Loading...
PC Res 3022RESOLUTION NO. 3022 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A MODIFICATION TO A PREVIOUSLY SITE APPROVAL TO ALLOW THE CONSTRUCTION OF A LIQUID NITROGEN TANK AT THE REAR OF THE BUILDING LOCATED AT 3175 S. WINCHESTER BOULEVARD IN A PD (PLANNED DEVELOPMENT) ZONING DISTRICT. APPLICATION OF P-COM, INC. FILE NO. M 96-02. After notification and hearing, as per the application filed in the Planning Department; and, after presentation by City Staff, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to File No. M 96-02: The proposed project is located in a commercial General Plan land use area and a Planned Development (PD) zoning district for which approval was granted as a research and development building. o The proposed liquid nitrogen tank is essential to the operation of the existing research and development use of the site. o The proposed project will not intensify the use of the site as a research and development facility. The proposed liquid nitrogen tank will be painted to match the color of the existing building to support architectural compatibility to the building. The proposed project will be required to comply with all requirements established by the Building Division and the Central Fire District to ensure safe construction and maintenance of the liquid nitrogen tank. Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: The proposed project is consistent and compatible with the General Plan and the City's zoning ordinance; The proposed project as conditioned will not change the existing use of the site and will, therefore, be compatible and harmonious with existing uses in the surrounding area. The proposed project will result in a more desirable environment and use of land. Resolution No. 3022 M 96-02 - 3175 S. Winchester Boulevard Page 2 The establishment, maintenance or operation of the use applied for will not be detrimental to the health, safety, peace, morals, comfort, or general welfare of persons residing or working in the neighborhood of such proposed use, or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the City. Further, the applicant is notified as part of this application that he is required to comply with all applicable Codes and Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. Approved Project: Approval is granted for a Modification to a site and architectural approval in conjunction with a previously approved Zone Change (ZC 84-02) to allow the installation of a liquid nitrogen tank 8 feet in diameter and 27 1/2 feet in height in the rear of an existing building located at 3175 S. Winchester Blvd. Project approval shall substantially comply with project plans prepared by HPC Architecture, Inc. submitted on March 1, 1996 with red lined corrections. o Permits:Applicant shall obtain any permits deemed necessary by the Building Official or the Uniform Building Code. ge Approval Expiration: This approval (M 96-02) or this project is valid for a period of one year from the Planning Commission approval. All conditions of approval specified herein must be completed within one year from the date of approval or the Modification shall be void. 4e Central Fire Department Requirements: A. Submit separate installation plans to obtain a fire code permit for the cryogenic tank installation. Plans shall include tank/piping layout drawings (with respect to property lines, buildings and access ways, tank specifications, piping material specifications and safety controls). Be Cryogenic tank installation plans shall demonstrate conformance to Article 75 of the California Fire Code (CFC), as adopted by the City of Campbell. o Removal of cargo containers: The applicant shall remove all cargo containers from the project site which do not have prior approval of a modification to a Site and Architectural approval prior to issuance of a building permit. Resolution No. 3022 M 96-02 - 3175 S. Winchester Boulevard Page 3 6. Landscaping: a. The applicant shall eliminate one parking space adjacent to the proposed liquid nitrogen tank and replace the space with a landscaped planter to consist of a sizable tree to adequately provide additional screening of the tank. The type and size of the tree shall be reviewed and approved by the Community Development Director. The applicant shall provide additional trees along the northern and western property lines adjacent to neighboring residential uses to provide additional screening of the trees. The number, type and size of trees shall be reviewed and approved by the Community Development Director. Chain Link Fence: The chain link fence shall be extended to surround the entire concrete pad around the liquid nitrogen tank. PASSED AND ADOPTED this 12th day of March, 1996, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: Commissioners: Commissioners: Commissioners: Commissioners: Alne, Jones, Kearns, Lindstrom, Lowe, Meyer- Kennedy None None None "~Steve~as~c~, Secretary