Loading...
PC Res 3109RESOLUTION NO. 3109 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A MODIFICATION TO A PREVIOUSLY APPROVED SITE AND ARCHITECTURAL PERMIT TO ALLOW A FACADE REMODEL FOR BREUNERS LOCATED ON PROPERTY AT 525 E. HAMILTON AVENUE IN A C-2-S (GENERAL COMMERCIAL) ZONING DISTRICT. APPLICATION OF MR. KEVIN JAMES. FILE NO. M 97-07. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application M 97-07. The proposed facade remodel is well designed and is architecturally compatible with the surrounding area by featuring contemporary architectural enhancements including the arcade element, awning treatment and enhancement of the building entrance. The proposed project meets the development standards of the C-2-S (General Commercial) Zoning District, subject to the conditions of approval. o The remodel of over 50% of the facade will require the implementation of the streetscape standards along the frontage of the property on Hamilton Avenue. The refurbishing of the existing landscaping will contribute to the quality of the development, and will serve to update the amount of landscaping on the site that is consistent with other commercial properties recently developed in the vicinity of the project site. o The proposed exterior remodel does not involve an expansion of the building area or a change in the retail/showroom use of the retail portion of the building for furniture sales. Installation of streetscape improvements will facilitate access to the project and enhance the attractiveness of the project to patrons. Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The proposed project is consistent with the General Plan and zoning, and ° The proposed project will aid in the harmonious development of the immediate area. Planning Commission Resolution No. 3109 M 97-07 - 525 E. Hamilton Avenue - Breuners Page 2 The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions is in accordance with the ordinance of the City of Campbell and the State of California. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified Approved Project: Approval is granted for a Modification to the previously approved Site and Architectural Permit allowing the facade remodel of a commercial building located at 525 E. Hamilton Avenue. Project approval shall substantially comply with project plans prepared by MCG Architects, dated March 4, 1997, except as modified by the Conditions of Approval herein. The approved color palette shall be consistent with the color sample board dated 2/26/contained in Community Development Department, file number M 97-07. The Almarida elevation of the warehouse portion of the building shall be painted to match approved wall color. Landscaping: Prior to the issuance of building permits, the applicant shall submit four (4) sets of landscaping plans indicating the following: · Replacement of all dead or previously removed planting material from the existing landscaping areas. · Additional tree wells and trees (minimum 24" box) within the front parking lot area spaced every 40 feet for each aisle of parking. · Climbing vines shall be planted along the chain link fencing that along the eastern property line extending from the front of the building to the front property line. Chain link fencing that is damaged, shall be identified on the plans and replaced prior to installation of the climbing vines. · Additional commercial grade plant containers incorporated under the arcade. · Irrigation shall also be provided in all new planter areas and/or repaired where necessary. · Preparation of landscape plans consistent with the City's Water Efficient Landscape Guidelines (WELS). The planting details and irrigation system shall be submitted to the Community Development Department for review and approval prior to issuance of building permits. o Parking Plan: Prior to the issuance of building permits, the applicant shall submit a revised site plan indicating on-site parking for the front parking lot on Hamilton Avenue. A total of 355 parking spaces must be provided on-site (total). The parking layout is subject to review and approval by the Community Development Director. Tree Protection: A tree protection plan prepared by a licensed arborist shall be submitted to the Planning Division providing tree protection measures during all phases of demolition, resurfacing, or construction. Planning Commission Resolution No. 3109 M 97-07 - 525 E. Hamilton Avenue - Breuners Page 3 o Circulation Improvements: Prior to issuance of any building permits for site, the applicant shall cause plans for access and circulation improvements to be prepared by a registered civil engineer. The plans shall include the following: Almarida Avenue Installation of a 10' standard commercial sidewalk from Hamilton Avenue at to the southwest comer of the warehouse building. Removal and replacement of existing two southerly driveway approaches between Hamilton Avenue and the southwest comer of the existing warehouse building to comply with City standards and to provide ADA accessibility. Modify the existing sidewalk to provide a minimum 4' clear walkway from the southwest comer of the existing warehouse building to the northerly property line, as needed to comply with ADA requirements and City Standards. Implementation of the Streetscape standards including the following improvements: Hamilton Avenue Frontage · Installation of City Standard boulevard walk Streetscape Standards along the Hamilton Avenue frontage including sidewalk, irrigation, and planting. · Removal of existing concrete sidewalk. · Protection and/or replacement of existing underground utilities, signal interconnect conduits, street lighting conduits, and PG&E, PacBell, TCI, and related facilities. · Removal and disposal of existing street lights. · Installation of new City standard street lights, conduit, pull boxes, and · related improvements. · All conforms necessary to join existing improvements. · Relocation of water meters and sanitary sewer cleanouts to the back of walk. · Installation of handicap ramps at comers. Grading and Drainage: Prior to issuance of any building permits, the applicant shall refurbish, remodel, and reconstruct the on-site drainage system, as necessary, to demonstrate that it is functioning normally in accordance with the standards of the City as determined by the City Engineer. Completion of Public Street Improvements: In the event that the circulation improvements are dedicated to the City or improvements are required in the public right- of-way, prior to installation of all such improvements, the applicant shall pay fees, post securities and provide insurance necessary to obtain an encroachment permit for construction of the improvements as required by the City Engineer and all such improvements required by the encroachment permit shall be completed and accepted by the City Engineer. Planning Commission Resolution No. 3109 M 97-07 - 525 E. Hamilton Avenue - Breuners Page 4 o o 10. the City Engineer and the applicant must provide the one-year security. Underground Utilities: All new on-site utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility company. Applicant shall submit a Utility Coordination Plan and Schedule for approval by the City Engineer for installation of all utilities. The Plan shall minimize the damage to all public facilities. Storm Water Management: Comply with California Storm Practices Handbook, prepared by the Storm Water Quality Valley Water District. Water Best Management Task Force, Santa Clara Signage: No signs are approved in conjunction with this application. PASSED AND ADOPTED this 12th day of August, 1997, by the following roll call vote: AYES: Commissioners: Alne, Gibbons, Lindstrom, Meyer-Kennedy ABSTAIN:Commissioners: None ~//~ I. Bud A I'~ Chair i, Secretary