Loading...
PC Res 2953RESOLUTION NO. 2953 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A SITE AND ARCHITECTURAL APPLICATION TO ALLOW THE EXPANSION OF AN EXISTING RETAIL BUILDING (BREUNERS) ON PROPERTY LOCATED AT 525 E. HAMILTON AVENUE IN A C-2-S (GENERAL COMMERCIAL) ZONING DISTRICT. APPLICATION OF MR. KEVIN RING, ON BEHALF OF TRINITY DEVELOPMENT COMPANY. FILE NO. S 94-09. After notification and Public Hearing as specified by law on the application of Mr. Kevin Ring, on behalf of Trinity Development Company, for approval of plans allowing the expansion of an existing retail building (Breuners) located at 525 E. Hamilton Avenue; as per the application filed in the Planning Department on December 30, 1994, and, after presentation by the Community Development Director, proponents and opponents, the hearing was dosed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to File No. $ 94-09: The proposal is consistent with the General Plan and Zoning District which permits commercial land uses. The proposal exceeds the landscaping requirements of Commercial Zoning Districts by providing landscaping of approximately 14 percent of the site area and incorporates a substantial number of on-site and off-site trees. e The proposed parking reduction for the furniture showroom use and the addition of 143 new on-site parking spaces adequately addresses the parking needs of the proposed uses based upon the information contained in the traffic report prepared for this project and with the concept of shared parking facilities. The proposed project is of an appropriate scale and design and is compatible with the existing commercial and residential development in the area. The project is subject to the implementation of traffic mitigation measures identified in the Mitigated Negative Declaration and subject to implementation of the Conditions of Approval. o The presented site plan is of an adequate size and will be developed to provide pedestrian access by incorporating walkways into the site. Facilities for bicycle traffic will also be developed to integrate the proposed use into the neighborhood and the surrounding commercial development subject to the Conditions of Approval for this project. Resolution No. 2953 $ 94-09 -525 E. Hamilton Avenue (Breuners) Adopted on February 28, 1995 Page 2 The development of the project will generate 429 additional vehicle trips during the evening peak hour and will substantially impact the intersections within the vicinity of the project. o Breuners' participation in the widening of Salmar Avenue will offset traffic impacts resulting from the development of the project and will integrate this project with the surrounding residential and commercial uses. The generation of additional traffic as a result of this proiect traffic will result in vehicle traffic traveling through the Almarida neighborhood without the implementation of measures to direct traffic back to Hamilton Avenue. The installation of traffic improvements at the driveways on Almarida Drive will direct project traffic back to Hamilton Avenue and mitigate traffic impacts to the adjacent residential neighborhood. 10. Additional traffic generated by this project development will degrade the level of service of the intersection of Salmar Avenue and Hamilton below acceptable City standards. Participation by Breuners in the widening of Salmar Avenue as a traffic mitigation measure is required to mitigate the impacts of this project. Based upon the foregoing findings of fact, the Planning Commission further finds and concludes, subject to the Conditions of Approval, that: o The establishment, maintenance or operation of the use applied for will not be detrimental to the public health, safety, peace, morals, comfort or general welfare of persons residing or working in the neighborhood of such proposed use, or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the City. The proposed site is adequately served by streets of sufficient capacity, subject to the proposed traffic mitigation measures, to carry the kind and quantity of traffic the proposed use would generate. The proposed project is consistent with the General Plan and Zoning of the site and will aid in the harmonious development of the immediate area subject to the Conditions of Approval. Resolution No. 2953 $ 94-09 --525 E. Hamilton Avenue (Breuners) Adopted on February 28, 1995 Page 3 o The proposed use is compatible with the uses in the area, ~ubject to the Conditions of Approval. e The conditions of approval area roughly proportional and reasonably related in nature and extent to the impacts of the project. Approval is effective ten days after decision of approval of the Planning Commission, unless an appeal is filed, subject to the following Conditions of Approval: Proiect Approval: Approval for this project allows the following: A. Site modifications including reconfiguration and construction of new retail space in accordance with plans, stamp dated "exhibit A". B. Reconfigured parking and landscaping. Elevation changes and architectural modifications. D. Revised pedestrian and vehicular access and circulation. Site Plan Final Site Plan: The final site plan including location of pedestrian walkways and landscaping shall be submitted to the City for review and subject to approval by the Community Development Director for substantial compliance with the approved plans prior to issuance of the building permits. Be Development Schedule: Applicant shall begin construction within one year of final approval. Parking & Driveways: All parking and driveways shall be developed in accordance with'Chapter 21.50 of the Campbell Municipal Code including parking modifications as approved by the City. Do Pedestrian Connections: Applicant shall install pedestrian walkway connections from the public right-of-way as indicated on the site plan. o Landscapin2 A. Site Landscape Plan: Applicant shall provide four sets of landscape and irrigation plans indicating type and size of plant materials, irrigation system and planting details to be submitted to the Planning Department and approved by the Community Development Director prior to issuance of building permits. Resolution No. 2953 S 94-09 -525 E. Hamilton Avenue (Breuners) Adopted on February 28, 1995 Page 4 o Landscaping plan to address the following: Screening planting along Almarida Drive on and off-site, consistent with commercial development standards, shall be installed to soften the building elevation. 2e Transition of streetscape along Hamilton Avenue to corners of the property along Hamilton Avenue in accordance with the Streetscape Standards. Be Landscape Standards: All landscaping shall comply with the City's Water Efficient Landscape Standards (WELS) Co Tree Wells: Applicant shall install 15-gallon shade trees in designated locations on site and on perimeter parking areas of a size and type acceptable to the City in conformance with the revised site plan that will be submitted with planting details. De Tree Protection Plan: Applicant shall provide tree protection plan indicating trees to be protected and maintained on site during construction. Eo Street Trees: All street trees shall be installed and maintained in accordance with the Streetscape Guidelines for Hamilton Avenue. Street trees to be selected in accordance with the standards adopted by the City of Campbell subject to review and approval by the Public Works Department. Site Construction Construction and Equipment: Applicant shall utilize construction equipment which adequately levels the noise in accordance with Section 18.02.030 of the City of Campbell Municipal Code. Construction activity and construction equipment shall comply with all air quality emission policies as determined by the Bay Area Air Quality Management District and the Building Official for the City of Campbell. Be Construction Hours: Hours of construction shall be limited to 8 a.m. To 5 p.m., Monday through Friday, and 9 a.m. To 4 p.m. Saturdays. No construction is permitted on Sundays or Holidays. Resolution No. 2953 $ 94-09 --525 E. Hamilton Avenue (Breuners) Adopted on February 28, 1995 Page 5 o o o 10. C. Construction Site: 1. The construction site shall be sprinklered with water, as necessary, but not less than twice per day, in areas of new construction or grading where dirt is exposed, to control dust. Haul trucks and material stockpiles shall be covered. The construction area and surrounding areas shall be swept as necessary, but not less than once daily. All areas shall be adequately fenced for safety per the Building Official during construction and demolition. Demolition Permit: Applicant is required to obtain a demolition permit, subject to review and approval by the Building Official, prior to demolition of any structure on site. Handicapped Accessibility: All new and remodeled buildings shall provide handicapped access in accordance with the Uniform Building Code (UBC) and the Uniform Federal Accessibility Standards (UFAS) and the Federal Americans With Disabilities Act (ADA). Mechanical Equipment: All roof-mounted and ground-level mechanical equipment on new or remodel structures on site, which are visible from the public right-of-way, shall be screened with similar building materials subject to the approval of the Community Development Director. Garbage Collection: Trash containers of a size and quantity necessary to serve new or modified building areas shall be located in areas approved by the Fire Department. Unless otherwise noted, enclosures shall consist of s concrete floor surrounded by a solid wall or fence and have self- closing doors of a size specified by the Fire Department. All enclosures to be constructed at grade level and have a level area adjacent to the trash enclosure area to service these containers. Easement or Dedication to the City: The owner shall grant a public access easement satisfactory to the Public Works Department, that shall be recorded with the property, or dedicate additional right-of-way on Hamilton Avenue to back of sidewalk. Area to be dedicated or the easement provided shall include a 10-foot wide landscaping parkway and the seven-foot wide public sidewalk. Deed Restriction: Owner shall record a deed restriction in a form acceptable to the City Attorney providing that in the event of the transfer Resolution No. 2953 $ 94-09 --525 E. Hamilton Avenue (Breuners) Adopted on February 28, 1995 Page 6 11. 12. 13. 14. 15. of ownership of any parcel subject to this application: Each parcel shall have a mutual reciprocal easement to park in the parking area of each others parcel; The on-site and off-site parking and landscaping shall be jointly maintained by the owners of each of the parcels in accordance with the Conditions of Approval for S 94-09. Public Street Improvements: Applicant shall construct improvements found necessary by the City Engineer according to general engineering practice. Applicant shall submit existing and proposed street centerline, monuments, right-of-way lines, public street improvements and public utility facilities on all required street improvement plans. Driveway Approach: Submit plan details indicating the elimination of the northerly driveway on Almarida Drive and dedicate the replacement of the existing driveway with curb, gutter and sidewalk to conform to proposed street improvement standards as directed by the Public Works Department. Boulevard Treatment/Hamilton Avenue: Submit plans for review and approval of the Planning and Public Works Departments for construction of boulevard treatment on Hamilton Avenue that include construction/modification of concrete sidewalks, street trees, landscaping and irrigation in conformance with the City's Streetscape Standards. Irrigation to the streetscape improvements shall tie into the on-site landscape irrigation system to ensure consistent maintenance of landscape improvements. Upon completion of Hamilton Avenue streetscape, the maintenance of the streetscape improvements as well as on-site improvements is the sole responsibility of the applicant/property owner . Almarida Drive Sidewalk Modification: Applicant to submit plans to construct eight-foot wide sidewalk improvements with tree wells on Almarida Drive in accordance with Public Works standards. Underground Utilities: Install new on-site utilities underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled building additions. Provide evidence from all utility companies that the proposed development modifications can be served. Resolution No. 2953 S 94-09 --525 E. Hamilton Avenue (Breuners) Adopted on February 28, 1995 Page 7 16. 17. 18. 19. 20. 21. Comply with the plan submittal, permit and fee requirements of the utilities associated with new or modified service connections. Grading and Drainage Plans: Applicant to submit grading and drainage plans to the City Engineer for review. Show existing and proposed on- site storm drain. Storm water collected on site and conveyed underground to an existing off-site public storm drain system based upon a 10 year return period. Encroachment Permit: Applicant to apply for an encroachment permit(s), pay fees and post surety for all construction with the City's right-of-way. Public Property Maintenance: The applicant shall incorporate the existing excess public right-of-way at the northwest corner of the property on Almarida Drive into the landscape plan required for S 94-09 and shall record a covenant to maintain this area in conjunction with the approved landscape plans. Sidewalk Transitioning: Applicant and City to coordinate sidewalk transitioning at southbound Highway 17 off-ramp and Hamilton Avenue. Fire Sprinkler Protection: Applicant to provide the appropriate density of automatic fire sprinkler protection throughout all new construction. The existing sprinkler system within Breuners shall be upgraded to current standards of NFPA 13-1991 ed. Salmar Widening: Applicant shall pay $188,000 to the City for the construction of an additional right turn lane for the northbound approach at the Hamilton Avenue and Salmar Avenue intersection, which is necessary to accommodate the increase in traffic generated by the project. The City will enter into a payback agreement with the applicant which will reimburse the applicant as additional development in the area is approved which will also benefit by the proposed project. The share of this improvement shall be based on the new trip generation to each development site over the total new trip generation in the area. This payback agreement will remain in effect until such time as the street widening project is accepted by the City Council. Resolution No. 2953 S 94-09 --525 E. Hamilton Avenue (Breuners) Adopted on February 28, 1995 Page 8 22. Almarida/Hamilton Signal Modification: Applicant shall modify the existing traffic signal at Hamilton Avenue and Almarida Drive to provide left and right turn arrows for north and southbound movements by replacing existing signal faces. The applicant will submit plans for this modification to the City Engineer as part of the encroachment permit necessary for all the off-site improvements required for the project. In lieu of the applicant constructing these improvements, a fee of $2,800.00 may be paid to the City for the installation of said modifications. 23. Almarida Driveway Improvements: Applicant shall prepare plans for approval by the City Engineer and implement those plans which encourage the traffic entering and exiting the site from all driveways to use Hamilton Avenue. PASSED AND ADOPTED this 28th day of February, 1995, by the following roll call vote: AYES: Commissioners: Alne, Higgins, Kearns, Lindstrom, Lowe, Meyer-Kennedy, Perrine NOES: Commissioners: None ABSENT: Commissioners: None ATT~~~retar~ ~Meyer-I~e'nn~'dy, Chair ~/j