Loading...
PC Res 3163RESOLUTION NO. 3163 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A CONDITIONAL USE PERMIT TO ALLOW FOR AN OUT-PATIENT MEDICAL CLINIC (KAISER FOUNDATION HEALTH PLAN) ON PROPERTY LOCATED 220 E. HACIENDA AVENUE IN A C-M-S (CONTROLLED MANUFACTURING) ZONING DISTRICT. APPLICATION OF MS. LEE ANN KNIGHT, ON BEHALF OF KAISER FOUNDATION HEALTH PLAN, INC. FILE NO. LIP 98-02. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application UP 98-02: The provision of a clinic for a major health maintenance organization in a location central to Campbell and on a public transportation line, is desirable to the public convenience and welfare of the citizens and workers of Campbell. 2. The proposed use is at the intersection of two arterial streets, which have adequate capacity for the proposed use. 3. The 160 proposed parking spaces exceeds the 132 space requirement of the City's Zoning Ordinance for the 22 medical practitioners to be working in the facility. 4. The project is conditioned to require repair of the building, parking, landscaping and trash facility to meet City property maintenance standards. 5. The proposed hours of operation and deliveries are daytime and early evening hours. 6. The use does not emit dust, fumes, glare, heat, liquids, noise, odor, smoke, steam, vibration or other such items which create nuisances for the surrounding uses. 7. Hazardous and bio-hazardous materials will be properly stored and removed in conformance with legal and health requirements. Based upon the foregoing findings of fact, the Planing Commission further finds and concludes that: 1. The proposed project is consistent with the General Plan. Planning Commission Resolution No. 3163 UP 98-02 - 220 E. Hacienda Avenue - Kaiser Foundation Health Plan, Inc. Page 2 The use will not be disruptive to the purpose of the C-M zone to provide an environment conducive to the development and protection of modem, large-scale specialized manufacturing, packaging and distribution, research and development, and administrative facilities which are clean, quiet, and which do not emit dust, fumes, glare, heat, liquids, noise, odor, smoke, steam, vibration or other such disturbances. o The establishment, maintenance, or operation of the use applied for will not be detrimental to the health, safety, peace, morals, comfort or general welfare of persons residing or working ion the neighborhood of the use, or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the city. The proposed site is adequate in size and shape to accommodate the yards, walls, fences, parking and loading facilities, landscaping and other development features required in order to integrate said is with uses in the surrounding area. 5. The proposed site is adequately served by streets of sufficient capacity to carry the kind and quantity of traffic such use would generate. 6. The proposed use is compatible with other uses in the area. The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions in accordance with the ordinance of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: PLANNING DIVISION 1. Approved Proiect: Approval is granted for a Use Permit allowing for the operation of an out-patient medical clinic with approximately 80 employees, including 22 practitioners, devoted to providing adult primary care (internal medicine), pediatrics, obstetrics and gynecology, and treatment of minor injuries on property located at 220-D Hacienda Avenue. Project approval shall substantially comply with project plans prepared by South Bay Construction & Development dated July 10, 1981 (site plan), by Anshen + Allen, Architects, dated received April 2, 1998 (floor use plan), and letter of description on Kaiser Foundation Health Plan, Inc. letterhead, dated April 2, 1998, except as modified herein in the Conditions of Approval. Planning Commission Resolution No. 3163 UP 98-02 - 220 E. Hacienda Avenue - Kaiser Foundation Health Plan, Inc. Page 3 Property Maintenance: The following property maintenance items shall be completed prior to commencing medical services operations by Kaiser Foundation Health Plan, Inc.: a. All landscape irrigation facilities within 100 feet of the building shall be checked and repaired to provide adequate operation and delivery of water to all landscape areas. b. All landscape areas which have become barren shall be provided with additional top soil and new groundcover planting. c. Building D shall be prepped and painted to repair all chipped and peeling paint, rust and discoloration. d. The broken curb, located on the west side of the courtyard between Buildings C and D shall be repaired. e. The broken slats in the fencing surrounding the trash area to the west of the building shall be repaired, and the discarded tires removed. 3. Sign Permits: The applicant shall obtain sign permits for all signs. BUILDING DIVISION 4. Building Permits: All improvements and changes shall be submitted to the Building Division for review, and any permits deemed necessary by the Building Official or the Uniform Building Code shall be obtained. The Building and Use most closely resemble a B Occupancy: a. Two stories are permitted. b. The sprinkler system is adequate for the 20,000 square feet of each floor. c. Any occupancy separation between the "B" and any "I-1.2" health care occupancy requires a 2-hour separation; the "B" and any "H-3" hazardous materials areas require a one hour separation. 6. Title 24 requirements shall be met both within the building and within the parking lot. FIRE DEPARTMENT 7. Applicant shall provide verification of a department prior to occupancy. 5-year fire sprinkler certification to the Fire Prior to performing any work, the applicant shall apply to the Building Department for applicable construction permits. At the time of building permit application for any tenant improvements, fire sprinkler modification may be necessary as will hazardous materials review. Planning Commission Resolution No. 3163 LIP 98-02 - 220 E. Hacienda Avenue - Kaiser Foundation Health Plan, Inc. Page 4 PUBLIC WORKS 9. Prior to occupancy of the building by Kaiser Foundation Health Plan, Inc. for medical operations, the parking space located at the bottom of the pedestrian ramp in the Hacienda Avenue/Winchester Blvd. Comer of the site, shall be eliminated. The space shall be striped and signed as a pedestrian walkway so that any vehicle using this space may be towed. PASSED AND ADOPTED this 12th day of May, 1998, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: Steve'Piasecki, Secretary Commissioners: Francois, Gibbons, Jones, Keams, Lowe, Meyer-Kennedy Commissioners: None Commissioners: Lindstrom Commissioners: None ×/ ;/ APPROVED: ~'; __ ,/ T -- ~ Dennis L~we, Chair