to
driver inattention to pedestrians crossing in front of
them with consequent adverse safety impacts. Third, the
high intensity uses on both sides of Bascom create a
need to cross pedestrians between Campisi and Campbell.
However, there are insufficient gaps on Bascom for
crossing without a signal, even if the pedestrian only
crosses hal f of the road at a time. Likewise, the
addition of housing units south of Campbell on Barbano,
Michael Drive et al will also increase the desire for
midblock crossing of pedestrians. These pedestrian
needs should be addressed in any intensification of
development at the pruneyard.
2. Vehicular Access:
There are several operational and design problems at the
various driveways at the Pruneyard. The north driveway
on Bascom doesn't have sufficient unsignalized capacity
for left turns out of the driveway. The south driveway
on Bascom creates a confusing, ambiguous operation as
southbound cars turning right onto Campbell are
perceived by drivers leaving the driveway as trying to
enter the driveway. The driveways just east of Union on
Campbell are poorly located and interact improperly with
the signal at Campbell and Union.
GEK: CMBLMEMO.111
mt
-rv\f-
November 6, 1985
Mr. Arthur A. Kee
Planning Director
City of Campbell
70 North First Street
Campbell, CA 95008
"~'
Mr. Joseph Elliott
Public Works Director
City of Campbell
70 North First Street
Campbell, CA 95008
t~,.
;
.~'
.
f
Gentlemen:
...:/
This will acknowledge receipt of your letter dated November I, 1985
and its contents. We, of course, have no interest in appealing your
collective decision to the Planning Commission nor would we ever. I
will spend some time considering the concept of intensity within the
next week or two and perhaps get back to you with some suggested
changes.
'i:
ot
"':
Thank you for your courtesy and cooperation in considering our
request.
;:l;;; 7;Jd'
~;;d Sahadi
FS:as
Telex No. 346463
1901 S. Bascom Avenue
Suite 900
Campbell, CA 95008
Phone (408) 371-0811
Cable Address "Samar"
MEMORANDUM
..-)
\'-:'-)% ~". t-
--~- CITY OF CAMPBELL
To : Kevin Duggan, Ci ty Manager
Donald Burr, Police Chief
James Mt}fullen, Fire Chief
Joseph Elliott, Director of Public Works
Wallace Byron, Building Official
Date: .March 8, 1985
From: Arthur A. Kee
Planning Director
Subj ect: Proposed expansion of the Lnmeyard office/retail complex
(Pruneyard Diagrammatic Master Plan)
----------------------------------------------------------
The Planning Department has received a diagrammatic master plan to expand
the Pruneyard. The submitted site plan indicates the construction of two
twenty-story office buildings, each have 400,000 square feet and a five
level subterranean parking garage, and the construction of a twelve-story
(350 room) hotel complex with a three level subterranean parking garage.
A copy of submitted site plan is attached for your infonnation.
The applicant has requested that the City prepare a list of concerns which
might be discussed or addressed in an Environmental Impact Report of such
a proposed expansion of the Pruneyard.
Your review of this preliminary proposal and a list of your concerns would
be appreciated by the Planning Department, so that a letter responding to
this request may be prepared.
A meeting to discuss this proposal has been scheduled for Monday March 18,
1985, at 10:00 a.m. in the Manager's conference room. Your atte~dance or
a representative from your department would be appreciated at this meeting.
Please do not hesitate to call the Planning Department if you have any
questions regarding this meeting.
lj
_.. _ .'_" ,.' _...~__.,~~._. _~_.' ,,_ n.-'~_""_ __ .~- ,_._.~.- ._, - - -
II TICOR TITLE INSURANce
. .
PRELIMINARY REPORT
llO West Taylor Street
San Jose, CA 95110
(408) 292-4212
August 27, 1990
Fred N. Sahadi
1901 South Bascom Avenue Suite 900
Campbell, CA 95008
Attn:
Your Ref: SOUTH BASCOM AVENUE
CAMPBELL, CA
Our No: 0593518 0000
Your No: pruneyard
In response to the above referenced application for a Policy of Title
Insurance, TICOR TITLE INSURANCE COMPANY OF CALIFORNIA hereby reports
that it is prepared to issue, or cause to be issued, as of the date
hereof, a Policy or policies of Title Insurance describing the land and
the estate or interest therein hereinafter set forth, insuring against
loss which may be sustained by reason of any defect, lien or
encumbrance not shown or referred to as an Exception below or not
excluded from coverage pursuant to the printed Schedules, Conditions
and Stipulations of said Policy forms.
The printed Exceptions and Exclusions from the coverage of said Policy
or policies are set forth on the attached cover. Copies of the Policy
forms should be read. They are available from the office which issued
this report.
This report (and any supplements or amendments thereto) is issued
solely for the purpose of facilitating the issuance of a Policy of
Title Insurance and no liability is assumed hereby. If it is desired
that liability be assumed prior to the issuance of a Policy of Title
Insurance, a Binder or Commitment should be requested.
Dated as of August 9, 1990
Mary K. Finley
at 7:30 a.m.
Title Officer
Escrow Officer
The estate or interest in the land hereinafter described or referred to
covered by this Report is a fee.
Title to said estate or interest at the date hereof is vested in:
FRED N. SAHADI and HELEN SAHADI, Husband and Wife, As Community Property
as to Parcels Seventeen and Eighteen;
FRED N. SAHADI,
A Married Man As his separate property, as to an undivided 1/2 interest and
FRED N. SAHADI and HELEN SAHADI,
Husband and Wife As to an undivided 1/2 interest as. to Parcels One, Two,
Three, Four, Five, Six, Seven, Eight, Nine, Ten, Eleven, Twelve,
Thirteen, Fourteen, Fifteen, and Sixteen; and
FRED N. SAHADI, A Married Man as to Parcels Nineteen and Twenty
TlCor Trtle InSUfance Company of California
fIJ TI,COR.TITLe INSURANce
.
APPLICATION NUMBER: 0593518 0000
At the date hereof exceptions to coverage in addition to the printed
Exceptions and Exclusions contained in said Policy Form would be as
follows:
1. A. TAXES FOR THE FISCAL YEAR 1990-91, A LIEN NOT YET PAYABLE.
B. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-004
Taxing Authority : County Tax Collector
Amount to pay on or before: August 3l, 1990 $93l.30
SAID MATTER AFFECTS: A Portion of Parcel Seventeen
C. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-0l0
Taxing Authority : County Tax Collector
Amount to pay on or before: August 3l, 1990 $2,438.06
SAID MATTER AFFECTS: A Portion of Parcel Seventeen
D. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-0ll and 288-04-0ll-71
Taxing Authority : County Tax Collector
Amount to pay on or before: August 31, 1990 $140,534.57
SAID MATTER AFFECTS: Parcel Nine
E. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-0l5
Taxing Authority : County Tax Collector
Amount to pay on or before: August 31, 1990 $64,50l.91
SAID MATTER AFFECTS: Parcel One
-2-
TlCor Title Insure nee Company of California
aD TICOR,TITle INSURANce
I
APPLICATION NUMBER: 0593518 0000
F. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-017
Taxing Authority : County Tax Collector
Amount to pay on or before: August 31, 1990 $43,006.89
SAID MATTER AFFECTS: A Portion of Parcel One
G. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-18
Taxing Authority : County Tax Collector
Amount to pay on or before: August 31, 1990 $148.l7
SAID MATTER AFFECTS: A Portion of Parcel One
H. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-0l9
Taxing Authority : County Tax Collector
Amount to pay on or before: August 31, 1990 $148.l9
SAID MATTER AFFECTS: A Portion of Parcel One
I. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-020
Taxing Authority : County Tax Collector
Amount to pay on or before: August 3l, 1990 $l43.67
SAID MATTER AFFECTS: A Portion of Parcel One
J. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-022
Taxing Authority : County Tax Collector
Amount to pay on or before: August 31, 1990 $75,992.90
SAID MATTER AFFECTS: A Portion of Parcel One
-3-
TlCor Title Insurance Company of California
'" TI,COR ,TITLe INSURANce
APPLICATION NUMBER: 0593518 0000
K. A TAX DEFAULT FOR GENERAL, SPECIAL, SUPPLEMENTAL AND subsequent
delinquencies for the
Fiscal Year : 1989-90
Assessment No. : 288-04-023
Taxing Authority : County Tax Collector
Amount to pay on or before: August 31, 1990 $4,929.24
SAID MATTER AFFECTS: A Portion of Parcel One
L. The lien of supplemental taxes, if any, assessed pursuant to the
provisions of Chapter 3.5, (commencing with Section 75) of the Revenue
and Taxation Code of the State of California.
2. THE FACT THAT THE OWNERSHIP OF SAID LAND does not include any right
of ingress or egress to or from the highway contiguous thereto, said
rights have been condemned by final decree of condemnation, a certified
copy of which was
Recorded
Case no.
April 2, 1958
Official Records
101429
In Book 4043
Page 543
SAID MATTER AFFECTS: Parcels One and Nine
3. COVENANTS, CONDITIONS AND RESTRICTIONS in an instrument
Executed by :
Recorded : March 28, 1969 In Book 848l Page 228
Official Records
4. AN EASEMENT affecting the portion of said land and for the purposes
stated herein, and incidental purposes,
In favor of : Valley Title
For Motor Vehicles Ingress, Egress and Parking,
Pedestrian Ingress and Egress and Utilities and
related purposes
Recorded March 28, 1969 In Book 848l Page 228
Official Records
Affects As follows:
The route of said easement as defined by a location of easements,
recorded January 12, 1971 in Book 9185 Page 218 Official Records, is as
follows:
Parcel 1:
A stri~ of land 10 feet in width, lying 5 feet on each side of the
follow1ng described centerline:
-4-
TlCor Title Insurance Company of California
fIJ TICOR TITLE INSURANCE
. '
APPLICATION NUMBER: 0593518 0000
Beginning at the intersection of the centerlines of Campbell Avenue and
Union Avenue, as shown on the record of survey recorded in Book 244 of
Maps, at Page 42, Santa Clara County Records; thence along the
centerline of Campbell Avenue, East l24.71 feet; thence leaving said
centerline, North 400.00 feet to the true point of beginning; thence
East l28.00 feet; thence North l30.00 feet, for reference purposes
hereinafter called Point "A"; thence continuing North 3l9.00 feet;
thence North 70 deg. 00' 00" West, 130.89 feet to a point in an
Easterly line of said Parcel l.
Also including: Beginning at said Point A; thence South 72 deg. 24'
27" West, 129.03 feet; thence West 5.00 feet.
Excepting therefrom all that portion that lies within said Parcel 2, as
shown in the instrument No. 3591848.
Parcel 2:
A strip of land lO feet in width, lying 5 feet on each side of the
following described centerline:
Beginning at the intersection of the centerlines of Bascom Avenue and
Campbell Avenue, as shown on the record of survey recorded in Book 244
of Maps, at Page 42, Santa Clara County Records; thence along the
centerline of Campbell Avenue, West 402.00 feet; thence leaving said
centerline, North 47.00 feet to the North property line of Campbell
Avenue and being the true point of beginning; thence North l24.00 feet
for reference purposes hereinafter called Point A; thence West 357.00
feet; thence North 476.00 feet, for reference purposes hereinafter
called Point B; thence North 277.47 feet; thence South 89 deg. 52' 00"
East, 582.00 feet, for reference purposes hereinafter called Point C;
thence South 752.l1 feet; thence West 225.00 feet to said Point A.
Also including: Beginning at Point B; thence West 175.00 feet to a
point in an Easterly line of said Parcel l.
Also including: Beginning at Point C; thence North l2.00 feet; thence
East 130.00 feet to a point in the West property line of Bascom Avenue.
Excepting therefrom all that portion that lies within said Parcel 2, as
shown in the Instrument No. 359l848.
Parcel 3:
A strip of land 10 feet in width, lying 5 feet on each side of the
following described centerline:
Beginning at a point in the West property line of Bascom Avenue being
distant South 25.00 feet from the Northeast corner of the Parcel of
-5-
TlCor Title Insurance Company of California
II TI,COR.TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
Land shown on the record of survey recorded in Book 244 of maps, at
Page 42, Santa Clara County Records~ thence North 89 deg. 52' 00" West,
722.00 feet~ thence South 345.00 feet~ thence West 170.00 feet to a
point in an Easterly line of said Parcel l.
Excepting therefrom all that portion that lies within Parcel 2, as
shown in the Instrument No. 359l848.
Parcel 4:
A strip of land lO feet in width, lying 5 feet on each side of the
following described centerline:
Beginning at the Southwest corner of the Parcel of Land shown on the
record of survey recorded in Book 244 of maps, at Page 42, Santa Clara
County Records~ thence along the North property line of Campbell
Avenue, East 582.20 feet~ thence leaving said property line, North 22
deg. 11' 00" West, 111.20 feet; thence North 532.50 feet to the true
point of beginning of this easement; thence West 121.00 feet; thence
South 50 deg. 2l' 54" West, 36.79 feet to a point being the Southeast
corner of Parcel 4 and being the end of this easement.
SAID EASEMENT has been modified by an instrument
Pittsburgh-Des Moines Steel Company, A
pennsylvania Corporation and Fred N. Sahadi and
Helen M. Sahadi, Husband and Wife
: November ll, 1971 In Book 9585 Page 393
Official Records
5. A LEASE, affecting the premises herein stated, for the term and
upon the Terms, Covenants and Conditions in an unrecorded lease
referred to therein between the parties named herein,
Dated December 27, 1968
Lessor : Fred Sahadi and Helen Sahadi
Lessee United Artists Theatre Circuit, Inc.
Recorded : November 3, 1969 In Book 8725 Page 216
Official Records
Affects : A Portion of Said Land
Executed by
Recorded
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
-6-
TlCor Title Insurance Company of California
II TJCOR TITLE INSURANCE
.
APPLICATION NUMBER: 0593518 0000
6. A LEASE, affecting the premises herein stated, for the term and
upon the Terms, Covenants and Conditions in an unrecorded lease
referred to therein between the parties named herein,
Dated : November 4, 1969
Lessor Fred Sahadi
Lessee Bank of America National Trust and Savings
Association, A National Banking Association
Recorded March 2, 1970 In Book 8846 Page 76
Official Records
Affects A Portion of Said Land
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
7. AN EASEMENT affecting the portion of said land and for the purposes
stated herein, and incidental purposes,
In favor of Pacific Gas and Electric Company, A California
Corporation
For Facilities consisting of underground conduits,
etc., and above ground switches, etc.
Recorded May 13, 1970 In Book 8919 Page 205
Official Records
Affects As follows:
The Parcel of Land shown as 27.243 acres on the record of survey Map
filed for record in the Office of the County Recorder of said County of
Santa Clara in Book 244 of maps at Page 42; excepting therefrom the
Parcels of Land conveyed under Parcel 1 and Parcel 2 in the Deed from
Fred N. Sahadi and wife to Valley Title Company by Deed dated March 2,
1969 and recorded in the Office of Santa Clara County Recorder in Book
840l of Official Records at Page 228.
Said facilities shall be installed within the strip of land described
as follows:
A. A strip of land of the uniform width of lO feet extending from the
Northerly boundary line of the City Street known as Campbell Avenue,
Northwesterly, Northerly and Northwesterly to the Northerly boundary
line of said real property, and lying equally on each side of a line
which begins at a point in the Northerly boundary line of said Campbell
Avenue, distant along said Northerly boundary line 582.2 feet Easterly
from the Southwest corner of said real property, and runs thence North
22 deg. 11' West 111.2 feet, thence due North l4.8 feet to a point
hereinafter for convenience called Point A, thence continuing due North
310.2 feet to a point hereinafter for convenience called Point B,
thence continuing due North 100.5 feet to a point hereinafter for
convenience called Point C, thence continuing due North 264.0 feet to a
point hereinafter for convenience called Point 0, thence North 25 deg.
12' West 205 feet, more or less, to a point in the Northerly boundary
-7-
TlCor Title Insurance Company of California
fIJ TI,COR .TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
line of said real property; excepting therefrom that portion lying
within the boundary lines of said Parcel 2.
B. A strip of land of the uniform width of 10 feet extending Easterly
from the Easterly boundary line of the strip of land hereinbefore
described and designated 1, and lying equally on each side of a line
which begins at said Point A and runs thence due East 40.0 feet.
C. A strip of land of the uniform width of lO feet extending from the
Westerly boundary line of the strip of land hereinbefore described and
designated l, Westerly and Northwesterly to a Northerly boundary line
of the Parcel of Land described and designated Parcel 5 in said Deed
dated March 25, 1969 and lying equally on each side of a line which
begins at said Point B and runs thence due West 270.0 feet, thence
North 33 deg. 4l' West 45 feet, more or less, to a point in a Northerly
boundary line of said Parcel 5.
D. A strip of land of the uniform width of lO feet extending Easterly
from the Easterly boundary line of the strip of land hereinbefore
described and designated 1, and lying equally on each side of a line
which begins at said Point C and runs thence due East 128.0 feet.
E. A strip of land of the uniform width of 10 feet extending Easterly
from the Easterly boundary line of the strip of land hereinbefore
described and designated. l, and lying equally on each side of a line
which begins at said Point 0 and runs thence due East 33.0 feet.
F. A strip of land of the uniform width of lO feet lying contiguous to
and Southerly of the Northerly boundary line of said real property and
extending from the Southwesterly boundary line of the strip of land
hereinbefore described and designated 1, Westerly 20 feet, more or
less, to the Easterly boundary line of said Parcel l.
-8-
TlCor Title Insurance Company of California
fIJ ~ICOR TITLE INSURANce
(
. ,
'I '
_,I
L~
l,.D(':~'
'~,' i"
APPLICATION NUMBER: 0593518 0000
8. AN EASEMENT affecting the portion of said land and for the purposes
stated herein, and incidental purposes,
In favor of Pacific Gas and Electric Company, a California
Corporation
For Underground conduits, etc. and aboveground
marker posts, etc.
Recorded May 13, 1970 In Book 8919 Page 205
Official Records
Affects : As follows:
Said facilities shall be installed within the strip of land described
as follows:
A. A strip of land of the uniform width of lO feet lying contiguous to
and Southerly of the Northerly boundary line of said Parcel 1 and
extending from the Easterly boundary line of said Parcel l, Westerly
195.0 feet.
B. A strip of land of the uniform width of lO feet extending
Northwesterly from the Northerly boundary line of the Parcel of Land
described and designated Parcel 5 in said Deed dated March 28, 1969 and
lying equally on each side of a line which begins at a point outside
the boundary lines of said real property, from which the Southeast
corner of said Parcel 1 bears South 51 deg. 12 1/2' East 154.8 feet
distant, and running thence North 33 deg. 41' West 9l.9 feet; thence
due North 68.5 feet.
C. A strip of land of the uniform width of lO feet extending from the
Southeasterly boundary line of said Parcel 2, Northerly to the
Northeasterly boundary line of said Parcel 2, and lying equally on each
side of a line which begins at a point outside the boundary lines of
said real property from which the Southeast corner of said Parcel 1
bears South 56 deg. 59 l/2' West 178.1 feet distant, and running thence
due North 165 feet, more or less, to a point in the Northeasterly
boundary line of said Parcel 2.
First party also grants to Pacific Gas and Electric Company the right
to excavate for, install, replace, maintain, and use for conveying gas
an underground main or pipe lines and suitable service pipes and
connections within the strip of land hereinbefore described and
designated 3.
SAID MATTER AFFECTS: Parcels One and Nine
-9-
TlCor Title Insurance Company of California
fI TICOR.TITLE INSURANce
.
~..~)
.. f'" . .'i: ,t t,
. .~,,":~,,-,_., '...,
,J.\
('-.
APPLICATION NUMBER: 0593518 0000
9. AN EASEMENT affecting the portion of said land and for
stated herein, and incidental purposes,
In favor of : Pacific Gas and Electric Company, A
Corporation
Facilities consisting of underground
etc. and above ground switches, etc.
July 20, 1970 In Book 8991 Page
Official Records
The routes of said
Notice of Location
Book 9099 Page 343
follows:
the purposes
California
conduits,
For
688
Recorded
Affects
facilities as defined by a
recorded October 26, 1970 in
Official Records are as
1. A strip of land of the uniform width of lO feet extending from the
Northerly boundary line of the street known as Campbell Avenue,
Northerly, Easterly, Northerly and Northeasterly to the westerly
boundary line of the street known as Bascom Avenue and lying equally on
each side of a line which begins at a point in the Northerly boundary
line of said Campbell Avenue, distant along said Northerly boundary
line 82.7 feet Easterly from the point of intersection of the Westerly
boundary line of the real property described in said grant dated June
28, 1970 with the Northerly boundary line of said Campbell Avenue and
runs thence North 77.2 feet, thence North 25 deg. 57 1/2' East 63.4
feet; thence North 170.3 feet to a point hereinafter for convenience
called point A, thence East 169.5 feet, thence North 263.0 feet to a
point hereinafter for convenience called point B, thence continuing
North 39.8 feet, thence North 51 deg. 42 1/2' East 155 feet, more or
less, to a point in the Westerly boundary line of said Bascom Avenue.
2. A strip of land of the uniform width of lO feet extending Northerly
and Westerly from the Northerly boundary line of the strip of land
hereinbefore described and designated 1 and lying equally on each side
of a line which begins at said point A and runs thence North 5.8 feet,
thence West 30.0 feet.
3. A strip of land of the uniform width of 10 feet extending Westerly
from the westerly boundary line of the strip of land hereinbefore
described and designated 1 and lying equally on each side of a line
which begins at said point B and runs thence West 165.5 feet.
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
-10-
TICDr Title Insurance Company of California
II TICO~ TITLE INSURANce
.
APPLICATION NUMBER: 0593518 0000
10. A LEASE, affecting the premises herein stated, for the term and
upon the Terms, Covenants and Conditions in an unrecorded lease
referred to therein between the parties named herein,
Dated : October 14, 1970
Lessor Fred Sahadi
Lessee Crocker-Citizens National Bank, A National
Banking Association
Recorded October 30, 1970 In Book 9107 Page 534
Official Records
Affects A portion of Said Land
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
11. A DEED
herein, and
Dated
Amount
Trustor
Instrument No.
OF TRUST to secure an indebtedness of the amount stated
any other obligations secured thereby
January ll, 1971
: $1,925,000.00
Pittsburgh-Des Moines Steel Company, A
pennsylvania Corporation and Towers Finance
Company, A California Corporation
: valley Title Company, A Corporation
: Pittsburgh National Bank, A National Banking
Association
January l2, 1971
Official Records
: 3936880
Recorded
In Book 9185
Page 229
THE BENEFICIAL INTEREST of record under said deed of trust was assigned
To : New York Estate Teachers' Retirement System____
By assignment dated:~uary l8, 1971 -'
Recorded : May lO, 1971 In Book 9323 Page 589
Official Records
AN INSTRUMENT MODIFYING THE TERMS OF SAID DEED OF TRUST as therein
provided
Executed by
Dated
Recorded
Pittsburgh-Des Moines Steel Company, Towers
Finance Company and New York State Teacher's
Retirement System
: None shown
: May 10, 1971
Official Records
In Book 9323
Page 590
SAID MATTER AFFECTS: Parcel Nine
~
k ~~II~
-11-
TICOf Title Insurance Company of California
aD TI,COR .TITLe INSURANce
.
APPLICATION NUMBER: 0593518 0000
l2. A LEASE, affecting the premises herein stated, for the term and
upon the Terms, Covenants and Conditions in an unrecorded lease
referred to therein between the parties named herein,
Dated May 26, 1971
Lessor Pittsburgh-Des Moines Steel Company, A
Pennsylvania Corporation and Fred Sahadi, A
Married Man
Lessee The Pacific Telephone and Telegraph Company,
A Corporation
Recorded May 27, 1971 In Book 9348 Page 31l
Official Records
Affects Portion of Said Land
SAID MATTER AFFECTS: Parcels One and Nine
l3. AN EASEMENT affecting the portion of said land and for the
purposes stated herein, and incidental purposes,
In favor of valley Title Company, A Corporation
For Motor Vehicle Ingress and Egress and Pedestrian
Ingress and Egress
Recorded November 11, 1971 In Book 9585 Page 398
Official Records
Affects The following described Parcel of Land:
Be~inning at the intersection of the center line of Campbell Avenue and
Un~on Avenue, as shown on the record of survey map recorded in Book 244
of Maps, at Page 42, Santa Clara County Records; thence along the
centerline of Campbell Avenue, East 113.43 feet; thence leaving the
said center line, North 35.00 feet to a point on the North property
line of Campbell Avenue, said point being the true point of beginning
of this description; thence North l2.00 feet; thence along a curve
Northerly 22.40 feet from a tangent which bears North 64 deg. 09' 29"
thru a central angle of 64 deg. 09' 29" with a radius of 20.00 feet;
thence North 843.62 feet; thence along a tangent curve to the right,
178.26 feet thru a central angle of 90 deg. 08' 00" with a radius of
l12.00 feet; thence South 89 deg. 52' 00" East 595.54 feet; thence
along a tangent curve to the right, 80.l3 feet thru a central angle of
11 deg. 28' 42" with a radius of 400.00 feet to a point of reverse
curvature; thence along a curve to the left, 80.13 feet thru a central
angle of 11 de~. 28' 42" with a radius of 400.00 feet to a point having
a tangent bear~ng of South 89 deg. 52' 00" East; thence along a tangent
curve to the left, 31.46 feet thru a central angle of 90 deg. 08' 00"
with a radius of 20.00 feet to the Northeast corner of the Parcel shown
on said record of survey; thence South 89 deg. 52' 00" East 17.00 feet
to a point being on the West property line of Bascom Avenue; thence
along said property line, South 107.9l feet; thence"West 17.00 feet;
thence Northerly along a curve to the left, 31.37 feet from a tangent
which bears North thru a central angle of 89 deg. 52' 00" with a radius
-12-
TlCor Title Insurance Company of California
aD 'T.ICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
of 20.00 feet; thence North 89 deg. 52' 00" West 685.05 feet; thence
South 871.47 feet; thence along a tangent curve to the left, 22.40 feet
thru a central angle of 64 deg. 09' 23" with a radius of 20.00 feet;
thence South 12.0G feet to a point on the North property line of
Campbell Avenue; thence along said property line, West 46.56 feet to a
point; thence North 12.00 feet to a point on a curve with a tangent
bearing of North 64 deg. 09' 29" East; thence Northerly along said
curve to the left, 22.40 feet thru a central angle of 64 deg. 09' 29"
with a radius of 20.00 feet; thence North 454.87 feet; thence along a
tangent curve to the left, 4l.3l feet thru a central angle of 118 deg.
20' 34" with a radius of 20.00 feet to a point of reverse curvature;
thence along a curve to the right, 78.16 feet thru a central angle of
36 deg. 4l' 00" with a radius of 79.00 feet to a point of reverse
curvature; thence along a curve to the left, 4l.3l feet thru a central
angle of ll8 deg. 20' 34" with a radius of 20.00 feet; thence South
454.87 feet; thence along a tangent curve to the left, 22.40 feet thru
a central angle of 64 deg. 09' 29" with a radius of 20.00 feet; thence
South 12.00 feet to a point on the Northerly property line of Campbell
Avenue; thence along said property line West 46.56 feet to the true
point of beginning.
Excepting therefrom the property described as follows:
Beginning at the intersection of Campbell Avenue and Union Avenue
center lines, as shown on said record of survey; thence along the
center line of Campbell Avenue, East l48.71 feet; thence leaving the
center line of Campbell Avenue, North 607.00 feet to the true point of
beginning of this exception; thence along a tangent curve to the right,
420.97 feet thru a central angle of 360 deg. 00' 00" with a radius of
67.00 feet to the true point of beginning.
Also excepting therefrom the property described as follows:
Beginning at the intersection of the center lines of Campbell Avenue
and Union Avenue, as shown on said record of survey; thence along the
center line of Campbell Avenue, East 149.71 feet; thence leaving said
center line, North 694.l3 feet to the true point of beginning of this
exception; thence North 2l4.49 feet; thence along a tangent curve to
the right 138.43 feet thru a central of 90 deg. 08' 00' with a radius
of 83.00 feet; thence South 89 deg. 52' 00" East 25.84 feet, thence
along a tangent curve to the right, 31.37 feet thru a central angle of
89 deg. 52' 00" with a radius of 20.00 feet; thence South 282.43 feet;
thence along a tangent curve to the right, 41.31 feet thru a central
angle of 118 deg. 20' 34" with a radius of 20.00 feet to a point of
reverse curvature; thence along a curve to the left, 78.16 feet thru a
central angle of 56 deg. 41' 08" with a radius of 79.00 feet to a point
of reverse curvature; thence along a curve to the right 41.31 feet thru
a central angle of 116 deg. 20' 34" with a radius of 20.00 feet to the
true point of beginning.
-l3-
TlCor Title Insurance Company of California
fIJ T,ICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
Also excepting therefrom the property described as follows:
Beginning at the intersection of the center line of Campbell Avenue and
Union Avenue, as shown on said record of survey; thence along the
center lines of Campbell Avenue, 306.7l feet; thence leaving said
center lines, North 960.47 feet to the true point of beginning of this
exception; thence North 3.95 feet; thence along a tangent curve to the
right, 3l.46 feet thru a central of 90 deg. 08' 00" with a radius of
20.00 feet; thence South 89 deg. 52' 00" East 505.66 feet; thence along
a tangent curve to the right, 37.70 feet thru a central angle of l80
deg. 00' 00" with a radius of l2.00 feet; thence North 89 deg. 52' 00"
West 525.64 feet to the true point of beginning.
SAID MATTER AFFECTS: Parcels One, Seventeen and Eighteen
l4. AN EASEMENT affecting the portion of said land and for the
purposes stated herein, and incidental purposes,
In favor of : County Sanitation District No. 4 of Santa Clara
County, A Public Corporation
For Sanitary Sewers and appurtenances
Recorded August 30, 1972 In Book 9997 Page l48
Official Records
Affects An easement lO feet in width described as
follows:
Beginning at a point in the Westerly property line of Bascom Avenue,
being distant South 25.00 feet from the Northeast corner of the Parcel
of Land shown on the record of Survey recorded in Book 244 of Maps, at
Page 42, Santa Clara County Records; thence North 89 deg 52' 00" West
772.00 feet; thence South 345.00 feet; thence West 26.86 feet to the
true point of beginning; thence West 94.28 feet to the end of this
description.
SAID MATTER AFFECTS: Parcels One, Nine, Seventeen and Eighteen
15. AN EASEMENT affecting the portion of said land and for the
purposes stated herein, and incidental purposes,
In favor of : County Sanitation District No. 4 of Santa Clara
County, A Public Corporation, Santa Clara
County, State of California
: The construction and maintenance of a Sanitary
Sewer
: August 30, 1972
Official Records
: A strip of land 10 feet in width, l~ing 5 feet
on each said of the following descr~bed
centerline:
For
Recorded
In Book 9997
Page 152
Affects
-14-
TlCor Title Insurance Company of California
fIJ -r:ICOR TITLe INSURANce
APPLICATION NUMBER: 0593518 0000
Beginning at a point in the West property line of Bascom Avenue being
distant South 25.00 feet from the Northeast corner of the Parcel of
Land shown on the record of survey recorded in Book 244 of Maps, at
Page 42~ Santa Clara County Records~ thence North 89 deg. 52' 00" West
l22.00 feet; thence South 650.00 feet to the true point of beginning~
thence West 215.00 feet.
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
16. AN EASEMENT affecting the portion of said land and for the
purposes stated herein, and incidental purposes,
In favor of : County Sanitation District No. 4 of Santa Clara
County, A Public Corporation, Santa Clara
County, State of California
For The construction and maintenance of a Sanitary
Sewer
Recorded August 30, 1972 In Book 9997 Page 155
Official Records
Affects A strip of land lO feet in width, lying 5 feet
on each said of the following described
centerline:
Beginning at a point in the West property line of Bascom Avenue being
distant South 25.00 feet from the Northeast corner of the Parcel of
Land shown on the record of survey recorded in Book 244 of Maps, at
Page 42~ Santa Clara County Records~ thence North 89 deg. 52' 00" West
122.00 feet; thence South 390.00 feet to the true point of beginning~
thence West l75.00 feet.
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
17. AN EASEMENT affecting the portion of said land and for the
purposes stated herein, and incidental purposes,
In favor of : County Sanitation District No. 4 of Santa Clara
County, A Public Corporation, Santa Clara
County, State of California
For Sanitary Sewers
Recorded : August 30, 1972 In Book 9997 Page l58
Official Records
Affects : An easement lO feet in width, the center line
described as follows:
Beginning at a point in the West property line of Bascom Avenue being
distant South 25.00 feet from the Northeast corner of the Parcel of
Land shown on the record of survey recorded in Book 244 of maps at Page
42, Santa Clara County Records; thence North 89 deg. 52' 00" West
122.00 feet to a point for reference purposes hereinafter called point
A; thence continuing North 89 deg. 52' 00" West 650.00 feet; thence
-15-
TlCor Tatle Insurance Company of California
"~_..'-'----~.._._~.__.. .~-, -'-"'~""--- .-
IJ T,ICOR TITLe INSURANce
,-..
,',f .~'V
, l!......':
~\
~.};
,,\
, ,
" J,;
""
""-...
'.
APPLICATION NUMBER: 0593518 0000
South 345.00 feet to a point for reference purposes hereinafter called
point Bi thence continuing South 400.00 feeti thence West l65.00 feet.
Also including: Beginning at said point A; thence South 650.00 feet.
Also including: Beginning at said Point Bi thence West 26.86 feet to a
point for reference purposes called point Ci thence continuing West
94.28 feet to a point for reference purposes hereinafter called point
Di thence continuing West 43.86 feet.
Excepting therefrom: That portion that lies between point C and Point
D.
SAID MATTER AFFECTS: Parcels One, Nine, Seventeen and Eighteen
18. AN EASEMENT affecting the portion of said land and for the
purposes stated herein, and incidental purposes,
In favor of : Pacific Gas and Electric Company, A Cali'fornia
Corporation
Underground conduits, pipes, etc., and
aboveground marker posts, etc.
: March 2, 1973 In Book 0262 Page 132
Official Records
A Strip of Land lO feet wide, crossin9 Parcel 2
and a portion of Parcell; also a str~p of land
l8 feet wide
For
Recorded
Affects
SAID MATTER AFFECTS: Parcels One and Nine
of said land and for the
purposes,
Electric Company, A California
19. AN EASEMENT affecting the portion
purposes stated herein, and incidental
In favor of Pacific Gas and
Corporation
To construct, place, inspect,
and remove facilities
March 2, 1973 In Book 262
Official Records
As follows:
maintain, replace
For
Page 133
Recorded
Affects
Located within a strip of land of the uniform width of 10 feet, the
center line of which is delineated by a heavy dashed line and
designated strip A upon the print of second party's drawing No. S3B-696
CH.2, attached hereto and made a part hereof; and a strip of land of
the uniform width of 18 feet, lying 2.5 feet on the Northerly side and
15.5 feet on the Southerly side of a line which is delineated by a
heavy dashed line and designated strip B upon said print of second
party's Drawing No. S3B-696 CH. 2. .
SAID MATTER AFFECTS: Parcels Nineteen and Twenty
-16-
TlCor Title Insurance Company of California
fIIJ T'COR. TITLE INSURANCE
.
APPLICATION NUMBER: 0593518 0000
Instrument No.
OF TRUST to secure an indebtedness of the amount stated
any other obligations secured thereby
: September 25, 1973
$2,800,000.00
piettsburgh-Oes Moines Steel Company, A
pennsylvania Corporation; and Fred N. Sahadi,
A Married Man doing business as The Towers
Venture, A Joint venture; and Helen Sahadi
Serrano Reconveyance Company, A California
Corporation
Home Savings and Loan Association, A California
Corporation
: November 27, 1973
Official Records
4655523
In Book 066l
Page 733
20. A DEED
herein, and
Dated
Amount
Trustor
Trustee
Beneficiary
Recorded
SAID MATTER AFFECTS: Parcel One
21. A DEED
herein, and
Dated
Amount
Trustor
Instrument No.
Return Address
OF TRUST to secure an indebtedness of the amount stated
any other obligations secured thereby
: December 14, 1973
$6,000,000.00
: Fred N. Sahadi and Helen Sahadi, Husband and
Wife
Serrano Reconveyance Company, A California
Corporation
: Home Savings and Loan Association, A California
Corporation
December 27, 1973
Official Records
4675362
P.O. Box 3991, North Hollywood, CA 91609
In Book 0702
Page 661
Trustee
Beneficiary
Recorded
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
22. A LEASE, affecting the premises herein stated, for the term and
upon the Terms, Covenants and Conditions in an unrecorded lease
referred to therein between the parties named herein,
Dated : None shown
Lessor : The towers venture, a joint venture, composed of
Pittsburgh-Des Moines Steel Company, A
pennsylvania Corporation and Fred Sahadi, A
Married Man dealing with his separate property
Lessee : The Pacific Telephone and Telegraph Company,
A Corporation
Recorded Jul~ 15, 1974 In Book 0990 Page 237
Off~cial Records
Affects : Portion of Said Land
-17-
TlCor Title Insurance Company of California
II TICOR TITle INSURANce
APPLICATION NUMBER: 0593518 0000
SAID MATTER AFFECTS: Parcel Nine
23. AN EASEMENT affecting the portion of said land and for the
purposes stated herein, and incidental purposes,
In favor of : The Santa Clara County Transit District
For A buss stop and shelter with provision for
passenger and pedestrian traffic over, upon and
across
Recorded February 5, 1979 In Book E270 Page 215
Official Records
Affects A portion of said land and being more
particularly described as follows:
Parcel A:
(8602l5-3, Southbound Bascom Avenue nearside Campbell Avenue) A portion
of the 27.243 acre parcel shown upon the record of survey map recorded
in Book 244 of Maps at Page 42, records of the recorder of Santa Clara
County, California and being more particularly described as follows:
Beginning at 3/4" iron pipe set in a monument box at the point of
intersection of the monument line of Campbell Avenue with monument line
of Bascom Avenue as the ,intersection is shown upon said Map; thence
along the monument line of Bascom Avenue, North, 369.05 feet; thence at
right angles to the monument line of Bascom Avenue, West, 47.00 feet to
a point on the Easterly boundary of said 27.243 acre parcel and the
true point of beginning of this description; thence along said Easterly
boundary, South 25.00 feet; thence at right angles to said boundary,
West 7.00 feet; thence North, 25.00 feet; thence East, 7.00 feet to the
true point of beginning.
Parcel B: (860215-4, westbound Campbell Avenue, Farside Bascom Avenue)
A portion of that certain 27.243 acre parcel of land shown upon the
record of survey map recorded in Book 244 at Page 42 records of the
Recorder of Santa Clara County, California and more particularly
described as follows:
Beginning at a 3/4" iron pipe in a monument box at the intersection of
the monument line of Campbell Avenue with the monument line of Bascom
Avenue as the intersection is shown on said Map; thence along the
monument line of Campbell Avenue, West, 295.92 feet: thence at right
angles to said monument line, North, 47.00 feet to a point on the
Southerly boundary of the aforesaid 27.243 acre parcel and the true
point of beginning of this description; thence along said Southerly
boundary, West, 30.00 feet; thence at right angles to said boundary
-18-
TlCor Title Insurance Company of California
",~.;;.._.~_.._;.._..~,_......_~__... _.0_
(I T~COR. TITle INSURANce
APPLICATION NUMBER: 0593518 0000
North l2.00 feet; thence East, 30.00 feet; thence South, l2.00 feet to
the true point of beginning.
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
24. Agreement
Instrument No.
Fred N. Sahadi and the City of Campbell, A
Municipal Corporation
Relative to public street improvements
December ll, 1984 In Book Jl04 Page 258
Official Records
8275345
Executed By
For
Recorded
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
25. A DEED
herein
Dated
Amount
Trustor
Trustee
OF TRUST to secure an indebtedness of the amount stated
Instrument No.
Return Address
March 22, 1985
$30,000,000.00
Fred N. Sahadi and Helen Sahadi
Home Federal Savings and Loan Association, A
Federally Chartered Savings and Loan Association
Home Federal Savings and Loan Association, A
Federally Chartered Savings and Loan Association
March 28, 1985 In Book J304 Page l085
Official Records
8364538
625 Broadway, Suite 300 San Diego, California
92101
Beneficiary
Recorded
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
26. A DEED
herein, and
Dated
Amount
Trustor
Instrument No.
OF TRUST to secure an indebtedness of the amount stated
any other obligations secured thereby
: September 19, 1986
$15,000,000.00
Fred N. Sahadi, A Married Man as his separate
property as to an undivided l/2 interest, Fred
N. Sahadi and Helen M. Sahadi, Husband and Wife
as to an undivided 1/2 interest
Equitable Deed Company, A California Corporation
: Security Pacific National Bank, A National
Banking 'Association
: September 26, 1986 In Book J859
Official Records
: 8960122
Page l727
Trustee
Beneficiary
Recorded
SAID MATTER AFFECTS: Parcels One and Nine
-19-
TlCor Title Insurance Company of California
IJ TICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
AN INSTRUMENT MODIFYING THE TERMS OF SAID DEED OF TRUST as therein
provided
Executed by
Dated
Recorded
Fred N. Sahadi, A Married Man as his sole and
separate property, as to an undivided one-half
interest, and Fred N. Sahadi and Helen M.
Sahadi, Husband and Wife, as to an undivided
one-half interest and Equitable Deed Company, A
California Corporation and Security Pacific
National Bank, A National Banking Association
June l, 1988
: August 30, 1988 as Instrument No. 9815243
Official Records
AN INSTRUMENT MODIFYING THE TERMS OF SAID DEED OF TRUST as therein
provided
Executed by
Dated
Recorded
Fred N. Sahadi, A Married Man as his sole and
separate property, as to an undivided one-half
interest, and Fred N. Sahadi and Helen M.
Sahadi, Husband and Wife, as to an undivided
one-half interest and Equitable Deed Company, A
California Corporation and Security Pacific
National Bank, A National Banking Association
September 1, 1988
May 4, 1989
Official Records
In Book K937
Page 1923
27. A DEED
herein, and
Dated
Amount
Trustor
Trustee
Beneficiary
Recorded
OF TRUST to secure an indebtedness of the amount stated
any other obligations secured thereby
: January l4, 1987
$2,400,000.00
Fred N. Sahadi and Helen Sahadi
Home Federal Savings and Loan Association
Home Federal Savings and Loan Association, A
Federally Chartered Savings and Loan Association
January 20, 1987 In Book K006 Page 2228
Official Records
9117667
70l Broadway, San Diego, California 92l0l
Instrument No.
Return Address
SAID MATTER AFFECTS: Parcels One and Nine
-20-
TlCor Title Insurance Company of California
ffJ TJCOR. TITLE INSURANce
APPLICATION NUMBER: 0593518 0000
OF TRUST to secure an indebtedness of the amount stated
any other obligations secured thereby
April 27, 1988
$7,500,000.00
Fred N. Sahadi and Helen Sahadi
Horne Federal Savings and Loan Association, A
Federally Chartered Stock Savings and Loan
Association
Horne Federal Savings and Loan Association, A
Federally Chartered Stock Savings and Loan
Association
May 19, 1988
Official Records
: 9696679
625 Broadway, Suite 935 San Diego, California
92101
9133438
28. A DEED
herein, and
Dated
Amount
Trustor
Trustee
Beneficiary
Recorded
Instrument No.
Return Address
Loan #
In Book K539
Page 2069
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
NOTICE OF DEFAULT
Dated
Executed by
Recorded
29. A CLAIM OF LIEN
By
Amount Claimed
Recorded
Instrument No.
AN ACTION IN THE
Entitled
Case No.
Nature of Action
Affects
under the terms of said deed of trust as follows:
June l3, 1990
: Homefed Bank, Federal Savings Bank
June 14, 1990 In Book L387 Page 326
Official Records
Amfac Electric Supply Company
: $l4,979.26
July 28, 1989 In Book L037
Official Records
10196908
MUNICIPAL COURT
Amfac Electric Supply Company, A Corporation,
Plaintiff, VS. Dial One Wittmers Electric
Company, A Corporation; William Wittmers; Pool,
Patio and Things, Inc., A Corporation; Fread
Sahadi; and Does 1 through 100, inclusive,
Defendants
: DC 89 202643
: Foreclose and enforce a mechanics'
: Said Land
Page 307
Notice of pendency of said action was
Recorded : November 13, 1989 In Book L1b3 Page 161
Official Records
-21-
TlCor Title Insurance Company of California
IJ T:ICOR TITLE INSURANCE
.
APPLICATION NUMBER: 0593518 0000
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
30. A CLAIM OF LIEN
By
Amount Claimed
Recorded
Instrument No.
Conklin Bros of San Jose, Inc.
$7,059.00
December l, 1989 In Book Ll84 Page 598
Official Records
10345879
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
31. A CLAIM OF LIEN
By
Amount Claimed
Recorded
Instrument No.
JA Giacinto & Sons Inc. dba Diamond Glass Co.
$13,368.00
: December 4, 1989 In Book Ll85 Page 1142
Official Records
l0347240
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
AN ACTION IN THE
Entitled
Case No.
Nature of Action
Affects
SUPERIOR COURT,
J. A. Giacinto & Sons, Inc., dba Diamond Glass
CO., Plaintiff. vs. Sahadi Construction Group,
Fred Sahadi, and Does 1 through 25, inclusive,
Defendants
: 698470
: To foreclose and enforce Mechanic's Liens
Parcels Seventeen and Eighteen
Notice of pendency of said action was
Recorded March 7, 1990 In Book L280 Page 791
Official Records
32. A CLAIM OF LIEN
By
Amount Claimed
Recorded
Instrument No.
JA Giacinto & Sons Inc. dba Diamond Glass Co.
$l3,956.00
December 4, 1989 In Book L185 Page 1143
Official Records
l0347241
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
-22-
TlCor Title Insurance Company of California
fill TICOR. TITLE INSURANCE
APPLICATION NUMBER:
AN ACTION IN THE
Entitled
Case No.
Nature of Action
Affects
0593518 0000
SUPERIOR COURT,
J. A. Giacinto & Sons, Inc., dba Diamond Glass
Co., Plaintiff. vs. Sahadai Construction Group,
Fred Sahadi, and Does 1 through 25, inclusive,
Defendants
698470
Foreclose and enforce Mechanic's Liens
Parcels Seventeen and Eighteen
Notice of pendency of said action was
Recorded : March 7, 1990 In Book L280 Page 791
Official Records
33. ANY CLAIMS OF LIEN that may be filed against said land by reason
of improvement thereon
Disclosed By Notice of Non-Responsibility
Recorded December ll, 1989 In Book L193 Page 572
Official Records
Instrument No. l0355l95
34. ANY ESTATE OR INTEREST OF Reid, Kevin w. and Reid, Joyce L. IN THE
LAND DESCRIBED HEREIN AS DISCLOSED BY A FINANCING STATEMENT Filed :
March l3, 1990 In Book L286 Page 51 In the Office of : Santa Clara
,County Recorder Instrument No. : l045l92l
On the date of said filing the Debtor had no record interest in said
land nor has he since acquired any.
SAID MATTER AFFECTS: Parcels Nineteen and Twenty
35. A CLAIM OF LIEN
By
Amount Claimed
Recorded
Instrument No.
Acousta-Lite Suppy Co., Inc.
$9,686.43
April 6, 1990 In Book L313
Official Records
: 10479665
Page 893
SAID MATTER AFFECTS: pruneyard Towers 1901 So. Bascom Av. Campbell,
CA 95008
36. A CLAIM OF LIEN
By
Amount Claimed
Recorded
Instrument No.
: Consolidated Electrical Distributors
$14,l59.64
: May 10, 1990 In Book L351 Page 1052
Official Records
10519175
-23-
TlCor Title Insurance Company of California
(I TICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
SAID MATTER AFFECTS: Parcels Seventeen and Eighteen
37. ANY CLAIMS OF LIEN that may be filed against said land by reason
of improvement thereon
Disclosed By Notice of Non-Responsibility
Recorded July 2, 1990 In Book L405 Page l635
Official Records
Instrument No. 10575225
SAID MATTER AFFECTS: A Portion of the PruneYard Shopping Center
located at l875 South Bascom Avenue, in the City
of Campbell, County of Santa Clara, State of
California, commonly known as Space 2l0.
38. ANY CLAIMS OF LIEN that may be filed against said land by reason
of improvement thereon
Disclosed By :
Recorded
Instrument No.
Notice on Non-Responsibility
July 23, 1990 In Book L426
Official Records
10598744
Page 325
SAID MATTER AFFECTS: A portion of the PruneYard Shopping Center
located at 1875 South Bascom Avenue, in the City
of Campbell, County of Santa Clara, State of
California, commonly known as Space 333.
Instrument No.
Return Address
OF TRUST to secure an indebtedness of the amount stated
any other obligations secured thereby
: August 1, 1990
$210,000.00
Fred Sahadi and Helen Sahadi, Husband and Wife
: Ticor Title Insurance Company of California,
A California Corporation
Harvey Furgatch as Trustee U/D/T 4/26/88
: August 7, 1990 In Book L442 Page 0261
Official Records
: l06l5396
5075 Shoreham Place, Suite 250 San Diego, CA
92122
39. A DEED
herein, and
Dated
Amount
Trustor
Trustee
Beneficiary
Recorded
SAID MATTER AFFECTS: Parcel Nineteen
-24-
TICOf Title Insurance Company of California
-~---, ~"__'~,-,"~_.._.'..__.._._"._." ""'-"' .
5J TICOR TITLE INSURANce
APPLICATION NUMBER: 0593518 0000
Beneficiary
OF TRUST to secure an indebtedness of the amount stated
any other obligations secured thereby
: August l, 1990
$220,000.00
Fred Sahadi and Helen Sahadi, Husband and Wife
Ticor Title Insurance Company of California,
A California Corporation
Larvey Contracting Co. Money Purchase and Profit
Sharing Plan
August 7, 1990
Official Records
l06l5395
5075 Shoreham Place, Suite 250 San Diego, CA
92122
In Book L442
Page 0258
40. A DEED
herein, and
Dated
Amount
Trustor
Trustee
Recorded
Instrument No.
Return Address
SAID MATTER AFFECTS: Parcel Twenty
4l. Water rights, claims or title to water, whether or not the matters
are shown by the public record.
42. rights of parties in possession of said land by reason of
unrecorded leases, if any, kindly forward said leases for our
examination.
43. Any easements not disclosed by those public records which impart
constructive notice and which are not visible and apparent from an
inspection of the surface of said land.
-25-
TlCor Title Insurance Company of California
III TICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
NOTES:
NOTE1: TITLE OF THE VESTEE HEREIN was acquired by deed recorded prior
to six months from the date hereof.
NOTE 2 : Effective March l, 1979, there will be an additional $lO.OO
fee for recording a Deed with a Legal Description other than an entire
lot in a recorded final map. If there are any questions, please call
your Escrow Officer or Title Officer.
NOTE 3 :
CALIFORNIA .. GOOD FUNDS" LAW
Effective January 1, 1990, California Insurance Code Section l2413.l,
(Chapter 598, Statutes of 1989), prohibits a title insurance company,
controlled escrow company, or underwritten title company from
disbursing funds from an escrow or sub-escrow account, (except for
funds deposited by WIRE TRANSFER, ELECTRONIC PAYMENT or CASH) until the
day these funds are made available to the depositor pursuant to Part
229 of Title l2 of the Code of Federal Regulations, (Reg.CC). Items
such as CASHIER'S, CERTIFIED or TELLER'S CHECKS may be available for
disbursement on the business day following the business day of deposit;
however, other forms of deposits may cause extended delays in closing
the escrow or sub-escrow.
TICOR TITLE INSURANCE will not be responsible for accruals of interest
or other charges resulting from compliance with the disbursement
restrictions imposed by State law.
NOTE 4: On or after July 1, 1985, the County Recorder's Office will
charge, in addition to the regular recording charges, an extra $20.00
recording fee, unless a document evidencing a change of ownership is
accompanied by a Preliminary Change of Ownership report. In lieu of
said report, signed by the transferee, the recorder will accept an
affidavit that the transferee is not a resident of California. Title
billings will be adjusted to reflect such additional fees when
applicable.
-26-
TlCor Title Insurance Company of California
fiJ TICOR TITLe INSURANce
APPLICATION NUMBER: 0593518 0000
NOTE 5 : A. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
Assessed valuation
personal property
: 288-04-00l
: 10-041
: $8,262.35
: $8,262.35
of
None
Paid
Paid
SAID MATTER AFFECTS: A Portion of Parcel Seventeen
B. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
Assessed valuation
personal property
288-04-003
lO-04l
$3,353.53
: $3,353.53
of
None
Paid
Paid
SAID MATTER AFFECTS: A Portion of Parcel Seventeen
C. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
288-04-004
10-041
$401. 02
$401.02
Delinquent Penalty $40.l0
Delinquent Penalty $40.l0
+ $10.00 cost
Assessed valuation of
personal property : None
SAID MATTER AFFECTS: A Portion of Parcel Seventeen
D. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
Assessed valuation
personal property
: 288-04-005
: 10-041
: $1,536.78
: $1,536.78
of
None
Paid
Paid
SAID MATTER AFFECTS: A Portion of Parcel Seventeen
-27-
TlCor Title Insurance Company of California
fJ1J TICOR TITLE INSURANce
APPLICATION NUMBER: 0593518 0000
E. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
Assessed valuation
personal property
: 288-04-006
: 10-041
: $2,776.02
: $2,776.02
of
None
Paid
Paid
SAID MATTER AFFECTS: A Portion of Parcel Seventeen
F. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
288-04-010
lO-04l
$l,067.73
$1,067.73
Delinquent Penalty $106.77
Delinquent Penalty $106.77
+ $lO.OO cost
Assessed valuation of
personal property None
SAID MATTER AFFECTS: A. Portion of Parcel Seventeen
G. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY~ FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
288-04-0l1
10-041
$58,005.23
$58,005.23
Delinquent Penalty $5,800.52
Delinquent Penalty $5,800.52
+ $10.00 cost
Assessed valuation of
personal property : None
SAID MATTER AFFECTS: Parcel Nine
-28-
TlCor Trtle Insurance Company of California
", TICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
H. Supplemental taxes for the fiscal year 1989-90 assessed
pursuant to the provisions of Chapter 3.5 (commencing with
Section 75) of the Revenue and Taxation Code of the State
of California.
288-04-011-71
$4,l62.73 Delinquent Penalty $416.27
Delinquent Date: l2-3l-89
$4,162.73 Delinquent Penalty $416.27
Delinquent Date: 04-30-90
+ $lO.OO cost
SAID MATTER AFFECTS: Parcel Nine
Assessors Parcel No.
First Installment
Second Installment
I. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
288-04-0l2
lO-041
$360.50
$360.50
Delinquent Penalty $36.05
Delinquent Penalty $36.05
+ $10.00 cost
Assessed valuation of
personal property None
SAID MATTER AFFECTS: Parcel Nineteen
J. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
: 288-04-014
: 10-041
$1,048.11
$l,048.1l
Delinquent Penalty $104.81
Delinquent Penalty $104.81
+ $lO.OO cost
Assessed valuation of
personal property None
SAID MATTER AFFECTS: Parcel Twenty
-29-
TlCor Title Insurance Company of California
IJ 'rICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
.
K. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
288-04-015
lO-041
$28,529.6l
$28,529.61
Assessed valuation of
personal property None
SAID MATTER AFFECTS: Parcel One
Delinquent Penalty $2,852.96
Delinquent Penalty $2,852.96
+ $10.00 cost
L. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
Assessed valuation
personal property
: 288-04-016
: 10-04l
: $l,702.22
: $l,702.22
of
None
Paid
Paid
SAID MATTER AFFECTS: A Portion of Parcel Seventeen
LL. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
288-04-0l7
lO-041
$19,018.54
: $l9,Ol8.54
Delinquent Penalty $1,901.85
Delinquent Penalty $l,90l.85
+ $10.00 cost
Assessed valuation of
personal property None
SAID MATTER AFFECTS: A Portion of Parcel One
M. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
: 288-04-018
: 10':'04l
: $54.50
: $54.50
Assessed valuation of
personal property : None
TlCor Title Insurance Company of California
Delinquent Penalty $5.45
Delinquent Penalty $5.45
+ $10.00 cost
-30-
", TICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
SAID MATTER AFFECTS: A Portion of Parcel One
N. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
288-04-0l9
lO-041
$54.5l
$54.51
Delinquent Penalty $5.45
Delinquent Penalty $5.45
+ $lO.OO
Assessed valuation of
personal property : None
SAID MATTER AFFECTS: A Portion of Parcel One
O. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
288-04-020
: lO-04l
$52.5l
: $52.51
Delinquent Penalty $5.25
Delinquent Penalty $5.25
$lO.OO cost
Assessed valuation of
personal property : None
SAID MATTER AFFECTS: A Portion of Parcel One
P. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
Assessed valuation
personal property
: 288-04-021
: lO-04l
: $4,961.3l
: $4,961.3l
of
None
Paid
Paid
SAID MATTER AFFECTS: A Portion of Parcel One
-31-
TlCor Title Insurance Company of California
fIB t'COR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
Q. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-l990
Assessment No.
Code No.
First installment
Second installment
288-04-022
lO-04l
$33,614.12
$33,614.12
Delinquent Penalty $3,361.4l
Delinquent Penalty $3,361.41
+ $lO.OO cost
Assessed valuation of
personal property None
SAID MATTER AFFECTS: A Portion of Parcel One
R. GENERAL AND SPECIAL TAXES AND ASSESSMENTS, IF ANY, FOR THE
FISCAL YEAR 1989-1990
Assessment No.
Code No.
First installment
Second installment
: 288-04-023
10-041
$2,l70.02
$2,170.02
Delinquent Penalty $217.00
Delinquent Penalty $217.00
+ $lO.OO cost
Assessed valuation of
personal property None
SAID MATTER AFFECTS: A Portion of Parcel One
IN/cm
-32-
TlCor Title Insurance Company of California
II TICOR TITLE INSURANce
APPLICATION NUMBER: 0593518 0000
SCHEDULE C
The land referred to herein is described as follows:
All that certain real property in the City of Campbell, County of Santa
Clara, State of California, described as follows:
PARCEL ONE
Beginning at the point of intersection of the center line of Campbell
Avenue and Union Avenue, as shown on the Record of Survey Map recorded
in Book 244 of Maps, Page 42, Santa Clara County Records; thence along
the center line of Campbell Avenue, East ll3.43 feet; thence leaving
said center line North 47.00 feet to a point in the North line of
Campbell Avenue, as established by Deed to the City of Campbell dated
January 2l, 1970, recorded January 23, 1970 in Book 8807 of Official
Records, Page 531, and the true point of beginning of this description;
thence from said true point of beginning, along the arc of a curve to
the left from a tangent which bears North 64 deg 09' 29" East, with a
radius of 20.00 feet for an arc distance of 22.40 feet; thence North
3l3.00 feet to the Southeast corner of Parcel 1 as described in the
Deed from Fred N. Sahadi, et ux, to the Towers Finance Company, A
Corporation, dated January 11, 1971, recorded January 12, 1971 in Book
9185 of Official Records, Page 222; thence along the Southerly line
thereof West 328.84 feet to a point in the Easterly line of the
property of the State of California route 5 Freeway as said line was
established by condemnation in the Superior Court of the State of
California in and for the County of Santa Clara, under Action No.
lOl429, a certified copy of the Decree issued thereunder was recorded
April 2, 1958 in Book 4043 of Official Records, Page 543; thence along
said last named line along the arc of a curve to the right from a
tangent which bears South 7 deg lO' 03" West, with a radius of 2800.00
feet, thru a central an9le of 6 deg 53' 43" for an arc distance of
336.97 feet to a point ~n said Northerly line of Campbell Avenue;
thence along said last named line East 379.60 feet to the true point of
beginning.
PARCEL TWO
For the benefit of and appurtenant to said Parcel One, an easement for
motor vehicles Ingress and Egress and pedestrian Ingress and Egress
over and upon the following described parcel of land:
-33-
TlCor Title Insurance Company of California
aD TICOR TITLE INSURANce
APPLICATION NUMBER: 0593518 0000
Beginning at the intersection of the center line of Campbell Avenue and
Union Avenue, as shown on the Record of Survey Map recorded in Book 244
of Maps, at Page 42, Santa Clara County Records; thence along the
center line of Campbell, East ll3.43 feet; thence leaving the said
center line North 35.00 feet to a point on the North property line of
Campbell Avenue, said point being the true point of beginning of this
description; thence North l2.00 feet; thence along a curve Northerly
22.40 feet from a tangent which bears North 64 deg 09' 29" East thru a
central angle of 64 deg 09' 29" with a radius of 20.00 feet; thence
North 843.62 feet; thence along a tangent curve to the right l76.26
feet thru a central angle of 90 deg 08' 00", with a radius of l12.00
feet; thence South 89 deg 52' 00" East 595.54 feet; thence along a
tangent curve to the right, 80.l3 feet thru a central angle of II deg
28' 42" with a radius of 400.00 feet to a point of reverse curvature;
thence along a curve to the left, 80.l3 feet thru a central angle of II
deg 28' 42" with a radius of 400.00 feet to a point having a tangent
bearing of South 89 deg 52' 00" East; thence along a tangent curve to
the left, 3l.64 feet thru a central angle of 90 deg 08' 00" with a
radius of 20.00 feet to the Northeast corner of the parcel shown on
said Record of Survey; thence South 89 deg 52' 00" East 17.00 feet to
a point being on the West property line of Bascom Avenue; thence along
said property line, South l07.9l feet; thence West l7.00 feet; thence
Northerly along a curve to the left, 31.37 feet from a tangent which
bears North thru a central angle of 89 deg 52' 00" with a radius of
20.00 feet; thence North 89 deg 52' 00" West 658.05 feet; thence South
871.47 feet; thence along a tangent to the left, 22.40 feet thru a
central angle of 64 deg 09' 29" with a radius of 20.00 feet; thence
South l2.00 feet to a point on the North property line of Campbell
Avenue; thence along said property line, West 46.56 feet to a point;
thence North 12.00 feet to a point on a curve with a tangent bearing of
North 64 deg 09' 29" East; thence Northerly along said curve to the
left, 22.40 feet thru a central angle of 64 deg 09' 29" with a radius
of 20.00 feet; thence North 454.87 feet; thence along a tangent curve
to the left, 4l.3l feet thru a central angle of ll8 deg 20' 34" with a
radius of 20.00 feet to a point of reverse curvature; thence along a
curve to the right 78.l6 feet thru a central angle of 56 deg 41' 08"
with a radius of 79.00 feet to a point of reverse curvature; thence
along a curve to the left, 41.3l feet thru a central angle of 118 deg
20' 34" with a radius of 20.00 feet; thence South 545.87 feet; thence
along a tangent curve to the left 22.40 feet thru a central angle of 64
deg 09' 29" with a radius of 20.00 feet; thence South 12.00 feet to a
point on the North property line of Campbell Avenue; thence along said
property line, West 46.56 feet to the true point of beginning.
Excepting Therefrom the property described as follo~s:
Beginnin~ at the intersection of Campbell Avenue and Union Avenue
center l~nes, as shown on said Record of Survey; thence along the
-34-
TlCor Title Insurance Company of California
IJ TlooR TITLE INSURANce
APPLICATION NUMBER: 0593518 0000
center line of Campbell Avenue, East l48.7l feet; thence leaving the
center line of Campbell Avenue, North 607.00 feet to the true point of
beginning of this exception; thence along a tangent curve to the right,
420.97 feet thru a central angle of 360 deg 00' 00" with a radius of
67.00 feet to the true point of beginning.
Also Excepting Therefrom the property described as follows:
Beginning at the intersection of the center lines of Campbell Avenue
and Union Avenue, as shown on said Record of Survey; thence along the
center line of Campbell Avenue, East l48.7l feet; thence leaving said
centerline, North 694.13 feet to the true point of beginning of this
exception; thence Nortn 2l4.49 feet; thence along a tangent curve to
the right, l38.43 feet thru a central angle of 90 deg 08' 00" with a
radius of 88.00 feet; thence South 89 deg 52' 00" East 25.84 feet;
thence along a tangent curve to the right, 3l.37 feet thru a central
angle of 89 deg 52' 00" with a radius of 20.00 feet; thence South
282.43 feet; thence along a tangent curve to the right, 41.31 feet thru
a central of ll8 deg 20' 34" with a radius of 20.00 feet to a point of
reverse curvature; thence along a curve to the left, 78.l6 feet thru a
central angle of 56 deg 41' 08" with a radius of 79.00 feet to a point
of reverse curvature; thence along a curve to the right, 4l.3l feet
thru a central angle of 118 deg 20' 34" with a radius of 20.00 feet to
the true point of beginning.
Also Excepting Therefrom the property described as follows:
Beginning at the intersection of the center lines of Campbell Avenue
and Union Avenue, as shown on said Record of Survey; thence along the
center lines of Campbell Avenue, 307.7l feet; thence leaving the said
center lines, North 960.47 feet to the true point of beginning of this
exception; thence North 3.95 feet; thence along a tangent curve to the
right, 3l.46 feet thru a central angle of 90 deg 08' 00" with a radius
of 20.00 feet; thence South 89 deg 52' 00" East 505.66 feet; thence
along a tangent curve to the right, 37.70 feet thru a central angle of
l80 deg 00' 00" with a radius of l2.00 feet; thence North 89 deg 52'
00" West 525.64 feet to the true point of beginning.
PARCEL THREE:
An irrevocable perpetual easement for the benefit of and appurtenant to
said Parcel 1 for motor vehicles parking and related Ingress and
Egress, on, over and to such portions of the lands situated in the City
of Campbell, County of Santa Clara, State of California, as in now or
hereafter used for motor vehicle parking and related Ingress and Egress
by Fred N. Sahadi and Helen M. Sahadi, His Wife, their heirs or their
assigns, and described as follows:
-35-
TlCor Title Insurance Company of California
II TlooR TITle INSURANce
APPLICATION NUMBER: 0593518 0000
Beginning at the intersection of the center lines of Campbell Avenue
and Union Avenue, as shown on the Record of Survey Map recorded in Book
244 of Maps, at Page 42, Santa Clara County Records; thence along the
center line of Campbell Avenue, East l24.7l feet; thence leaving the
center line of Campbell Avenue, North 659.00 feet to the true point of
beginning of this description; thence West 110.00 feet; thence North
l40.00 feet; thence East llO.OO feet; thence South l40.00 feet to the
true point of beginning.
PARCEL FOUR:
An irrevocable perpetual easement for the benefit of and appurtenant to
said Parcel 1 for motor vehicles parking and related Ingress and
Egress, on, over and to such portions of the lands situated in the City
of Campbell, County of Santa Clara, State of California, as are nor or
hereafter used for motor vehicles parking and related Ingress and
Egress by Fred N. Sahadi and Helen M. Sahadi, His Wife, their heirs or
their assigns, and described as follows:
Beginning at the intersection of the center lines of Campbell Avenue
and Union Avenue, as shown on the Record of Survey Map recorded in Book
244 of Maps, at Page 42, Santa Clara County Records; thence along the
center line of Campbell Avenue, East l24.7l feet; thence leaving said
center line North 447.00 feet to the true point of beginning of this
description; thence West 166.00 feet; thence North 64.00 feet; thence
East 56.00 feet; thence North 44.00 feet; thence East llO.OO feet;
thence South l08. '00 feet to the true point of beginning.
PARCEL FIVE:
An irrevocable, perpetual easement for the benefit of and appurtenant
to said Parcel 1 to construct, place, inspect, maintain, operate,
replace and remove facilities consisting of an underground storm drain
together with a right of way thereof and related Ingress and Egress on,
over and to the land situated in the City of Campbell, County of Santa
Clara, State of California, described as follows:
A strip of land 10 feet in width, lying 5 feet on each side of the
following described center line:
Beginning at the intersection of the center lines of Campbell Avenue
and Union Avenue, as shown on the Record of Survey recorded in Book 244
of Maps, at Page 42, Santa Clara County Records; thence along the
center line of Campbell Avenue, East 124.71 feet; thence leaving said
cente,r line, North 400.00 feet to the true point of beginning; thence
East 128.00 feet; thence North 130.00 feet, for reference purposes
hereinafter called Point "A"; thence continuing North 3l9.00 feet;
thence North 70 deg 00' 00" West 130.89 feet to a point in an Easterly
line of said Parcel l;
-36-
TlCor Title Insurance Company of California
III TIC,OR TITLE INSURANce
APPLICATION NUMBER: 0593518 0000
.
Also including: Beginning at said Point "A"; thence South 72 deg 24'
27" West l29.03 feet; thence West 5.00 feet.
Excepting Therefrom all that portion that lies within said Parcel 2.
PARCEL SIX:
An irrevocable, perpetual easement for the benefit of and appurtenant
to said Parcel 1 to construct, place, inspect, maintain, operate,
replace and remove facilities consisting of an underground water main
together with a right of way therefor and related Ingress and Egress
on, over and to the land situated in the City of Campbell, County of
Santa Clara, State of California, and described as follows:
A strip of land 10 feet in width, lying 5 feet on each side of the
following described center line:
Beginning at the intersection of the center lines of Bascom Avenue and
Campbell Avenue, as shown on the Record of Survey recorded in Book 244
of Maps, at Page 42, Santa Clara County Records; thence along the
center line of Campbell Avenue; West 402.00 feet; thence leaving said
center line North 47.00 feet to the North property line of Campbell
Avenue and being the true point of beginning; thence North 124.00 feet,
for reference purposes hereinafter called Point "A"; thence West 357.00
feet; thence North 476.00 feet, for reference purposes hereinafter
called Point "D"; thence North 277.47 feet; thence South 89 deg 52' 00"
East 582.00 feet, for reference purposes hereinafter called Point "C";
thence South 752.ll feet; thence West 225.00 feet to said Point "A".
Also including: Beginning at Point "B"; thence West 175.00 feet to a
point in an Easterly line of said Parcel l.
Excepting Therefrom all that portion that lies within said Parcel 2.
PARCEL SEVEN:
An irrevocable, perpetual easement for the benefit of and appurtenant
to said Parcel 1 to construct, place, inspect, maintain, operate,
replace and remove facilities consisting of an underground sanitary
sewer together with a right of way therefore and related Ingress and
Egress on, over and to the land situated in the City of Campbell,
County of Santa Clara, State of California, and described as follows:
A strip of land, 10 feet in width, lying 5 feet on each side of the
following described center line: .
Beginning at a point in the West property line of Bascom Avenue being
distant South 25.00 feet from the Northeast corner of the Parcel of
-37-
TlCor Title Insurance Company of California
fI1J TICOR TITLE INSURANCE
APPLICATION NUMBER: 0593518 0000
Land shown on the Record of Survey recorded in Book 244 of Maps, at
Page 42, Santa Clara County Records; thence North 89 deg 52' 00" West,
722.00 feet; thence South 345.00 feet; thence West 170.00 feet to a
point in an Easterly line of said Parcell.
Excepting Therefrom all that portion that lies within said Parcel 2.
PARCEL EIGHT:
An irrevocable, perpetual easement for the benefit of and appurtenant
to said parcel 1 to construct, place, inspect, maintain, operate,
replace and remove facilities consisting of an underground gas service
together with a right of way therefore and related Ingress and Egress
over and to the land situated in the City of Campbell, County of Santa
Clara, State of California, and described as follows:
A strip of land lO feet in width, lying 5 feet on each side of the
following described center line:
Beginning at the Southwest corner of the Parcel of Land shown on the
Record of Survey recorded in Book 244 of Maps, at Page 42, Santa Clara
County Records; thence along the North property line of Campbell
Avenue, East 582.20 feet; thence leaving said property line, North 22
deg ll' 06" West, ll1.20 feet; thence North 532.50 feet to the True
Point of Beginning of this easement; thence West 121.00 feet; thence
South 50 deg 21' 54" West, 36.79 feet to a point being the Southeast
corner of Parcel 4 and being the end of this easement.
-38-
TlCor Title Insurance Company of California
,.
...... ..~...:.-
, Iha lend but I. _"1'".,
hall" nOla IUIYf:'J 0",. . 'r'n b'/ lIw ~I..",,_
I.M.. ,,,.-. lillO k;'A ....; ~.I"" .. .
. u .. 1 'I'U,. I" u...-.n.;~ CvillPAny.
....t,;(u.... L,J 1\001 . ... ....
-
~
\b
ROUTE 17
-" I
r
11.
li~
~L- ,
I
~
I:
i'
r
r-
I
.
-0
1>
;70
('"')
~ (11
r
o
Z
(TI
I
~
~
....
--
I
I
...
....
I .
t1
~
I.
- ~I I
~
~ I ~
'",
'I ~ ...
z !
I ~
... ..
.,'
i
.
. ~.. ~.
III =~-"'-.-SOUTH
:: . IIj
.i
'I
~
:/
y
'/
I
I
1IMr.
,
J~
a/~
'III
F
- - BASCOM
/'L.
FREEWAY
I,
~
I
~
~
2:~
.~ A)
~~
r
,
a
,
-~
~:!:!~
o"T\(t\
....-\r-
-mil"
r f'\ 0 (t\
U I tz~
'" <.
rn ~ ~
< r
r-T-I -U ~
\ \ I :t>1:
Z=>:J
~CJ
\Tl \Tl
cnG:=
2:.,. !
!
..
i
!
..ft
~
~
b
I."
e
.
ic
~l":'
.z
.-AVE:--' ~.
A (J)~
\g) CD.
B
-.
.
I
ID~
I
o
0,
_e.
..,.'....,'. "'-
c~~WI":
~~
1h0PrUheYard
"
;
~EC~iVEO
NOV 0 1985
November 6, 1985
Mr. Arthur A. Kee
Planning Director
City of Campbell
70 North First Street
Campbell, CA 95008
Mr. Joseph Elliott
Public Works Director
City of Campbell
70 North First Street
Campbell, CA 95008
Gentlemen:
This will acknowledge receipt of your letter dated November 1, 1985
and its contents. We, of course, have no interest in appealing your
collective decision to the Planning Commission nor would we ever. I
will spend some time considering the concept of intensity within the
next week or two and perhaps get back to you with some suggested
changes.
Thank you for your courtesy and cooperation in considering our
request.
A;;;;;7~t&'
Fred Sahadi
FS:as
Telex No. 346463
1901 S. Bascom Avenue
Suite 900
Campbell, CA 95008
Phone (408) 371-0811
Cable Address "Samar"
.
Traffic . Transportation · Engineering
April 19, 1985
Principals.
Charles E. De Leuw, Jr, PE.
William H. Dietrich, PE
Larry R. Grove, PE
Michael A Kennedy, PE
Hans W Korve, PE.
Richard T Sauve, PE.
DanielT Smith, Jr., PE
Mr. Arthur Kee
Director of Planning
City of Campbell
70 N. First Street
Campbell, CA 95008
Subject: Proposal for Pruneyard Master Plan Traffic Study
A85-0 1 06/53
Dear Mr. Kee:
As you requested, DKS is pleased to submit this proposal for performing a traffic
engineering study in support of the Pruneyard Master Plan Development in Campbell,
California. We understand that the traffic report is to be incorporated into an EIR being
prepared by others. The proposed project consists of the addition of two 400,000 square
foot office towers plus a hotel, all to be located on the existing Pruneyard Shopping
Center site. The new developments are to replace an existing supermarket and a bank.
The total site acreage is to remain the same. The site is located adjacent to an arterial
road network that has suffered heavy congestion during the peak hour for the last 10-15
years. It is also adjacent to a proposed development that is currently undergoing public
hearings. We are proposing the following work scope to address the concerns raised at
the meetings with you JoeElliott, Keith Manley, and Phil Stafford and in the letter dated
March 26th, 1985.
T ask I - Estab I ish Data Base
Review existing documentation within the traffic shed of this project. Collect all
available traffic counts and approved "new" trips (San Jose only) from Campbell,
San Jose and Caltrans. Inventory existing circulation network and review all proposed
improvement plans to the circulation system in the vicinity of the project site, including
proposals for interchange modifications for the Route 17 Freeway. For all
26 intersections shown in Exhibit I obtain available signal timing and phasing. These
intersections were selected by the Campbell and San Jose traffic departments. This list
may need to be expanded if the traffic analysis performed in Task 4 reveals that
additional intersections fall under the 1.5 percent level of service (LOS) and I percent
LOS E rule established by Campbell.
Task 2 - Conduct Traffic Counts and Review Existing Surveys
Review available employee/customer surveys conducted at the Pruneyard to determine
where people are coming from to go to the project site. This data (apparently broken
down by ZIP code) will help to determine the directional distribution of existing and
future traffic and will be used in the trip assignment phase of this study for the project.
1419 Broadway, Suite 700, Oakland, California 94612-2069 . 4151763-2061
Mr. Arthur Kee
City of Campbell
April 19, 1985
Pa-ge 2
Conduct AM and PM peak hour manual turn counts at 9 intersections in Campbell shown
on Exhibit I, to update existing data base. Conduct 24-hour machine counts at the 14
locations shown in Exhibit 2.
Task 3 - Trip Generation
Based on directional distribution information from the 900 Hamilton EIR and from
available survey data from the Pruneyard determine, in concert with the City, the
appropriate trip distribution for the new project traffic. Trip generation rates for the
project are to be based on ITE trip generation rates. These new trips would then be
distributed to the street network per the agreed upon distribution. This step would be
undertaken for Phase I and Phase II of the project. For each of the analysis years we
would estimate background traffic growth. Background traffic consists of two
variables: traffic related to general traffic growth unrelated to any specific project, and
traffic related to approved projects which are anticipated to effect the key intersections
listed in Exhibit I. The former will be estimated wtih an annual growth factor. The
latter will be determined from a list of approved projects that will be supplied by
Campbell and San Jose.
Task 4 - Computer Model
We propose to code the circulation network within the study are using a computer model
called TRACS. The model performs automatic level of service calculations for each
intersection in the network (TRB Circular 212 - Planning Method and City of San Jose
(CSJ) Method). The model runs on IBM PC's. A brochure more fully describing TRACs is
attached as Exhibit 3.
Task 5 - Traffic Impact Analysis
Conduct an AM and PM peak hour traffic impact analysis for the selected analysis years
for the intersections shown in Exhibit I. The capacity analysis wi II be done using both
the Circular 212 method and the City of San Jose method. We would also look at each
arterial as a "system" to analyze traffic impacts. In addition, potential traffic impacts
upon neighborhoods adjacent to the project site would be identified. Specific
neighborhoods to be considered include the area east of Bascom, the area west of
Route 17, and the residential area south of Campbell Avenue along Union Avenue. We
understand that the Council has a policy of discouraging additional traffic along Union
Avenue. The primary focus will be to identify any impacts of potential thru traffic into
residential neighborhoods. The traffic impact analysis on the intersections and arterials
would focus on capacity, basic traffic flow, and impact on signalization.
This analysis may show that additional intersections may need to be included in the
analysis to meet the LOS policy of the City of Campbell. Additional intersections would
be considered an extra and are not included in this fee estimate. The analysis will
examine traffic impacts for the development scenarios listed on Exhibit 4.
Task 6 - Mitigation Measures
Based on results of traffic impact analysis, appropriate mitigation measures will be
developed and tested for each of the traffic analysis years. These measures could
.3Nd NV 10 1~3W
~
O'.f
..Y
Xs
..Y.
~'.y
'<.Q.
Os
.3^'<:J HDI31
$
~31S3HJNIM ~ w
:> :>
c:: c::
Z ..J
0 ..J
I-- w
..J CO
0-
x:
c:: Cl Cl
U W w
I-- I--
UW U..J
WVl W..J
..JO ..JW Vl
W..., wCO Z
VlZ VlO- 0
x: -
VlC:: VlC:: I-- "
Z Vl ZU U CD
0 0 W si
_I.L. _I.L. Vl
1-0 1-0 a:
U U W ~
W>- W>- I- -C
Vll-- Vll- Z I- ..<
c:: - c:: - ~ CD
WU W,U -
I-- I- 0 m ~m
Z>- Z>- ~ -
-CO - CO :J: CD
0 <J ~ >< 1:0
W -I-
~
.3NrJ NV I a 1 );l3W
O'.-r
~
.( s.;)
~'..y
'<'I/,
Os
.3^V H~131
);l31S3HJN1M ~
::>
ex:
z
o
I-
-l
~
ex:
::x::
l.l.J
::>
ex:
-l
-l
l.l.J
a:l
Cl..
~
ex:
u
-
C
g
C\I 0 en
t:: ! .~
m ~-
~ (,) to
... to (,)
~ :t.3
EXHIBIT 3
.. .... ....-
~..;'
associates
Traffic . Transportation . Engineering
Tracs Model
TRACS (TRaffic Analysis Computer Software) is a microcomputer program developed by
DKS Associates for forecasting traffic volumes and evaluating volume-capacity relation-
ships at crucial street intersections. TRACS is particularly useful for identifying,
tracing and evaluating the impacts of numerous alternatives, and has been utilized to
assess the impacts of individual site developments, the cumulative effects of multiple
developments, and the impacts of street and freeway improvements.
TRACS is a highly responsive, human oriented traffic forecasting program designed for
use with today's microcomputers. It has been utilized in practical analytic applications
for over four years. TRACS models are functional in a dozen cities and have been
applied in impact assessments for over 50 projects.
TRACS MODEL OVERVIEW
Unlike conventional traffic forecasting models, TRACS starts with existing base traffic
volumes and allows the user to directly input information on the trip generation, distribu-
tion, and paths of new trips. The TRACS program adds the new traffic to the base.
traffic following the precise instructions of the engineer or planner.
The TRACS program has three basic components: zones, gateways and intersections.
Zones are the location of the proposed new developments. Gateways are the locations on
a cordon around the stvdy ar~ato which trips are destined. Intersections are included in
the program at any location where volume/capacity information is desired.
TRACS uses data on Intersection geometries, existing traffic volumes, traffic generation
for proposed developments, and traffic distribution from each zone to each gateway. .
TRACS assigns the new traffic to each intersection, adds it to the existing volume, and
computes the resultant volume/capacity ratio.
The volume/capacity calculation in TRACS is based on the critical lane technique used in
. TRB Circular 212 "Interim Materials on Highway Capacity". The program considers the;
type of signal phasing (2 phase, 3 phase with left turns, approach phasing) and deter-
mines the combination of opposing movements (left vs. through) which combine to be the
critical approach movements. The volume per lane of each critical movement is divided
by the input lane capacity to determine volume/capacity ratio.
TRACS is easy to set up. The program is currently running on the IBM PC, CDC, and a
68000 based UNIX system. It is written in Standard FORTRAN and can be readily con-
verted to run on computers of almost any size.
FOR MORE INFORMATION
If you are interested in learning more about TRACS or in seeing it in operation, give Rich
Sauve, Steve Lowens or Rick Dowling a call at 415-763-2061. We will be glad to answer
your questions, arrange a demonstration, or provide a written proposal.
1419 Broadway, SUite 700, Oakland, California 94612-2069 . 415 763-2061
_Jr.
associates
Traffic · Transportation . Engineering
ADV ANT AGES OF TRACS
TRACS has many advantages over conventional traffic forecasting models for
applications to area-wide and project level impact analyses.
I. LOW COST
TRACS avoids the cost and time consuming tasks associated with initial
development of conventional traffic forecast models. Some of the
unfortunate attributes of conventional traffic models eliminated by TRACS
include amassing detailed population and employment data, coding and tuning
a computer representation of the street network and "calibrating" a
theoretical reproduction of existing traffic to "verify" the forecasting
capabilities of the model. TRACS avoids these tasks by accepting existing
traffic counts as a base background volume rather than trying to theoretically
"reforecast" existing traffic within the model. TRACS concerns itself only
with forecasting the increments to existinq traffic which result from new
developments or facilities changes.
2. CREDIBILITY
TRACS produces credible and reliable traffic assignments. Outputs of.
conventional traffic models often exhibit awkwardly imbalanced loadings on
parallel streets. These result from imperceptibly small and meaningless
travel time differentials taking on absolute importance in the "all-or-nothing"
logic of other models' path-building algorithms. TRACS avoids this problem
by using rational human logic to define the most reasonable path for each
traffic movement. In fact, in complex situations, TRACS can be encoded to
account for multiple path choices between origin and destination, which
corresponds with actual driver behavior.
3. TRACEABILITY OF IMPACTS
TRACS provides direct traceability between land development (whether a
specific project or general growth in a neighborhood or sub-area of the city or "
county) and the traffic improvement needs it generates. This capability is (.
crucial where a project impacts facilities remote from the project site and is
particularly useful in apportioning responsibility and cost for an improvement
where several developments jointly impact 0 facility. This traceability
feature is also an important attribute of TRACS cases where the user desires
to implement a transportation development fee structure and must
demonstrate the equitability thereof. TRACS enables the government entity
to demonstrate the relationship between the fee and the "services rendered",
tracing the users of improved transportation facilities (i.e., the services
rendered) which provides the basis for validity of the fee under state law.
4. FLEXIBILITY
When new development proposals surface which were not envisioned at the
time of the user's overall forecast, it is simple and cost-effective to execute
a TRACS run to update the forecast. DKS will remain on-call to provide
update runs on the model.
D... .....
" .-.:../-
associates
Traffic . Transportation . Engineering
AN EXAMPLE OF TRACS
OKS Associates has used TRACS to analyze the cumulative and individual traffic impacts
of office buildings, shopping centers, sports stadiums, residential complexes, convention
centers, freeway extensions, new streets, major freeway interchange modifications, and
a freeway teardown. Cities where OKS Associates has TRACS networks already coded
include San Francisco, Oaklond, San Mateo, Anaheim, Sacramento, Hayward, San r-{afael,
Santa Barbara, Napa, Ontario, Rancho Cucamonga, and Walnut Creek.
The following example illustrates the application of TRACS in the Core Area Traffic
Study for the City of Walnut Creek. The study area consisted of the entire two square
mile downtown area of Walnut Creek. The TRACS model was used to estimate the Ail/I
and PM peak hour impacts of individual projects as well as cumulative development. A
total of 38 development zones, and 38 critical intersections were identified in the study
area (see Figure I).
-----I:~ '
_j.i : ~..\\',~-"T
" (:.~n;.< y !. _-->;' ,
, /~~f:.'~~i)~:;-I[;
--~ --.;:j":'-::'~' . \
-"'}b, _--r' ,
I ~ ~2!~
-~ / - - ,.:' .
, ~
.' \
The bose data (turning movement counts)
was obtained from city files and supple-
mented by OKS field counts. Trip
generation rates and development sizes
were input to TRACS to obtain a trip
generation report. The distribution of
trips for each zone was estimated based
on an employee survey performed by
DKS and information from the regional
transportation planning agency. (DKS
Associates also has the capobility to
estimate trip distribution from traffic
counts and other data.) The paths
between each zone and gateway were
identified based on travel time runs
made in the area by OKS Associates.
.0
The TRACS model outputs several tables
showing the base traffic volumes, the
added volumes, the toto I volumes with
development and the level of service.
Figure 2 (on next poge) shows the last of
these tables giving forecasted total
turning movements, volume/capacity
ratios, and level of service. Details of
the capocity calculations for selected
intersections can also be obtained from
TRACS as shown in Figure 3.
b
.2. Associates
Figure 1. DEVELOPMENT ZONES
D.' - .........,.
_ ~....lW
associates
Traffic . Transportation . Engineering
",
[tKS AS~jOCIATLS lBAUGB1 10: 10: 47
WAI_Nur CREEK {:Ofi'( AREA ~; fUllY
CUHUlAl JV( ItEV[l.OF'I'1ENT -. F"M PEA" HOUh .-. WITH itf.:OAllloIAY EXTENSlON
fOTAL VOl UHES ANti VUl UH[/CAf'AC 1 T 1 RAT 10 A' ~;rU[tY Af,(A IN rERSlCllON~;
INHf\SEC1IClN SFRV NOF.:THIIOUNII WESTliOUNIi SOUTHFiOUN[J EAST ~OUN[I
vie LEVEL LErT THfW RIGHT LETT THfW RIGHT LEFT THRU RIGHT LErT THF,U FdGHT
1 ND HAIN ~AN LUI ::, , .6 (A) 308 909 0 0 0 0 0 <3. 270 ,.9 0 76
0 NO MAIN . 1'48680 OF ,7' 'C' 0 871 0 128 0 :'66 0 17~:' 0 0 0 C
3 f'Af.'~ S] TiE + NO MAIN 1. 01 'F' : 40 2027 118 9' 164 733 442 12::'8 '77 676 272 3'
. f'Af.r-.SI [IE + JONES .58 (A; : 164 156 10C 71 757 100 100 103 150 50 749 71
., r'Af\KSJflf + NO CIVI c- 057 'AI : 293 830 0 0 0 0 0 288 251 457 0 326
. NO HAIN . NO CALIF .89 ([l) : 0 1207 120 0 16 0 0 621 593 1228 27 136
f'R1NGi r + NO CAUF ,7B 'C) : 201 1 O~J4 92 152 .0 87 203 9.0 70 144 '09 170
8 F'f..:INGl [ . NO MAIN .56 fA, : 108 1161 0 0 0 0 0 869 _. 1'6 0 :'96
9 'iGNI;U VL . S1I680 ON 1.08 'F) : 0 0 0 ::'017 3rJ 600 0 0 0 JJ 171 132
10 'fGNCU VL . NB680 OF 1. 39 (f, : 160 0 1099 0 2832 0 0 0 0 0 171 0
11 l'GNCQ 'IL + OAI\LAN11 1. 31 'F' : 2::'8 110 :.'6:1 204 :'216 299 ::'30 90 388 51 117~ '"
1:' 'fGNCCl VL . NO CAL IF 1. 24 (f) . ,l,lf: 100::' ~'-:' 1 1 ::'5 1310 M 162 733 811 305 1325 120
13 "(GNUl VL . NO MAIN .97 ([) : 152 1:'6:' 3~J~j 143 835 168 521 SEd 202 126 1410 90
'4 "(GNCCl VI. . NO llfdllol'r " 84 ([I) : 1 bO 418 :'L' 92 1475 120 149 3:"~ 227 214 1858 104
'5 l'GNCO VL . ClVIC fiR ,9' 'E> : 70 618 1078 6:'4 1~] 7 '" 460 3:'0 90 ::'30 ::'069 50
16 ClVIC flF, . NO CALIF ,88 (II) : 70 1 .-'~,1 414 340 103 20 50 951 20 30 75 60
17 CIVIC ilF.: . LOCUST ,41 fA) : 30 201 :!O] 111(, 433 '0 00 16] 00 20 409 '0
1" CIVIC IIR . NO MAIN ,80 (Ii) : 30 4:::'1 23::' 132 4":1' 90 50 490 87 IO'"'! 569 50
19 Cl VI L' [IF.: + NO tlF:[lI<l( ,89 ([I) : 11,0 .68 761 .9. 563 29 10 35~-) '71 BO 7., 70
00 LINCOLN . NO [lfifiWY ,66 ,., : 20 1065 30 40 20 '00 50 77'.-- '0 30 30 .0
::'1 liONf\NZ,\ . NO CAt If " 91 (E " : 75 1232 60 30 96 10 50 879 ::'6:' 493 335 69
-. MT rlIABL . w. 24 ON ,78 ,C> : 60 00 4'70 390 9'8 120 180 '0 10 10 1098 60
23 MT [IIAi-ll . OA"lANfl , 76 (C) : 0 0 0 0 1079 1::'1 14 0 349 '00 104B 0
2.. M' IlIA8L flUNANZA ,67 ,", : 0 0 0 0 860 50 '0 0 364 :"::'6 856 0
_J MT VIAfll . NO CAL If ,87 ([I) : 30"1 990 9'1 124 518 1 ::'3 193 13"! 83 230 616 1.0
06 M1 [IIAIIL . LOCUST .17 (C) : 0 0 0 0 903 111 155 0 152 159 8B' 0
:.'7 M' liIAfl! . NO MAIN ,TS (C) : 160 J~j4 ::'77 119 493 " tHo 37:' B1 192 637 200
:'8 M' TIIAllL + SO ~lf([IWl , 9~ (f;) 193 .19 177 151 326 131 229 831 103 227 6:>3 :'10
29 m'iMf'lC , NO CALIF , S, ([I) : 17,) 611;~ 10 l 19.) 19] 100 70 501 31 S 33' 171 271
30 Nf WE'LL . ~;i1680 OF . '70 (C) : u 0 0 0 3~1 0 734 0 200 0 270 0
31 NU.I[Ll. + N1I680 ON . ,j ~ iA) : 0 0 0 0 351 776 0 0 0 90 1034 0
3: NEIol[LL . NO CALIF " B' ([I) 80 ltO .0 00 526 319 547 00 5:'1 234 590 10
33 HE ~E l_l + SO MAlN " 69 ,.' : 330:.. 208 130 106 370 130 290 69-:' l~O 150 500 ~J31
34 N[W[lL . ~;I] IIFd\WY .83 (II) : '80 6:"9 50 50 390 160 210 696 106 500 800 280
3', l 1l AC . so 11,\JN ,63 '., 75 76] 10 10 10 20 .0 1::-'6", 110 100 20 70
36 CRI\SI11[ . SO MAIN ,60 ,., : 0 576 100 70 0 170 417 983 0 0 0 0
37 RUl!GEAR + 5E1680 ON .9' ,u : 0 0 0 1066 230 0 0 0 0 0 .90 ,.0
38 fW[lGEAR . Nt1e:.8C' OF " 89 (il) : 80 719 80 0 :'50 '::PO 60 0 966 90 480 0
39 [iUMHl' + " 00 'A' : .. 0 0 0 0 0 0 0 0 0 0 63
40 OL YHf'IC . Nll680 .26 fAl : 0 0 0 0 689 0 0 0 0 0 778 0
., Ol. YHF'lC + SEl680 ,76 (A) : 0 0 0 0 689 0 0 0 0 0 778 0
Figure 2. TOTAL VOLUMES REPORT
:;'1
III\S AS~;DCIATES
WAl NUT eREfI<, CORE AREA ~,rutly
CUMULATIVE [1{'.'[LClF'MENf PM F'[,)K HOUf;' \o4tTH FlRuArIWAl' EXfENSION
DI\S ASSOCIA'fES INT[f(~;ECTION CAr'ACITY CALCULATION
LOCATION
f'ARI\SHlf. -t JONE'S
IlIf\E.C1ION
VOLUMES
LEF"T lHfW
f\IGHT
LANES SIGNAL
LE.FT THfW RIGHT Tn'[
f'ARI\SI liE NO~THflOUN[I 164 1:"6 1013
JONES W[~;TW)l!Nl' 71 757 100
F'ARI\SlltE SDUTHflOUNl1 100 103 1 ~jO
JONES [AS rI10UNII 50 749 71
CRITICAL HOVEMENfS
lIIR[CTIUN
Cf,I1ICAL CRn ICAI_
VDLUMl CAF'ACll'( VOL '(.\t-'
F'Mit\SID[ NORTHIlOUN[1 fHHlUGH 264 1500
JON!. ~, W["l !10UNrl LEI , 71 1500
t'AF,~,~, I lit S[JUTHfl(\UNrl LEFT 100 1500
JONE S EASTBOUND THf.:ClIJGH 8:"0 :' f;~! ,)
" 18
.O'"J
,07
, ".:'9
lOSS flUE TO AllVEll SIGNAL r'HAS(S .00
VOLUME / CAF'ACIl Y RAllO ,58
LlVEL or Sl'f::vIC[ .., (A)
Figure 3. DETAILED CAPACITY REPORT
Exhibit 4
DEVELOPMENT SCENARIOS
I.
2.
Existing
Existing and Approved (excluding 900 Hamilton)
3.
Existing and Approved plus 900 Hamilton
Existing and Approved plus 900 Hamilton plus Phase I Project(1)
Existing and Approved plus 900 Hamilton plus Phase II Project( I)
4.
5.
6.
Existing and Approved plus Phase I Project
Existing and Approved plus Phase II Project
7.
8.
9.
10.
Item 4 with mitigation
Item 5 with mitigation
Item 6 with mitigation
I I.
Item 7 with mitigation
(I)
Assumes extension of Campisi Way into Pruneyard.
A85-0 106-2./53
Mr. Arthur Kee
City of Campbell
April 19, 1985
Page 3
include things like additional turn lanes, improved channelization, new traffic signals,
new streets, interchange modifications and a new interchange. Traffic impact analysis
would be conducted of each of tnese mitigation measures to measure their effects on
traffic service.
Task 7 - Parking
We will determine what the parking needs of the project will be, taking into
consideration the types of uses proposed, the possibi lity for shared parking usage due to a
mixture of land uses on the site and the potential effects of TSM measures such as
carpooling. These will be compared to the amount of parking proposed in the
development plan and to the amount of parking required by City Code.
Task 8 - Site Plan Review
We will review the adequacy of the site plan to handle the access and circulation needs
of the master plan proposal. Attention will be focused on the capacity of the access
points, the circulation and capacity needs of the internal roadway system of the project,
the layout of the proposed parking facilities and general circulation and pedestrian flow
pattern. We will identify conflicts between auto and pedestrian flow patterns and the
need for signalization of any of the project access points.
Task 9 - Documentation
The results of the traffic analysis will be documented in a preliminary draft report that
will be submitted to the EIR consultant and to the public works department of the City
for preliminary review. The. report will be prepared in a format such that it can be
included as an appendix in the Draft EIR. We will also prepare the relevant sections on
traffic and transportation in the body of the Draft EIR document. This would be done in
close coordination with the environmental consultant. After receipt of City staff
comments will revise the report to reflect their concerns and resubmit the report to the
EIR consultant.
As requested by Public Works, we will turn over the TRACS model and the runs prepared
for this project to the City together with the internal documentation supporting the
model. We would be available to spend up to 2 days training a staff member on the use '
of the model.
Schedule and Fee
We estimate that it would take approximately two months to collect traffic data and
another six weeks to prepare the draft traffic report. Then it would take about two
weeks to revise the document after the initial City review.
We estimate that a fee of $49,900 would be required to complete this work effort. This
includes attendance at 2 public hearings on the DEIR but does not include attendance at
planning commission or council study sessions, preparation and response to comments on
the draft EIR by the public, nor any additional studies that may have to be done based
upon that review.
Mr. Arthur Kee
City of Campbell
April 19, 1985
Page 4
This fee estimate also assumes that only the intersections shown on Exhibit I are to be
analyzed, that new turn counts are required only for the Campbell intersection and that
the machine counts are confined to the locations shown on Exhibit 2. Furthermore, it is
assumed that the City will conduct the machine count at a minimum of 10 locations and
that the remainder (4) of the counts will be performed by DKS. The fee estimate by task
is shown on Exhibit 5.
We suggest that a contingency of $15,000 be set aside for meetings and response to
comments. The exact fee and scope would be negotiated after all the comments have
been received and reviewed.
The fee estimate also assumes only those intersections shown on Exhibit I will be
analyzed. The fee would be increased by $600 for each additional intersection to be
analyzed, and by $200 if a new turn count is also required. Each additional machine
count by $150.
The fee estimate does not include engineering studies of proposed mitigations such as
additional interchange ramps etc. This analysis will only include sketch as of such
improvements.
We propose to conduct this study on a time and materials basis up to a maximum of
$49,900. We will bill you only for actual hours expended plus expenses at cost plus
10 percent. We will bill you every thirty days per our standard billing rates with payment
due within 30 days of the date of the invoice.
We appreciate this opportunity to be of service to the City of Campbell and look forward
to working with you on this challenging project.
Sincerely,
DKS ASSOCIATES
~~- ~
r~-
-
.
Hans W. Korve
President
HWK:ljb
Attachment (Exhibits)
cc: Linda Peirce - EIP
Exibit 5
BUDGET ESTIMATE
Subtotal
T ask Number Grade Person Hours Rate Sa lory Expense
4 40 $47 $1 ,880
7 4 61 244 $L,496
9 LJ. 93 372
2 I 120 28 3,360
4 60 47 2,B2tJ 6,668
7 8 61 488
Field Crew: 'j Intersections x 2 x $160/lntersection 2,900
8 Machine Counts x $110 080
3 4 40 47 i ,dBu
7 4 61 244 2,124
4 3 80 41 3,220
4 120 47 5,640 9,347
7 8 61 488
Computer: 80 hours x $1 O.OO/hour 800
5 4 50 47 2,350
7 8 61 488 2,838
Computer: 30 hours x $1 O.OO/hour 300
6 3 20 41 820
4 50 47 2,350 4,710
7 10 61 610
9 10 93 930
Computer: 40 hours x $1 O.OO/hour 400
7 4 40 47 1,880
7 4 61 244 2,496
8 4 30 47 1,410
7 5 61 305 2,087 I
9 4 93 372
9 3 16 41 656
4 16 41 656
7 40 61 2,440 9,648
9 4 93 372
C 40 38 1,520
0 40 46 1,840
TRACS FEE I,OOU
iv'lisc. Expenses (Reproduction, travel, etc.) 500
~
Plus 10 percent for handling 678
T ota I Expenses 7,458
Total Salaries 42,415
TOTAL FEE $49,900
AtlS-O 106-2/53
eip
Apri118, 1985
Mr. Art Kee
Director of Planning
City of Campbell
70 North First Street
Campbell, CA 95008
~ [tA~R~~~ ~
CITY OF CAMPBELL
P~NNINI3 DEPARTMENT,
Subject: Pruneyard Master Plan EIR - Proposed Scope of Services and Cost Estimate
Dear Mr. Kee:
We are pleased to present our proposed scope of work for the Pruneyard Master Plan
environmental impact report. In preparing for this submittal we have visited the project
site, discussed the issues with Phil Stafford and yourself, attended a meeting with the
applicant and his architect and reviewed the proposed plan and relevant City documents.
Based on our understanding of the issues we have prepared the following work scope, cost
estimate and schedule.
Seope of Services
ElP will prepare a "focused" Environmental Impact Report in compliance with the
California Environmental. Quality. Act (CEQA), state guidelines and the environmental
review guidelines of the City of Campbell. The report will address environmental effects
in proportion to their severity and probability of occurrence, focusing on specific concerns
identified in the City's Initial Study. The Initial Study, which determines our actual scope
of study and initiates the environmental review process, will be prepared by the City upon
receipt of a formal application by the project sponsor. It is important to note that agency
responses to the Notice of Preparation could require a modification to the scope of
services outlined below.
Our scope of services addresses the proposed Pruneyard Office Complex and Hotel as
depicted on the schematic layout prepared by Maxwell Starkman Associates dated 28
February 1985. The EIR will evaluate a building program which consists of two office
buildings at 400,000 square feet each and a 280,000 square foot hotel.
Based on our current understanding of City concerns the EIR will address the following
key issues:
1. Traffic and Circulation: The work program outlined by DKS Associates (attached)
will be incorporated into the EIR document as a discrete section.
2. AestheticsNisual Quality: The visual quality section of the report will first discuss
the visual character of the existing buildings on the site. The visual character of
surrounding commercial, office and residential uses will also be described and
illustrated with photographs. This discussion will establish a framework for assessing
the visual and aesthetic impacts of the proposed project.
Environmental Impact Planning Corporation
319 Eleventh Street
San Francisco, CA 94103
41 5 864.2311
Offices In Oakland and Sacramento
Environmental Studies
Land Use and Community Planning
Wind Tunnel Analysis
eip
The impact analysis will address the effect of the proposed project on views from
adjacent areas including residential areas to the north, west and south, and motorists
traveling on Highway 17. The visual analysis will also address the visibility of the
proposed 20-story office buildings from more distant areas and their relationship to
the overall scale and pattern of development in the City. The analysis of views will
be illustrated with a photomontage of the project. A photomontge will require the
EIR consultant to photograph a model of the project, if such a model is available. If
a model is not available, we would use a graphically depicted outline of the height
and bulk of the project.
The visual impact analysis will address the size, shape and placement of the proposed
buildings and their impact on the character of existing and proposed adjacent
development. The location and design of plaza and entry areas and proposed building
materials will also be addressed. The analysis will discuss the project's consistency
with any visual quality goals and objectives of the City's General Plan.
Appropriate visual mitigation measures will be developed as a result of the impact
analysis described above. The mitigation section will carefully analyze, as necessary,
. methods to improve the project's visual characteristics and its compatibility with
existing and proposed nearby development. .
3. Land Use and Relationship to Plans: The proposed project represents a significant
intensification of commercial uses on the 34-acre Pruneyard site, which is currently
developed with a shopping ce?ter and two office buildings.
EIP will prepare a detailed description of land uses in the vicinity of the project site
and note the general character of the site itself to provide a setting for the analysis. .
Land use trends in the area will be described and General Plan land use designations,
of the site and adjacent areas will be discussed. The EIR will analyze the'
conformance of the proposed project with all elements of the General Plan and
Zoning Ordinance.
The project is consistent with the land use designation for the site, but a number oft
additional land use policies and zoning districts exist and must be discussed in the
EIR. The land use analysis will include a discussion of the Overlay District and the
City Council's recent policy (1-15-85) limiting development in commercial areas to 6
stories and 75 feet in height. Any conflicts between the project and these planning
policies will be identified and mitigations proposed where possible.
The site analysis will discuss both the internal compatibility of the proposed on-site
uses and the relationship of the proposed uses to adjacent land uses. The phasing of
the project will be discusssed in light of other development proposed for the area.
4.. Jobs/Housing/Relocation: The increased employment opportunities p['esented by the
projects' one million square feet of office and hotel development may have an impact
on the jobs/housing balance in Campbell. The EIR will include a discussion of the
increased demand for housing generated by the additional employment associated
85035
~
<Zip
with the hotel and office development, and the impact of that increased demand upon
Campbell's existing housing supply.
Access to the project site from the north will require condemnation or purchase and
removal of an existing apartment structure. In this event a relocation plan must be
prepared by the applicant and/or the City. The EIR will discuss the relocation plan
and recommend any mitigations necessary to ensure compliance with State
regulations.
5. Community Services; EIP will conduct a baseline analysis of community service
provisions in the project area. Representatives of existing service purveyors will be
contacted to determine capacities and policy considerations as they would be
affected by the proposed development. The adequacy of water supply, sewer and
stormwater systems will be investigated and discussed. The cumulative effects of
development on the existing sewage treatment plant capacity will be assessed. The_
Fire and Police Department have expressed specific concerns regarding impacts on .
the operatons of their respective organizations. These issues will be addressed in the
mitigations discussion in the EIR.
6. Air Quality: The air quality section of the EIR will describe the existing atmospheric'
environment of the project site and address the air quality impacts of construction,
building operation and project-generated traffic. Predicted air quality will be
compared with state and federal air quality standards and any violations will be
noted. Air quality impacts at sensitive receptors will be assessed. The compliance of
the proposed project-with thE! Bay Area Air Quality Plan will be determined.
Microscale carbon monoxide impacts will be calculated by the CALINE3 model of the
California Air Resources Board (CARB), using emission factors from the state's
EMFAC6C computer program. Worst-case meteorological conditions will be',
estimated using the procedures recommended for the Bay Area by the Bay Area Air.
Quality Management District (BAAQMD). Background values will be estimated from .
available data based on BAAQMD procedures. Regional air quality impacts."
principally due to elevated concentrations of ozone, would be evaluated based on a I
subregional analysis of total emissions of hydrocarbons and nitrogen oxides.
Mitigation measures to reduce significant impacts would be recommended. Priority
would be given to these measures recommended in the Bay Area Air Quality Plan and
by CARB and BAAQMD staff.
7. Geology: EIP will work with the City and use existing geotechnical reports and data
to identify known or suspected geotechnical hazards and to establish mitigations
consistent with anticipated levels of risk. Minimum standards for on-site
investigation should lead directly to recommendations of excavatior.. foundation and
construction techniques that would reduce, eliminate or avoid such hazards as
groundshaking, lateral spreading, lurching and settlement (total and differential). It
is EIP's intention to make maximum use of available literature, including General
Plan Elements; previous geotechnical studies; and reports from the U.S. Soil
85035
3
eip
Conservation Service, U.S. Geological Survey, and California Division of Mines and
Geology. No drilling, trenching or similar site-disturbing a<!tivities will be
undertaken.
8. Alternatives: CEQA is designed to ensure that a choice of options on a single site is
examined to permit a fuller understanding of the alternatives for development,
partial development or no development. The alternatives will indicate what options
are available given the constraints of the project site. CEQA specifies a discussion
of an "environmentally superior" alternative land use on the site.
The No-Project Alternative, as required by CEQA, will assess the impact of
maintaining the status quo and will serve as a base for comparison with other
alternatives. EIP will refine an alternative scenario in consultation with City staff.
Alternatives could include a reduced density project with a smaller building mass ir:
keeping with the character of the area, or an alternative site with a maximum.-
building height of 75 feet in keeping with recent City policy decisions, located closer
to the urbanized area.
9. Statutory Sections: EIP staff will prepare the requisite sections required by the
CEQA guidelines, including the summary, growth-inducing impacts evaluation,
unavoidable adverse effects, and cumulative impacts. Of these, perhaps the most
significant is the evaluation of cumulative impacts, which will include the 900 East
Hamilton Avenue project.
Cost
EIP's cost to prepare the Pruneyard Master Plan EIR through the Draft is $18,330. This
cost includes attendance by the project manager at two public hearings, and printing of
the Administrative Draft EIR and Draft EIR. .
Factors that would increase the scope of work and estimated cost outlined in this proposal .
include: attendance at additional public meetings; printing of additional copies of maps Or"
reports; analysis of key issues in addition to those identified in this proposal; changes in,
the project requiring reanalysis or rewriting of report sections; 'and comments on the
Adminsitrative Draft EIR requiring more time than budgeted. We would propose to
renegotiate these items, if required, or charge on a time-and-materials basis.
The following cost estimate is based on our standard hour-Iy rates.
85035
4:
<Zip
A. Administrative Draft EIR
Task
Summary
Project Description
Traffic
Aesthetics
Land Use/Relation to Plans
J obs/Housing/Reloca t ion
Community Services
Air Quality
Geology
Alternatives
Statutory Sections
Graphics
Word Processing
Editing
Production
Project Management
Subtotal Administrative Draft EIR
B. Draft EI R
Prepare Draft EIR
Public Hearings (2)
Subtotal Draft EIR
C. Direct Expenses
Printing
Administrative Draft EIR (5 copies)
Draft EIR (75 copies)
Travel
Expenses
Subtotal Direct Expenses
Subtotal Draft EIR
Hours Cost
8 400
8 400
(see OKS Work Program)
40 2,000
24 1,200
32 1,600
12 -SOO
15 1,050
16 800
24 1,200
10 500
24 960
40 1,600
12 480
8 320
24 1,920
$15,030
1,200
800
$ 2,000
.'
.
50 ..
900
'200
150
$ 1,300
$18,330
D. Final EIR
The Final EIR typically consists of two additional hearings and p!"eparation of a
response to written comments and verbal testimony on the Draft EIR. The 'cost is
often approximately 10-15% of the preceding Draft EIR cost, unless the project is
particularly controver-sial, in which case the Final EIR could add up to 25% of the
Draft cost. Because of the difficulty of accurately estimating Final EIR costs now,
85035
;)
eip
we propose to prepare a detailed work scope and negotiate a Final EIR at the close of
the public review period on the DEIR.
We anticipate three tasks to be required in preparing the Final EIR: (1) attendance at
two public hearings; (2) preparation of responses to comments on the Draft EIR; and
(3) printing the required copies of the Final EIR/Response to Com ments.
Schedule
As shown on the preliminary Environmental Review Schedule, we anticipate that the
Administrative Draft EIR can be submitted to the City of Campbell within eight weeks of
authorization to begin work. We are. prepared to start work on the EIR immediately upon
signing of the contract. We understand that time is of the essence and have developed
this schedule to achieve an optimum balance between timeliness and the need for a
thorough, comprehensive analysis.
We have attached a copy of our standard contract for your review and c.o_nsideration. If
the terms of the contract, our work scope, and cost are satisfactory to the City of
Campbell we will draw up a final contract for signature. Please do not hesitate to
contact us if you have any questions or comments regarding the material discussed above. .
EIP is prepared to begin work on the Pruneyard Master Plan EIR immediately upon the
City's authorization to proceed. We look forward to working with the City to ensure a
timely and successful completion of the EIR.
~y~
Linda Peirce
Principal and Project Manager
85035
6
C.
-l9
UJ
...J
:J
Q
UJ
:I:
U
en
~
UJc:
.... -
>w
UJc
C:::co
...Jo...
<t~
r-CD-
ZCi)CD
UJCO.:O
~ ~ 0.
Z-oE
Olo...CO
coU
c::: >.-
....CDO
;>c>.
Z2--
UJo...U
..,.
N
I I i I
I I : I
I I ; I
I I I I
I I , I
I I I I
I ! I i
I I I I
I I I I
! I i I
! I I i
I I I
'H
I I ,
I i I
I i I
I I !
I i I
! ! !
I I I
I I I
I i I
; ! I
1 I
I I
I I
I I
I !
I I
I' I
i
I I
! I
i
! i
I I
I I
I I
I I
I .
, I
Ll
! ;
, I
I i
I ;
, I
I I
I .
, I
I i
. I
I I
I !
I i
" !
i
a:
w
o
<
-
o
?;
0)
>
0)
a:
>-
...
o
.
N
...
c:
~
0-
"0
C:a:
CO_
O)W
(J)...
>-
(1) ~
a:O
.
M
I I I
I I I
I I I
I ! I
!, ! I
!
i I I
, I, I
ii,
I ! I
I I I
i I !
i ! I
I : I
i I I
i i I
i
(J)-
- >-<
,0 CO 0
?;"Ow
(1)L()O
._~ >-
>-.0
~a:"O
C,) w ~
.o~~
~~cr
O-O~
.
Il::t
! , I I I I
I I ~i II,
I I. I ! I I
, I
! I ~ II
I I j I I I
! I *' I I
I I I I I I
!! ~ I I
I' I' i ! I I',
i !
I I ! I I I
i I I I I I
I i I I I I
I - I I I I i
i i I I I I
i : I I I '1
I i I I I I
, ! I I i
i \, I I
i I I I I i
I ! I I I I
I : I I I I
i I I I I 'I
I ! I Iii
I : I I I I
i ! I I I 'I
o
"'a:
~w
c:
o CO
c..C:
(J) -
0)-
a:2
c:
0) Q)
rn E
c..E
~o
0-0
CJ)
0'>
c:
~
CO
(1)
I
C,)
.0
~
0-
t"'l
N
N
N
-
N
C
N
~
,..
=
-
"
,..
I:l
,..
U'l
,..
..,.
,..
M
,..
I
I
I
I
I
i--+-
= I
"-r
I:l' "
I
----"-
~ I
M -.-..
I
N ----'-
I
----"-
,.. I
,--;..
N
-
,..
-
=
,..
~
U'l
II')
~
~
~
~
0)
>
...
CO
~
...
(J)
c:
E
"0
<a:
0)-
~UJ
CO...
c..-
(1) CO
~ ~
0-0
.
1t)
.
c.o
fJ'j
~
fJ'j
4(
~
.
,....
CONSULTING AGREEMENT
THIS CONSULTING AGREEMENT is made and entered into this day of
, 1985, by arid between EIP Associates, a California corporation,
located at 319 Eleventh Street, San Francisco, California ("Consultant"), and the City of
Campbell, located at 70 North First Street, Campbell, California 95008 ("Client);
WITNESSETH THAT; in consideration of the premises and covenants hereinafter
set forth, the parties agree as follows:
1. Consulting- Services. (a) Consultant agrees, during the term of this
Agreement, to perform the consulting services set forth in Exhibit A relating to the
preparation of an Environmental Impact Report ("Report") with respect to Pruneyard
Master Plan ("Project").
(b) In addition to the services described in Subparagraph (a) above, the
parties may from time to time agree in writing during the term of this Agreement that
Consultant shall perform additional services in connection with the Report or the Project.
Such additional services may include, but are not limited to (i) changes in the services set
forth in Exhibit A because of design changes in the Project; (ii) preparation of special
detailed graphics; (Hi) research and analysis in addition to the requirements therefor set
forth in Exhibit A; (iv) a,dditio~al studies or modifications of existing documents because
of changes in any laws, rules, regulations or policies of any state, federal or local
governmental authority having jurisdiction over the Project; and (v) attendance by
Consultant at more than 2 public hearings concerning the Draft Report.
(c) Nothing in this Agreement shall operate or be construed to preclude or
inhibit Consultant from rendering similar services to any other person or entity.
,
Consultant shall be obligated to devote only so much of its attention, skill and effort as
may be reasonably required to perform the services described herein in a professional and
timely manner.
2. Duties of Client. In order to permit Consultant to render the services
required hereunder, Client shall, at its expense and in a timely manner, (i) provide such
information concerning the Project as Consultant may require from time to time to
enable Consultant to formulate a description of the Project for purposes of Consultant's
~tudy and evaluation of the Project's environmental effects; (ij) assist Consultant in the
development of a description of an alternative to the Project; (iii) assist Consultant in
Page 1 of 5 Pages
EIP Form # 10 lA
the coordination and exchange of such planning and design information relating to the
Project as Consultant may require from time to time; (iv) promptly inform Consultant of
any pending or confirmed changes in the design of the Project; (v) prpmptly review any
and all documents and materials submitted to Client by Consultant for Client's comment
in an effort to avoid unreasonable delays in the progress of Consultant's services; and (vi)
promptly notify Consultant of any fault or defect in the Project in any way relating to the
performance of Consultant's services hereunder.
3. Personnel. (a) Consultant agrees that it will employ, at its own expense,
all personnel reasonably necessary in its discretion to perform the services required by
this Agreement and in no event shall such personnel be the employees of Client. All of
the services required hereunder shall be performed by Consultant or under its direction
and all personnel engaged therein shall be fully qualified under applicable state, federal
and local law to undertake the work performed by them.
(b) In addition to personnel employed directly by Consultant, Consultant
shall have the right to engage such subcontractors as it may deem necessary to the
performance of its services hereunder with the prior approval of Client, which approval
shall not be unreasonably withheld.
4. Compensation. Client shall pay to Consultant an amount not to exceed the
sum of $18,330 as consideration for the performance of the services through the
publication of the Draft EIR se't forth in Exhibit A. Such compensation shall be payable in
the following manner:
(i) A work retainer of $2,000 shall be paid to Consultant at the time'
Consultant commences the performance of services hereunder. Such work retainer shall
be applied against the monthly statements described in Subparagraph (ii) below until
exhausted.
(ii) Client shall pay within thirty (30) days of receipt the amount set forth
in monthly statements submitted to Client by Consultant describing in reasonable and
understandable detail the services rendered, and fees charged and expenses incurred by
Consultant during the previous month in accordance with the billing standards set forth in
Exhibit B, including fees and expenses for additional services authorized by Subpara-
graph (b) of Section 1 above.
(iii) Upon Client's failure to pay within thirty (30) days of receipt the full
amount set forth in any monthly statement submitted to Client by Consultant, said unpaid
balance will bear interest at the rate of one (1) percent per month until the amount of
said unpaid balance plus interest thereon shall be paid in full. If, for any reason
Page 2 of 5 Pages
EIP Form #101..\
whatsoever, the payment of any sums by Client pursuant to the terms of this Agreement
will result in the payment of interest which would exceed the amount which Consultan.t
may legally charge Client under the laws of the State of California, the amount by which
payment exceeds the lawful interest rate shall be automatically deducted from said
unpaid balance or otherwise credited to Client's account, so that in no event shall Client
be obligated under the terms of this Agreement to pay any interest which would exceed
the maximum lawful rate.
(iii) Consultant shall, at its sole discretion, have the right to suspend work
on the services performed hereunder, if Client has any monthly statements as described in
subparagraph (i) above more than 60 days past due. Consultant shall recommence work
upon payment of all statements then past due.
5. Time of Performance. Consultant shall commence the performance of its
services under this Agreement forthwith as of the date of execution thereof, and shall
diligently proceed therewith in accordance with the schedule set forth in Exhibit C,
subject to delays for causes beyond the reasonable control of Consultant or occasioned by
changes in the design of the Project or the failure of Client to perform its obligations
hereunder in a timely fashion.
6. Ter'm. (a) The term of this Agreement shall commence as of the date first-
above written and shall continue until the earliest to occur of the following:
(i) the date on which Consultant notifies Client in writing that it has
completed all of the services required hereunder; or
(ii) five (5) working days after written notice by either party of
substantial failure by the other party to fulfill its obligations under this Agreement in a '
timely manner through no fault of the terminating party.
(b) If this Agreement is terminated prior to the completion of Consul-
t
tant's work, in addition to any other rights and remedies provided by law or under this
Agreement, Consultant shall be entitled to compensation for all services performed and
costs incurred hereunder through and including the date of termination.
7. Ownership of Docu ments. Consultant agrees to return to Client upon
termination of this Agreement all documents, drawings, photographs and other written or
graphic material, however produced, received from Client and used by Consultant in the
performance of its services hereunder. All work papers, drawings, internal memoranda of
any kind, photographs and any written or graphic material, however produced, prepared by
Consultant in connection with its performance of services hereunder shall be, and shall
Page 3 of 5 Pages
ElP Form # 10 lA
remain after termination of this Agreement. the property of Consultant and may be used
by Consultant for any purpose whatsoever.
8. Independent Judg-ment. Client understands and acknowledges that the
preparation and presentation of the Report may invite criticism, controversy and
litigation which may be motivated by public or private opposition to the Project although
based on the adequacy or accuracy of the Report. Client agrees that any such criticism,
controversy or litigation with respect to the Report will not cause Client to withhold
payments due to Consultant hereunder o.r be the basis for any suit, action, request for
indemnification or other claim by Client against Consultant. Client further agrees that
the failure of Client or any governmental agency or third person to"'agree with the Report
or the findings, conclusions or recommendations contained therein shall not be construed
as a failure on the part of Consultant to perform its obligations under this Agreement.
9. Litig-ation. In the event that either party brings an action under this
Agreement for the breach or enforcement thereof, the prevailing party in such action
shall be entitled to its reasonable attorneys' fees and costs whether or not such action is
prosecuted to judgment.
10. Notices. Any notice or demand desired or required to be given hereunder
shall be in writing and deemed given when personally delivered or deposited in the mail,
postage prepaid, sent certified or registered, and addressed to the parties as set forth
above or to such other address as either party shall have previously designated by such a
notice. Any notice so delivered personally shall be deemed to be received on the date of
delivery and any notice so mailed shall be deemed to be received five (5) days after the
date on which it was mailed.
11. Waivers. Waiver of any breach or default hereunder shall not constitute a
continuing waiver or a ~aiver of any subsequent breach either of the same or of another'
provision of this Agreement.
12. Modification. No waiver, alteration, modification or termination of this
Agreement shall be valid unless made in writing.
13. Assig-nment. Neither party shall assign, transfer or otherwise dispose of
this Agreement in whole or in part to any individual, firm or corporation without the prior
written consent of the other party. Subject to the provisions of the preceding sentence,
this Agreement shall be binding upon, and inure to the benefit of, the respective
~uccessors and assigns of the parties hereto.
14. Governing- Law. This Agreement shall be governed by and construed in
accordance with the laws of the State of California.
Page 4 of 5 Pages
EIP Form #101A
15. Counterparts. This Agreement may be executed in one or more counter-
parts, each of which shall be deemed to be an original, but all of which together shall
constitute but one and the same instrument.
16. Further Assurances. The parties agree to have executed any and all
documents and take any and all actions which may be necessary or advisable to effectuate
the purposes of this Agreement.
l7. Captions. The headings or captions to the sections of this Agreement are
not a part of this Agreement and shall have no effect upon the construction or
interpretation of any part thereof.
18. Severability. If any term, covenant or condition of this Agreement is held
by a court of competent jurisdiction to be invalid, the remainder of this Agreement shall
remain in effect.
19. Entire Agreement. This Agreement sets forth the entire understanding
between the parties as to the subject matter of this Agreement and merges all prior
discussions, negotiations, letters of understanding or other promises, whether oral or in
writing.
IN WITNESS WHEREOF, the parties have executed this Agreement the day and
year first-above written.
"Consultant"
"Client"
EIP Associates,
a California corporation
City of Campbell
By
John Davis
Principal
By
Page 5 of 5 Pages
EIP Form #101A
r
CITY OF CAMPBEll
70 NORTH FIRST STREET
CAMPBELL, CALIFORNIA 95008
(408) 866-2100
Department: Pl anni ng
March 26, 1985
Mr. Kenneth Reaves
Director of Urban Design
Maxwell Starkman Associates
9420 Wilshire Boulevard
Beverly Hills, CA 90212
-
RE: Areas of Potential Environmental Impact.
Pruneyard Redevelopment
Dear Mr. Reaves:
The purpose of this letter is to outline for you some of the areas of potential
environmental impact that may result from a redevelopment of the Pruneyard
Shopping Center. The comments discussed in this letter are in response to your
letter to Mr. Arthur Kee dated February 28, 1985, and to a schematic layout
for the Pruneyard site which was prepared by your office on the same date.
As envisioned at this time, the site redevelopment will consist of two new
20 story office towers each having a gross floor area of 400,000 square feet,
a 350 room hotel building that will be 12 stories high, and related parking
facilities. As indicated in the schematic layout, the existing 18 story and
10 story office towers will be retained and the existing shopping center area
will be modified to accommodate the new structures.
The schematic layout for the site has been referred to the various City Depart-
ments that will review and comment on the plans once an application is filed.
Preliminary comments from the Police and Fire Department are attached. The
preliminary environmental concerns of the Planning and Public Works Depart-
ments are outlined for you as follows:
I. TRAFFIC - complete analysis of the impact of the projected increased traffic
volumes and movements as a result of the proposed development on the public
streets and highways system, including:
A. An analysis of all intersections affected by this project that currently
operate at a Level of Service 0 that will have a degradation in the
level of service of 1.5% or more.
B. An analysis of all intersections affected by this project that currently
operate at a Level of Service E that will have a degradation in the
level of service of 1.0% or more.
CITY OF CAMPBEll
Mr. Kenneth Reaves
Page 2
March 26, 1985
Copies of the complete and unabridged traffic engineer's report must be made
available to the Public Works Department prior to or at the same time the
Draft EIR is submitted to the City.
II Aesthetics - an analysis of the aesthetics and visual impact of the develop-
ment on the surrounding area.
III. Jobs/Housing - an analysis of the proposed project's impact on the Jobs/
Housing Balance in Campbell.
IV. Infrastructure - an analysis of the proposed project's impact on storm and
sanitary sewer systems, water supply system, and utilities.
V. Geology - an analysis of the proposed project's ability to withstand
geologic hazards such as earthquakes.
VI. Air _ an analysis of the proposed project's impact on the quality of air.
VII. Relocation - an analysis of the impact of the proposed project on the
existing apartment complex to the north of the project site (Aloha Apart-
ments) .
The foregoing main areas of concern, including those raised by the Police and
Fire Departments,are intended to serve as an approximation of the scope of work
that will be required for inclusion in a project of the nature being proposed.
It should be noted, however, that no specific site plans, elevations, or an
application have been filed with the City for this project as of this date. With
this in mind it is quite possible that additional areas of concern or expansion
of some of the areas already outlined may be necessary once the application
is filed. The guide used by the City of Campbell in assessing a project's
environmental impact is identical to the one generated by the State of California
in the CEQA Guidelines.
If there are any questions regarding the information contained in this letter,
please feel free to call.
Very truly yours,
Arthur A. Kee
Planning Director
~~
Principal Planner
PS:dc
Enclosure
~ - - --; ....... -- '-
-iJL~
r_~_~_Q_B_~_~_~_~_~
P:l ~ 1
Stai"i",='r.j,
P:"ann.ln'~1
De ,?31' t)1I '~;I t.
,]5) ~ ~
U\\ .,. l'
I '
r;::I' ~ Ii" r ~~
~ U 'u l:,
: ; 'I'
! I )
~;
F:- - '.
!"~_I~~..5:f~' Y.::':'.iLld, F.:re :-}F~;J~rtJT:t::-Lt
~
CITY c;:- CAr\';~"'"):':=L~
FLAr..:/,!!",:: D=PA"I~.:=r.JT.
F<~ :
CQK~IT:Q~S OF APPROVA~
PRopelSE::; PR:_~ NE\' P.. F:I.; I'-)PC.' .JEI:":"'
1'3()1 :::.. BASCOM A\lENi.1E
Th@ F~1'e Dep8rtment. has the following concerns regard.lng the proposed
new h.lgh-r.lse proJect at the Pruneyard.
1. The Fir~ Department strongly feels that retrofitting a sprinltle1'
eye,":..e,', lnto the e/:.is":..ing high-risE buildings should be a ccnolt,:r,
o~ approval for add.lt.lonal build.lngs.
These exist.ing
uns?rin~lered h.lg~-ri~e bUildin?s represent one of the grea~esc
p0te~tia: f~r~ hazHrds 1n the C.lty of Campbell.
Recent.
P:':p.='l".lf?nCe has shown that no Flre Department can adequately
heL.-::e 0. i'lrE? l.n an unspr.lnklered hlgh-risE? build.lng.
Before add~ng additional high-rise buildings. which would grea~ly
ir"p,:':!ct tho::- k;p]'vi CE:- demo.nd~, on OUl dep8rtment. we feel that 1.;.,=,
,""J eve': c);-' .:~ ~
stloul.j red~c~\ the f~re
ha~ard ~m?act o{ the
8~...:.J. ~:"t_
}-, "
.;....' I
! '
~(~:r.=:::. t,y r':"c'./_C.::..rJ9 a'~~c.i:'5."T.ic E.;>l.ln::._01 E,y[:.:.(-:-r;I_~',.
1\ e,~'
:E-.:-l-!Y-!'::l:~:"~~:' :i~1 1 if?hty..'t:J..C!~'~ r.l.-~-;:."':.i.:' :-,i~'f:': a.n,d -fast respc1nse
r-r:r_ll:'.2c!' hC9':::O: )-,.:::.s, n..:':'.::€:- "",u'-" rf,.t.rof"t,_.;.ns: possibll? at ace,:.,' ,-,-+
6"
- :': _!.. ~;~ ~":.~: './ S~~. ::-i: 'r-..,:...... .s~ua.:~e f(~":lt.
On,= e>:,=PI~.le of such a
.i: '.. .:~, -~.~ 1 ,~~{ ~~. ~- t: t:-'- ~ e:;:- :r i c\':_ t '_, ;~! r iJ Cl:r a"L- .::.. CJ r), ~'h i C"::-J 1 c.~ C U l' r E:' n ~_ 1 \/
r~-'~I-':'=-~:"":'...l"n'~~ all o:t th*..?2..1- r.l~9t!-l:-i!3-~ h,:l"t_e:s Wlt.tl .:SU--:'ClTi'a"':..:i.c'
':=~'l .' 1: ink j e 1 E:I YoSt. E:.: In [". .
Acc,=:~s to a1: side[~ of hiS:-'-.l'.lS(:;> t.u,:ldlTJ'?G with minimum t'..J~1;',"
:l,,:,t_ acc,~s~ Cil ive.....aYE i= required foy e::f>2ctive -firefightlr,'J.
t~..:.~ re':'!'3.1":':. y".t2 ha\/.:..: 6 C:"C';J(~.'-:'..::~+n \.o..'Jtli a.,=,~.':::~,:':': te' th-2 w~st S.if':f:~ ,~,(
-: :-:c Lc-,!-thcl n [,11;-i i ce towP1.
Ar~C'f:;'f-.8. to a2.} c.trJt?l- r)L.:11~ir.sE:.'. a;:1~'~::1~
<- ..
- 1..'
be .:3.::::':?::1....l.:=-:.f..:-.
3 WE ~ill requir-e the developer to provide storage cat.inets on
floors 5, 10, and 15 of all buildings to store Fire Department
equipment use~ in emergency situations.
We would also requlre
the developer to provide su-f-ficient funds to our Department to
purchase equipment such as hose. tools. no=zles. and breathing
a~~aratus cylinders, in a euffic1ent quantity to stock these
e~ergency cat.inets.
4. We will require that ~i!e Department connections -for sprinkler
and standpipe systems be located at least 300 feet -frem h19h-l~S~
bUlldings to reduce the danger to firefighters -from falling
g..!.a.:.:",E. .
Other than the above cond1tions. we ant1cipate that the buildings
will be constructed in full compliance with Title 19 and Title 24
r-::..':r"':lre~I(?7"1"t..:..s Ii.:.r rli?:-l-rist:; b-uilclinSL''':,.
;"",
!eql~j~~ elJtoma4jc spl"inJ{ler systerre
in a~l
aYe8,~'::' e,f' t~~E:
r:.: \,'
L"..i.:'::_-';;2. ';'fl'-:',Jd:..n'~l f'~l'kln9 garasc..'C', and any par;';ing areas un.j~:::.
:--'u - ~::: ~ r 1:1~'.
C~~ ~ . _ E: ..; ~ (:"!,,,: \ j 1 1.~ L
v...'-:-' /:: '....'?y c- -
U"\o-' '--"- / 'V ~
~
~
CITY OF CAMPBELL
MEMORANDUM
From:
Arthur Kee
Planning Director
Donald R. Burr
Chief of Police
Date:
March 18, 1985
To:
Subject:
CITy r, '_
....~ C
PLA..!::J~' 4.'.._,
-------------------------------------------- Ik~nfp~~~~--
AF.:, "~:::l\il
POTENTIAL PROBLEMS AT PRUNEYARD
!p] [f ([g c I'"? i ;-;
~L0
We have reviewed the available information on the proposed changes at
the Pruneyard. The following is a list of the potential problems as
we see them.
1. Securi ty in the garages
2. Security connected with the Hotel
3. Traffic
4. Dens i ty
5. Parking availabi 1 ity
~~ A1~~
Donald R. Burr, lef of Police
/hr
.().
MAXWELL STARKMAN ASSOCIATES Architecture. Planmng . Urban Design
9420 Wilshire Boulevard. Beverly Hills, California 90212. (2131278.6400
:J""
:\.\
, {,' .
I, ;:
:U:
L_..J
February 28, 1985
CITY D F CJ-\.lvd.... U i::LL.
~LANNING. DI::P.ARTMENT:
Mr. Arthur Kee
Planning Director
City Planning Department
City of Campbell
70 North First Street
Campbell, California 95008
Re: Pruneyard Diagrammatic Master Plan
-
Dear Mr. Kee:
At the request of our client, Mr. Fred Sahadi, we are delivering to you
the program for the two phase development of the Pruneyard and a dia-
grammatic master plan showing the total development for the site, at
Bascom Avenue, Campbell Avenue and the Route 5 Freeway.
We understand that your review of this product will be used to create
a list of concerns that will become the body of the environmental
impact report. In order that we may move ahead with the master
planning of this project, we would anticipate receiving this list
from you within,the next few weeks.
From the consultant list that you provided to us, we have contacted two
EIR firms and two traffic consultants that are under consideration by
our client. They will be in contact with your office to further
clarify the necessary elements of the EIR.
We look forward to working with you on the development of this project
and its mutual benefit for our client and the City of Campbell.
KR/lm
cc: Fred Sahadi, Pruneyard
Larry A. Patterson, OKS
Donna Sidel, ESA
Linda Pierce, EIP
Chris Kinzel, TJKM
Steve Miller
PRUNEYARD DEVELOPMENT PROGRAM
MSA JOB NO. 84156PR
FEBRUARY 28, 1985
EXISTING DEVELOPMENT
RETAIL........................ .280,000 s. f.
OFFICE BUILDING.................................206,000 s.f.
EXISTING PARKING......(1760)
PARKING TO REMAIN..... 1548
PHASE I
HOTEL. . (350 rooms)......................................... 280,000 s. f.
PARKING. .. .. . . .. .. . 525
OFF ICE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400 ,000 s. f .
PARKING..........~; 1000'
PHASE II
OFF ICE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .400 ,000 s. f.
PARKING............ 1000
DEVELOPMENT TOTAL................ 280,000 s.f. 1,006,000 s.f.
280,000 s.f.
PHASE I & II
DEVELOPMENT TOTAL............................... 1,566,000 s.f.
PHASE I & II
TOTAL PARKING.............4073
PRUNEYARD DEVELOPMENT PROGRAM
MSA JOB NO. 84156PR
FEBRUARY 28, 1985
EXISTING DEVELOPMENT
RETAIL....................... ..280,000 s. f.
OFFICE BUILDING.................................206,000 s.f.
EXISTING PARKING......(1760)
PARKING TO REMAIN..... 1548
PHASE I
HOTEL.. . (350 rooms}......................................... 280,000 s. f.
PARKING. . . .. .. .. .. . 525
OFFI CE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .400,000 s. f .
PARKING............ 1000
PHASE II
OFFICE. . . . . . . . . . . .. . . . . . . . .. . . . . . . . . . . . . . .. . . . . .400,000 s. f.
PARKING............ 1000
DEVELOPMENT TOTAL................ 280,000 s.f. 1,006,000 s.f.
PHASE I & II
DEVELOPMENT TOTAL............................... 1,566,000 s.f.
PHASE I & II
TOTAL PARKING.............4073
280,000 s.f.
PRUNEYARD DEVELOPMENT PROGRAM
MSA JOB NO. 84156PR
FEBRUARY 28, 1985
EXISTING DEVELOPMENT
RETAIL.........................280,000 s.f.
OFFICE BUILDING.................................206,000 s.f.
EXISTING PARKING......(1760)
PARKING TO REMAIN..... 1548
PHASE I
HOTEL. . (350 rooms)......................................... 280,000 s. f.
PARKING............ 525
OFFI CE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .400,000 s. f.
PARKING............ 1000-
PHASE II
OFF ICE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .400,000 s. f.
PARKING............ 1000
DEVELOPMENT TOTAL................ 280,000 s.f. 1,006,000 s.f.
280,000 s.f.
PHASE I & II
DEVELOPMENT TOTAL............................... 1,566,000 s.f.
PHASE I & II
TOTAL PARKING.............4073