Loading...
PC Res 2358RESOLUTION N0. 2358 PLANNING COMMISSION BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL RECOMMENDING APPROVAL OF A TENTATIVE SUBDIVISION MAP (TS 85-05). LANDS OF V.L. CHALMERS. LOCATED AT 700 MCGLINCY LANE. After notification and public application for approval of a the above headinh, as per the on July 9, 1505; and, after p proponents and opponents, the hearin; as specified by law on the Tentative Subdivision Iiap as referenced in application filed in the Planning Departrient resentation by the Planning Director, hearing was closed. After due consideration of all evidence presented, the Planning Comrission did find as follows: 1. That this Tentative Subdivision T~iap is in conformance with the General Plan. Based on the above finding, the Planning Commission does hereby recommend approval of this map to the City Council, subject to the Conditions of Approval attached hereto as Exhibit A. PASSED AT1D ADOPTD this 8th day of October 1985 by the following roll call vote: AYES: Commissioners: I:asolas, Perrine, Christ, Dickson, Fairbanks NOES: Commissioners: Olszewski ARSE?3T: Commissioners: Toshach. APPROVED: JoAnn Fairbanks Chairman ATTEST: Arthur A. I:ee Secretary CONDITIONS OF APPROVAL: TS 85-05 APPLICANT: Chalmers, W. L. SITE ADDRESS: 700 McGlincey Ln. PC MTG: 10-8-85 PLANNING DEPARTMENT CONDITIONS 1. Prior to approval of final map, applicant to submit a plan, for the approval of the Planning Director, indicating the design of a 6' masonry or precast concrete wall along the north property line of the subdivision. Wall to be constructed prior to final map approval. 2. Prior to final map approval, applicant to submit a plan, for the approval of the Planning Director, indicating those areas of the recycling center on which additional oil and screening will be provided. Oil and screening of areas to be completed prior to issuance of building permits on any of the newly created lots. PUBLIC WORKS DEPARTMENT 3. Installation of a sanitary sewerage system to serve all lots within the subdivision in conformance with the proposed plans of the County of Santa Clara Sanitation District No. 4. Sanitary sewerage service to be provided by said District No. 4. 4. Installation of water distribution system to serve all lots within the subdivision in conformance with the plans of the San Jose Water Works. Water .service to be provided by said water company. Fire hydrants and appurtenances shall be provided and installed at the locations specified by the Fire Chief, Fire Department, City of Campbell. Fire hydrant maintenance fees shall be paid to City at the rate of $195 per fire hydrant. 5. Subdivider shall create or provide any public service easement and any other public utility and/or public service easements as may be necessary for the installation of any and all public utilities and/or facilities. 6. Compliance with the provisions of Title 20, Subdivisions of the Campbell Municipal Code. 7. Subdivider to pay Storm Drainage Area Fee. 8. Subdivider shall install strett improvements and post surety to guaranty the work. 9. Dedicate additional right-of-way to widen McGlincey Lane to 30' from centerline. 10. Provide a grading & drainage plan for the review and approval of the City Engineer. j 11. Obtain an excavation permit and pay fees and deposit for all work in the public right-of-way. CONDITIONS OF APPROVAL: TS 85-05 APPLICANT: W. L. Chalmers _ SITE ADDRESS: 700 McGLI1~CEY LN PC MTG: 10-8-85 PAGE 2 12. Pay fee in-lieu of parkland dedication. 13. Provide written consent of PG&E of intended use of the tower line easement.