Loading...
PC Res 3110RESOLUTION NO. 3110 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A MODIFICATION TO A PREVIOUS SITE AND ARCHITECTURAL APPROVAL TO ALLOW THE CONSTRUCTION OF A 216 SQUARE FOOT OFFICE ADDITION AND THE REPLACEMENT OFAN EXISTING MAINTENANCE BUILDING AT THE REAR OF THE SITE WITH A TWO-STORY, 7,899 SQUARE FOOT MAINTENANCE BUILDING ON PROPERTY LOCATED AT 100 E. SUNNYOAKS AVENUE IN AN M-1-S (LIGHT INDUSTRIAL) ZONING DISTRICT. APPLICATION OF MR. JOHN NANCE ON BEHALF OF WEST VALLEY SANITATION DISTRICT. FILE NO. M 97-08. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application M 97-08. The proposed project will entail a 216 square foot addition to an existing office building and replacement of a one-story maintenance building with a 7,899 square foot, two-story maintenance building. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood and uses. o The proposed project meets the development standards for an M-1-S (Light Industrial) zoning district including setback requirements, height limitations and parking requirements. Based upon the foregoing findings of fact, the Plalming Commission further finds and concludes that · 1. The proposed project is consistent with the General Plan and the City's zoning ordinance. The proposed project as conditioned will aid in the harmonious development of the immediate area. The establishment, maintenance or operation of the use applied for will not be detrimental to the health, safety, peace, morals, comfort or general welfare of persons residing or working in the neighborhood of such proposed use, or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the City. Planning Commission Resolution No. 3110 M 97-08 - 100 E. Sunnyoaks Avenue- West Valley Sanitation District Page 2 The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions is in accordance with the ordinance of the City of Campbell and the State of California. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified COMMUNITY DEVELOPMENT DEPARTMENT Approved Project: Approval is granted for a Modification to a previous Site and Architectural approval to allow a 216 square foot addition to the existing office building and construction of a 7,899 square foot, two-story maintenance building to replace an existing one-story maintenance building on property located at 100 E. Sunnyoaks Avenue. Project approval shall substantially comply with project plans and material/color sample board prepared by Nanco Architectural Services dated as received by the Community Development Department on July 25, 1997, except as modified by the Conditions of Approval herein. Landscaping: a. The applicant shall submit landscaping and irrigation plans for review and approval by the Community Development Department in compliance with the landscaping requirements for developments within the M-1-S (Light Industrial) zoning district prior to issuance of building permits. bo The applicant shall comply with the City's Water Efficient Landscape Guidelines (WELS) and shall provide a tree protection plan for trees to be protected during construction on site prior to issuance of building permits. o Modification Expiration: Approval of a Modification to the previous Site and Architectural approval is valid for a period of one year from the Planning Commission approval. All conditions of approval specified herein must be completed within one year from the date of approval or the permit shall be void. Building Division Requirements: a. Applicant shall comply with all Building Code requirements and obtain necessary permits as determined by the City's Building Division. bo Based upon occupancy, the building most closely resembles a B (service) and S-3 (vehicle repair, welding) building. One (1) hour occupancy separation walls will be required between the service/welding areas and the other portions of the building in compliance with the requirements of the City's Building Division. One (1) hour occupancy separation walls shall also be required between floors Planning Commission Resolution No. 3110 M 97-08 - 100 E. Sunnyoaks Avenue - West Valley Sanitation District Page 3 Property Maintenance: The property is to be maintained free of any combustible trash, debris and weeds until the time that actual construction commences. All existing structures shall be secured by having windows boarded up and doors sealed shut, or be demolished or removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code). Parking and Driveways: All parking and driveway areas shall be developed in compliance with the standards in Chapter 21.50 of the Campbell Municipal Code. CENTRAL FIRE DISTRICT: 7. Required Fire Flow: Required fire flow is 2250 GPM at 20 psi. residual pressure. Automatic Fire Sprinkler System Required: Buildings requiring a fire flow in excess of 2,000 GPM shall be equipped throughout with an approved automatic fire sprinkler system. The fire sprinkler systems shall conform to National Fire Protection Standard #13, 1994 Edition without the use of exceptions. Private Fire Hydrant(s) Required: Provide one (1) private on-site fire hydrant(s) at location(s) to be determined by the Fire Department. Maximum hydrant spacing shall be 250 feet and the minimum single flow hydrant shall be 1500 GPM at 20 psi. residual pressure. 10. Emergency Gate/Access Gate Requirements: When open, gates shall not obstruct any portion of the required access roadway or driveway width. If provided, all locks shall be fire department approved. Installations shall conform with Fire Department Standard Details and Specifications G-1. 11. Fire Lane Marking Required: Provide marking for all roadways within the project. Markings shall be per Fire Department specifications. Installations shall also conform to Local Government Standards and Fire Department Standard Details and Specifications A- 6. PUBLIC WORKS DEPARTMENT 12. Standard Street Improvements: Prior to issuance of any building permits for site, the applicant shall cause plans for public improvements to be prepared by a registered civil engineer, pay fees, post securities and provide insurance necessary to obtain an encroachment permit for construction of the improvements, as required by the City Engineer. The plans shall include the following: Sidewalk: Removal of the existing 7' exposed aggregate sidewalk and construction of a standard 5' sidewalk. Retention of existing 2' landscape strip in the existing public right-of-way. Planning Commission Resolution No. 3110 M 97-08 - 100 E. Sunnyoaks Avenue - West Valley Sanitation District Page 4 b. Driveways: Removal of two existing asphalt driveways and construction of two standard concrete commercial driveways and conforms to existing improvements. c. Street Lights: Construction of one standard street light in accordance with the City of Campbell Street Lighting Policy. d. Landscape: Installation of street trees and irrigation system as determined by the City Engineer. 13. Prior to Public Works commencing the plan check process for the encroachment permit, the applicant must pay the encroachment permit application and plan check deposit fees. Grading and Drainage Plan: Prior to issuance of any grading, drainage or building permits for the site, the applicant shall conduct hydrology studies, as necessary, prepare an ENGINEERED grading and drainage plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1994 edition of the UBC including Chapters 18, 33, and Appendix Chapter 33. 14. Storm Drain Area Fee: Prior to issuance of any grading, drainage, or building permits for the site, the applicant shall pay the required storm drain area fee of $2,500 per acre or $2,844. 15. Completion of Public Street Improvements: Prior to issuance of occupancy approval for the site, all public street improvements required by the encroachment permit must be completed and accepted by the City Engineer and the applicant must provide the one-year maintenance security. 16. Underground Utilities: All new on-site utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility company. Applicant shall submit a Utility Coordination Plan and Schedule for approval by the City Engineer for installation of all utilities. The Plan shall minimize the damage to all public facilities. 17. Flood Control: Comply with the requirements of the Santa Clara Valley Water District. 18. Storm Water Management: Comply with California Storm Water Best Management Practices Handbook, prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District. 19. Water Meters and Sanitary_ Sewer Cleanouts: Install existing and proposed water meters and sanitary sewer cleanouts on private property behind the public right-of-way line. Planning Commission Resolution No. 3110 M 97-08 - 100 E. Sunnyoaks Avenue - West Valley Sanitation District Page 5 PASSED AND ADOPTED this 12th day of August, 1997, by the following roll call vote: AYES: Commissioners: Alne, Gibbons, Lindstrom, Meyer-Kennedy NOES: Commissioners: None ABSENT: Commissioners: Jones, Keams, Lowe ABSTAIN: Commissioners: None ~/~~ APPROVED: i.B~u~A~e' Ac~i'ng"Chair ATTEST: c..- Stev'b-~Piasecki, Se~refary