Loading...
PC Res 2422RESOLUTION NO. 2422 _. PLANNING COMMISSION BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL RECOMMENDING APPROVAL OF A PLANNED DEVELOPMENT PERMIT, PLANS, ELEVATIONS, DEVELOPMENT SCHEDULE, AND CONDITIONS OF APPROVAL TO ALLOW CONSTRUCTION OF AN INDUSTRIAL BUILDING ON PROPERTY KNOWN AS 190 DILLON AVE. IN A PD (PLANNED DEVELOPMENT/INDUSTRIAL ) ZONING DISTRICT (APPLICATION OF MR. KURT ANDERSON, PD 86-07). After notification and public hearing as specified by law on the application of Mr. Kurt Anderson for approval of a Planned Development Permit, plans, elevations, and development schedule to allow the construction of an industrial building on property known as 190 Dillon Ave., as per the application filed in the Planning Department on July 17, 1986 ;and, after presentation by the Planning Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows: 1. The proposed land use is consistent with the Industrial Land Use shown on the Land Use Element of the City's General Plan. 2. The site and building design as revised is considered acceptable by the City's Architectural Advisor. 3. The proposed retaining wall along the rear property line has been reviewed by the Santa Clara Valley Water District and the Campbell Parks and Recreation Commission and has been found to be acceptable 4. The proposed development will aid the harmonious development of the immediate area. Based on the above findings, the Planning Commission recommends approval of the plans, elevations, development schedule and conditions of approval as presented, and further recommends that the City Council approve a Planned Development Permit and enact the attached Ordinance adopting said plans, elevations, development schedule, and conditions of approval for that portion of the above-referenced Planned Development Zoning District. PASSED AND ADOPTED this 11th day of November 1986 by the following roll call vote: AYES: Commissioners: Dickson, Olszewski, Christ, Perrine, Stanton, Fairbanks, Kasolas NOES: Commissioners: None ABSENT: Commissioners: None. APPROVED: George C. Kasolas Chairman ATTEST: Arthur A. Kee Secretary ORDINANCE NO. BEING AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CAMPBELL APPROVING A PLANNED DEVELOPMENT PERMIT, PLANS, ELEVATIONS, DEVELOPMENT SCHEDULE, AND CONDITIONS OF APPROVAL TO ALLOW CONSTRUCTION OF AN INDUSTRIAL BUILDING ON PROPERTY KNOWN AS 190 DILLON AVE. IN A PD (PLANNED DEVELOPMENT/ INDUSTRIAL ) ZONING DISTRICT. (APPLICATION OF MR. KURT ANDERSON , PD 86-07). The City Council of the City of Campbell does ordain as follows: SECTION ONE: That the Zoning Map of the City of Campbell is hereby changed and amended on property known as 190 Dillon Ave. by adopting the attached Exhibit A entitled Plans and Elevations; Exhibit B entitled Development Schedule; Exhibit C entitled Map of Said Property; and Exhibit D entitled Conditions of Approval, as per the application of Mr. Kurt Anderson for plans, elevations, and development schedule to allow the construction of an industrial building in a Planned Development Zoning District. Copies of said Exhibits are on file in the Planning Department. SECTION TWO: This Ordinance shall become effective 30 days following its passage and adoption and shall be published once within 15 days upon passage and adoption in the San Jose Mercury News, a newspaper of general circulation in the City of Campbell, County of Santa Clara. PASSED AND ADOPTED this day of roll call vote: AYES: Councilmembers: NOES: Councilmembers: ABSENT: Councilmembers: APPROVED: 19 , by the following Mayor ATTEST: City Clerk EXHIBIT B STANDARD DEVELOPMENT SCHEDULE FILE NO: PD 86-07 APPLICANT: ANDERSON, K. SITE ADDRESS: 190 DILLON AVE 1. Construction to begin within one year of final approval. 2. Construction to be completed within one year of starting date. NOTE: Above Development Schedule is a standard used by the Planning Department when applicant has not submitted a schedule for his project. CONDITIONS OF APPROVAL: PD 86-07 APPLICANT: Anderson, K. SITE ADDRESS: 190 Dillon Ave. P.C. MTG. 11-11-86 EXHIBIT D The applicant is notified as part of this application that he/she is required to meet the following conditions in accordance with the Ordinances of the City of Campbell and the Laws of the State of California. 1. Property to be fenced and landscaped as indicated and/or added in red on the plans. Landscaping and fencing shall be maintained in accordance with the approved plans. 2. Landscaping plan indicating type and size of plant material, and location of irrigation system to be submitted to the Planning Department and approved by the Site and Architectural Review Committee and/or Planning Commission prior to issuance of a building permit. 3. Fencing plan indicating location and design details of fencing to be submitted to the Planning Department and approved by the Planning Director prior to issuance of a building permit. 4. Applicant to either (1) post a faithful performance bond in the amount of $3,000.00 to insure landscaping, fencing, and striping of par;:~ng areas within 3 months of completion of construction; or (2) filE written agreement to complete landscaping, fencing, and striping of parking areas. ---- Bond or agreement to be filed with the Planning Department prior to application for a building permit. 5. Applicant to submit a plan to the Planning Department, prior to installation of PG&E utility (transformer) boxes, indicating the location of the boxes and screening (if boxes are above ground) for approval of the Planning Director. 6. Applicant to submit a letter to the Planning Department, satisfactory to the City Attorney, prior to application for building permit, limiting the use of the property as follows: 2,700 sq.ft. office use; 10,757 sq.ft. industrial/storage use. 7. All mechanical equipment on roofs and all utility meters to be screened as approved by the Planning Director. 8. Building occupancy will not be allowed until public improvements are installed. 9. All parking and driveway areas to be developed in compliance with Chapter 21.50 of the Campbell Municipal Code. All parking spaces to be provided with appropriate concrete curbs or bumper guards. 10. Plans submitted to the Building Department for plan check shall indicate clearly the location of all connections for underground utilities including -- water, sewer, electric, telephone and television cables, etc. CONDITIO2IS OF APPROVAL: PD 86-07 APPLICANT: Anderson, K. SITE ADDRESS: 190 Dillon Ave. ~ P.C. MTG. 11-11-86 PAGE 2 11. Sign application to be submitted in accordance with provisions of the Sign Ordinance for all signs. No sign to be installed until application is approved and permit issued by Planning and Building Departments (Section 21.68.030 of the Campbell Municipal Code). 12. Ordinance No. 782 of the Campbell Municipal Code stipulates that any contract for the collection and disposal of refuse, garbage, wet garbage and rubbish produced within the limits of the City of Campbell shall be made with Green Valley Disposal Company. This requirement applies to all single-family dwellings, multiple apartment units, to all commercial, business, industrial, manufacturing, and construction establishments. 13. Trash container(s) of a size and quantity necessary to serve the development shall be located in area(s) approved by the Fire Department. Unless otherwise noted, enclosure(s) shall consist of a concrete floor surrounded by a solid wall or fence and have self-closing doors of a size specified by the Fire Department. All enclosures to be constructed at grade level and have a level area adjacent to the trash enclosure area to service these containers. 14. Applicant shall comply with all appropriate State and City requirements for the handicapped. BUILDING DEPARTMENT No comments . FIRE DEPARTMENT 15. Provide an automatic fire. sprinkler system for all portions of the new and existing building. 16. Underground fuel tanks & dispensers shall be removed prior to issuance of building permit. PUBLIC WORKS DEPARTMENT 17. Provide three sets of on-site grading and drainage plans for review by the Public Works Department. 18. Install street improvements across the entire frontage. 19. Obtain an excavation permit, pay fees, and post surety for all work in the right-of-way. PLANNING DEPARTMENT 20. Prior to issuance of a building permit, applicant to secure permit approval from the Santa Clara Valley Water District.