Loading...
CC Resolution 8714 RESOLUTION NO. 8714 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL ADOPTING THE CITY OF CAMPBELL STANDARD SPECIFICATIONS AND DETAILS FOR PUBLIC WORKS CONSTRUCTION WHEREAS, the eXIstmg document entitled General Conditions. Standard Construction Provisions and Standard Construction Details for Public Works Construction has become outdated; and WHEREAS, staff has prepared a new document entitled City of Campbell Standard Specifications and Details for Public Works Construction to be used for all construction within the public property; and WHEREAS, the City of San Jose has prepared updated standard specifications and details, which are comprehensive, accurate and applicable to work in the City of Campbell; and WHEREAS, the new document uses the more appropriate City of San Jose Standard Specifications and Standard Details as a source document rather than the State Standard Specifications and Standard Plans; and WHEREAS, revisions and updates to the City of Campbell Standard Specifications and Details for Public Works Construction will periodically be necessary; NOW, THEREFORE, BE IT RESOL VED by the City Council of the City of Campbell that the City of Campbell Standard Specifications for Public Works Construction is hereby adopted for all work within the public right of way, and the City Engineer is hereby authorized to update and revise this document as necessary. PASSED AND ADOPTED this 6th day of September, 1994, by the following roll call vote: AYES: Councilmembers: Conant, Ashworth, Burr, Dougherty, Watson NOES: Councilmembers: None ABSENT: Councilmembers: None A~T:. ~d?- Anne Bybee, City Clerk CITY OF CAMPBELL STANDARD SPECIFICATIONS AND DETAILS FOR PUBLIC WORKS CONSTRUCTION JULY 1994 CITY OF CAMPBELL - DEPARTMENT OF PUBLIC WORKS DRAFT TABLE OF CONTENTS FORWARD ...................................................... GENERAL PROVISIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 SECTION 1 DEFINITIONS AND TERMS ............................ 1 1-1.01 A General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1-1.02 Abbreviations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1-1.03 Acceptance ........................................ 2 1-1.09 Contract .......................................... 2 1-1 . 1 0 Contractor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1-1 .15 Director of Public Works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1-1.17 Encroachment Permit ................................. 3 1-1 . 1 8 Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1-1.29 Plans ............................................ 3 1-1.37 Special Provisions ................................... 3 1-1.38 Specifications....................................... 3 SECTION 2 PROPOSAL REQUIREMENTS AND CONDITIONS. . . . . . . . . . . . 3 2-1.01 Contents of Proposal FomE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2-1.056 City Employees and Design Engineers May Not Bid on Construction Contract. .............................. 3 2-1.11 Ineligibility to Contract . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2 -1 . 12 General Guaranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 SECTION 3 AWARD AND EXECUTION OF CONTRACT. . . . . . . . . . . . . . . .4 3-1.02 Contract Bonds ..................................... 5 3-1.02B Contractor's Payment Bond ........... . . . . . . . . . . . . . . . . . . 5 3-1.09 Protesting of Award of Bid ............................. 5 SECTION 5 GENERAL ......................................... 5 5-1.07 Lines and Grades .............. . . . . . . . . . . . . . . . . . . . . . . 5 5-1.13 Final Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 SECTION 6 CONTROL OF MATERIALS ............................ 6 6- 3.01 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 6-3.0IA Failed Tests. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 6- 3.01 B Permit Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 39-5.01 39-6.01 DRAFT Spreading Equipment ................................ 20 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 SECTION 56 SIGNS .......................................... 21 56-2.01 Description ....................................... 21 SECTION 73 CONCRETE CURBS AND SIDEWALKS. . . . . . . . . . . . . . . . . . 21 73 -1. 05 F Backfilling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 SECTION 84 TRAFFIC STRIPES AND PAVEMENT MARKINGS . . . . . . . . . . 21 84-1.02 Control of Alignment and Layout. . . . . . . . . . . . . . . . . . . . . . . . 21 84-2.01 Description ....................................... 22 84-3.02 Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 84-3.05 Application .,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 84-3.05A Temporary Striping. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 84-3.05B Removal of Existing Traffic Stripes and Pavement Markings ................................. 22 SECTION 86 SIGNALS, LIGHTING AND ELECTRICAL SYSTEMS ... . . . . . 23 86-1.05 86-2.04 86-2.04A 86-2.04B 86-2.05 86-2.05B 86-2.05C 86-2.06B 86-2.09C 86-2.09E 86-2.09F 86-2.09G 86-2.09G3 86-2.10 86-2.11 86-2.16 86-4.05B 86-4.06 86-5.01 86-5.02 86-6.00 Maintaining Existing and Temporary Electrical Systems. . . . . . . . . 23 Standards, Steel Pedestal and Posts . . . . . . . . . . . . . . . . . . . . . . . 24 Octafluted Lighting Standards .......................... 24 Signal Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Conduit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Use ............................................ 24 Installation ....................................... 24 Cover Markings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Connectors and Terminals .... . . . . . . . . . . . . . . . . . . . . . . . . . 25 Splice Insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Fused Splice Connector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Traffic Signal Communications Cable ..................... 26 Traffic Signal Communications Cable Testing. . . . . . . . . . . . . . . . 26 Bonding and Grounding .............................. 26 Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Painting ......................................... 27 Front Screen ...................................... 27 Signal Mounting Assemblies ........................... 27 Vehide Detectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Pedestrian Push Buttons .............................. 28 Luminaire Class and Types ............................ 28 SECTION 1301 TRENCH EXCAVATION, BEDDING AND BACKFILL. . . . . . 28 1301-1.4 Survey Monuments and Points ..........................28 1301-1.6 Backfill and Surface Restoration Methods .................. 29 DRAFT CITY OF CAMPBELL GENERAL PROVISIONS SECTION I DEFINITIONS AND TERMS 1-1.0IA General - All work within City of Campbell public property shall be performed in accordance with this document, entitled "City of Campbell Standard Specifications and Details for Public Works Construction" (CCSS), also referred to as the Standard Specifications. Unless amended herein, the City of San Jose Standard Specifications July 1992 (SJSS) and Standard Details July 1992 (SJSD) are hereby incorporated and are made a part hereof. All references in the CCSS, SJSS, and SJSD to the SS and SP shall be to the July 1992 editions of the SS and SP. Within the SJSS and SJSD, the words "City of San Jose" shall be replaced by the words "City of Campbell", the abbreviations "CSJ" shall be replaced by "Campbell" and all references to the City of San Jose shall be to the City of Campbell, a general law City incorporated in the State of California. All references to locations of City of San Jose offices shall be the location of the equivalent City of Campbell office. All references to provisions of the San Jose Municipal Code shall be references to the related provisions of the City of Campbell Municipal Code, if applicable. Unless otherwise specifically stated or amended herein, all provisions of the City of . San Jose Standard Specifications shall apply. Attention is directed to the following private utility companies and special districts operating within the City of Campbell. Pacific Bell - Telephone Pacific Gas & Electric - Gas & Electric San Jose Water Company - Water Santa Clara Valley Water District T.C.I. - Cable Television West Valley Sanitation District - Sanitary References to construction standards for these facilities as required in the SJSS, shall not apply to City of Campbell contracts. Construction specifications for the actual construction of these facilities shall be as required by the individual utility company or special district. However, all General Provisions I DRAFT Works, also referred to as the "Director", also ex-officio "Superintendent of City Streets", acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties properly delegated to them; also referred to herein as "Engineer". 1-1.17 Encroachment Permit - Any permit issued by the Public Works Department on behalf of the City authorizing work in the public right-of-way. Special provisions for encroachment permit work are included with the permit and take precedence over all other specifications or details and may only be superseded by the Engineer. 1-1.18 Eneineer - The Public Works Director -of the City of Campbell, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties properly delegated to them. 1-1.29 Plans - The project or permit plans, the City of San Jose Standard Details (July 1992) as amended and supplemented by the City of Campbell Standard Specifications and Details for Public Works Construction (July 1994), profiles, typical cross-sections, working drawings and supplemental drawings, or reproductions thereof, approved by the Engineer, which show the location. character, dimensions and details of the work to be performed. All such documents are to be considered as a part of the plans whether or not reproduced in the special provisions. 1-1.37 Special Provisions - Specific clauses setting forth conditions or requirements peculiar to the work and supplementary to the Standard Specifications. The State of California Department of Transportation (CaITrans) publications entitled "Labor Surcharge And Equipment Rental Rates" and "General Prevailing Wage Rates" are to be considered as a part of the special provisions except for work being done under a Public Works encroachment permit. 1-1.38 Specifications - The directions, provisions and requirements contained in the Standard Specifications and supplemented or revised by the special provisions. SECTION 2 PROPOSAL REOUIREMENTS AND CONDITIONS 2-1.01 Contents of Proposal Forms. The last sentence of Section 2-1.01 "Contents of Proposal Forms, of the SJSS is hereby deleted. 2-1.056 Citv Emplovees and Desism Ene:ineen Mav Not Bid on Construction Contract. Section 2-1.056, "State Employees and Design Engineers May Not Bid on Construction Contract" of the SS is hereby incorporated. General Provisions - City of Campbell 3 DRAFT 3-1.02 Contract Bonds - In lieu of Section 3-1.02 "Contract Bonds" of the SJSS, the following shall apply. The successful bidder shall furnish a Bond for Faithful Performance and a Bond for Labor and Materials at the time of execution of the contract. In the case of Public Works permit work, a Bond for Faithful Performance in the amount of 100% of the Engineer's Estimate of the work to be performed shall be required. A Bond for Faithful Performance of the Maintenance Period shall also be required as indicated in Section 2-1.12 "General Guaranty" of these standard specifications. Each bond shall conform to the form included in the Contract Forms section of the special provisions. All alterations, extensions of time, extra and additional work, and other changes authorized by the specifications, special provisions, or any part of the contract may be made without securing the consent of the surety or sureties of the contract bonds. All surety companies must be authorized to transact business within the State of California. 3-1.02B Contractor's Payment Bond - All references to the "Contractor's Payment Bond" shall be revised to read "Bond for Labor and Materials." 3-1.09 Protestine Of Award Of Bid - Unsuccessful bidders who feel aggrieved by the awarding of the project to another bidder may protest the award of such bid by notifying the City Clerk. in \\Titing, of their grounds for believing the award was improper within ten (10) days from the date the contract was awarded. Failure to provide such notice within the ten (10) day period will constitute waiver of any and all rights, claims, damages or causes of action against the City arising out of the award of the contract. SECTION 5 GENERAL 5-1.07 Lines and Grades - In lieu of Section 5-1.07 "Lines and Grades" of the SJSS, the following shall apply. The Contractor shall be responsible for providing all stakes and marks as necessary to establish the lines and grades required for completion of the work specified in the specifications, on the plans. and in the special provisions. All stakes and marks shall be set and cut sheets provided by an individual licensed in the State of California to provide such stakes, marks and cut sheets. The cut sheets shall be subject to review and approval by the Engineer and shall be provided to the Engineer at least two working days prior to planned start of work. All plans shall reference the City' s bench mark circuit. General Provisions - City of Campbell 5 DRAFT SECTION 7 LEGAL RELATIONS AND RESPONSIBILITY 7-1.01A(4) Labor Nondiscrimination - In lieu of Section 7-1.01A(4), "Labor Nondiscrimination of the SJSS, Section 7-1.01A(4), "Labor Nondiscrimination" of the SS is hereby incorporated. 7-1.01C(1) City Business License - All Contractors and Subcontractors doing work in the City of Campbell shall have a valid City of Campbell Business License in addition to the appropriate State Contractor' s License. 7-1.06 Safetv and Health Provisions - The following paragraph is hereby added to Section 7-1.06 "Safety and Health Provisions," of the SJSS: The Contractor shall provide for sanitary facilities for the use of~1.e workers on the job. Such facilities shall be placed and maintained by the Contractor so as not to be aesthetically displeasing, annoying to the neighbors, nor offensive to the senses nor the community standards of decency. The Engineer shall be the sole judge of the adequacy of the facilities, the placement. and the maintenance thereof. Upon notification by the Engineer of deficiencies in any of these areas. the Contractor shall make immediate corrections. Failure to take corrective action within 24 hours shall give the Engineer due cause to stop the work in the Contract and to order the corrective work to be done on the toilet facility and to charge all costs of such work against the monies due or to becom~ due to the Contractor. Compensation for the provision and maintenance of such facilities shall be considered a portion of the various items of work and no separate or additional payment shall be made therefor. 7-1.08 Public Convenience - The following paragraph is hereby added to Section 7-1.08 "Public Convenience," of the SJSS. If the closure of a street or blocking of the traffic in that street is anticipated or desired, the Contractor must have the Engineer's written approval prior to such closing or blocking. If such access will not be possible, or if a street is blocked or closed at any time, the Contractor shall also notify City Communications at 866-210 I of such situation. The Contractor shall also notify City Communications when such access restriction is eliminated. General Provisions - City of Campbell 7 DRAFT aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Liability: $1,000,000.00 per accident for bodily injury and property damage. 3. Employer's Liability: $1,000,000 per accident for bodily injury or disease. Deductibles and Self-Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration and defense expenses. Other Insurance Provisions The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 1. The City. its officers, employees and volunteers are to be covered as insureds with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the Contractor; and with respect to the liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor' s insurance, or as a separate o\\ner's policy. ! For any claims related to this project, the Contractor's insurance coverage shall be primary insurance as respf::S the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Contractor's insurance and shall not contribute with it. 3. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the City. Acceptabilitv of Insurers General Provisions - City of Campbell 9 DRAFT 7-1.17 Acceptance of Contract - In lieu of Section 7-1.17, "Acceptance of Contract" of the SJSS, the following shall apply. When the Engineer has made the final inspection as provided in Section 5-1.13, "Final Inspection," and determines that the contract work has been completed in all respects, and in its entirety, in accordance with the plans and specifications, the Engineer will recommend that the City formally accept the contract. Immediately upon and after such acceptance by the City, the Contractor will be relieved of maintaining and protecting the work as a whole, except for any specifically designated maintenance items and all warranty work. SECTION 8 PROSECUTION AND PROGRESS This section is not applicable to Public works permit work. 8-1.03 Beeinnine of Work - The first paragraph of Section 8-1.03 "Beginning of Work" of the SJSS is hereby amended to read as follows: Unless otherwise approved by the Engineer, the Contractor shall begin work within 10 calendar days from the date of the Notice to Proceed, and shall diligently prosecute the same to completion within the time limit provided in the special provisions. The first working day charged will be the first day that the Contractor actually begins work, or the II th calendar day after the issuance of the Notice to Proceed, whichever occurs first. Should the 11th day after the issuance of the . Notice to Proceed fall on a Saturday, Sunday, or legal holiday, the following working day shall be the first working day charged. 8-1.04 Proeress Schedule - In lieu of Section 8-1.04 "Progress Schedule" of the SJSS the following shall apply. The Contractor shall submit a project progress schedule for approval by the Engineer within eight (8) days, not including Saturdays, Sundays and legal holidays from the date of the Notice of A ward of the Contract. Failure to submit an acceptable progress schedule shall result in rejection of the Contractor's proposal. The progress schedule shall be in the form specified below unless otherwise specified in the special provisions or approved by the Engineer. Updated progress schedules shall be provided to the Engineer monthly with the estimates of work required in Section 9-1.06 "Partial Payments". No partial payments will be made for any work until an updated schedule has been submitted and approved by the Engineer. Updated schedules shall incorporate all current schedule information, including actual progress, approved time adjustments, and proposed changes in sequence and logic. General Provisions - City of Campbell 11 DRAFT care and protection of work already performed, or unless the Engineer has determined that the work is of an emergency nature. When the Engineer has made such a determination, all costs incurred by the City to provide inspection of the work during these times shall be borne by the Contractor and shall be withheld from monies due or to become due to the Contractor, or in the case of permit work, all costs incurred by the City to provide inspection of the work during these times shall be borne by the permittee. SECTION 9 MEASUREMENT AND PAYMENT This section is not applicable to Public Works permit work. 9-1.06 Partial Payments - The first paragraph of Section 9-1.06 "Partial Payments" of the SJSS shall be deleted and shall be replaced with the following paragraphs. The Contractor. once each month, on the anniversary date of the Notice to Proceed, shall submit to the Engineer for approval an estimate in writing of the value of the work completed to the time of the estimate. The estimate shall include an itemization by bid items. The value of the work shall be based upon the principals set forth in the measurement and payment portions of the bid items as set forth in the special provisions and the Standard Specifications. In the event the City of Campbell fails to make any progress payment within 30 days after receipt of an undisputed and properly submitted payment request from the Contractor, the City shall pay interest to the Contractor equivalent to the legal rate set forth in subdivision (a) of Section 685.010 of the Code of Civil Procedure. Upon receipt of a payment request, the City of Campbell shall act in accordance with both of the following: 1 . Each payment request shall be reviewed by the City of Campbell as soon as practicable after receipt for the purpose of determining that the payment request is a proper payment request; and 2. Any payment request determined not to be a proper payment request suitable for payment shall be returned to the Contractor as soon as practicable, but not later than seven days, after receipt. A request returned pursuant to this paragraph shall be accompanied by a document setting forth in writing the reasons why the payment request is not proper. The number of days available to the City of Campbell to make a payment without incurring interest shall be reduced by the number of days by which the City exceeds the above seven-day return requirement. General Provisions - City of Campbell 13 DRAFT may request, in wntmg, within thirty (30) days of receipt of the claim, any additional documentation supporting any claim or relating to any defense to the claim the City may have against Contractor. City shall respond to Contractor's claim in writing within thirty (30) days after receipt of the requested additional information, or within a period of time no greater than that taken by Contractor in producing the requested additional information, whichever is greater. In the event that Contractor disputes the City's written response to Contractor's claim, or fails to respond to the Contractor's claim within the time prescribed in this section, Contractor shall, within fifteen (15) days thereof demand, in writing, a conference with City to meet and confer for settlement of the issues in dispute. City shall then schedule such conference within thirty (30) days of receipt of said demand document. In the event that the meet and confer conference fails to resolve the claim or any portion thereof, Contractor may file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. This provision does not apply to tort claims and nothing in this provision is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. The following procedures shall apply to all civil actions filed to resolve claims pursuant to this section. (a) Within sixty (60) days, but not earlier than thirty (30) days of the filing of any claim, the matter shall be submitted to nonbinding mediation. City and Contractor shall then have fifteen (15) days to agree upon the selection of a disinterested third party as mediator. Mediation shall begin within thirty (30) days of selection of mediator, and shall be concluded within fifteen (15) days thereafter unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties. If the parties fail to select a mediator within the fifteen (15) day period, any party may petition the court to appoint the mediator. (b) If the nonbinding mediation fails to resolve the claim, the parties shall submit the matter to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. (c) The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to the proceeding, consistent with the rules pertaining to judicial arbitration. General Provisions - City of Campbell 15 DRAFT TECHNICAL PROVISIONS SECTION 12 CONSTRUCTION AREA TRAFFIC CONTROL DEVICES The Contractor shall submit a traffic control plan for review and approval by the Engineer prior to beginning any work on the project. The traffic control plan shall coincide with the project schedule and shall be consistent with the plans, standard specifications, and special provisions for the work involved. Traffic control shall conform to the State of California Manual of Traffic Controls for Construction and Maintenance Work Zones, unless otherwise amended herein, or in the special provisions. 12-1.02 Traffic Control Public Convenience - Paragraphs 11 and 12 of Section 12-1.02 "Traffic Control Public Convenience" of the SJSS are hereby amended to read as follows: The Contractor shall notify City of Campbell Communications at (408)866-2101 24 hours in advance of any detours and street closures. All detours and street closures must be approved in advance by the Engineer. On streets with one traffic lane in each direction, the Contractor shall maintain one 10' traffic lane in each direction unless otherwise approved by the Engineer. All proposed reductions in lane widths and number of lanes must be presented by the Contractor in the traffic control plan for approval by the Engineer prior to work commencing. 12-1.03 Traffic Control Public Safety - The third, fourth, and fifth paragraphs of Section 12-1.03 "Traffic Control Public Safety" are hereby deleted and replaced with the following. Traffic signals shall not be shut down, put into a flashing mode, or new signals activated, unless approved by the Engineer. The Contractor shall request permission from the Engineer for traffic signal shut downs a minimum of five (5) working days in advance and for turn ons a minimum of ten (10) working days in advance of the proposed turn on. Any work that is planned to be done within a signalized intersection, including but not limited to traffic signal shut downs and turn ons, shall require the presence of Campbell police officers, unless otherwise authorized in writing by the Engineer. The cost of providing the required officers shall be borne by the Contractor. The Contractor shall provide a written request for police officer assistance to the Engineer a minimum of five (5) working days in advance of any Technical Provisions - City of Campbell 17 DRAFT SECTION 21 SUBGRADE PREPARATION 21.05 ComDaction - The third paragraph of Section 21-1.05 "Compaction" of the SJSS is amended to read. Compaction testing on City projects shall be arranged for by the City. The Contractor shall notify the Engineer 48 hours in advance of requesting compaction tests. The City will pay for all passing tests. All costs for failing tests or tests that had to be rescheduled because the Contractor was not ready shall be deducted from monies due to the Contractor. Compaction tests for all City issued permit related work shall be arranged for and paid for by the perminee. Passing compaction test results certified by a licensed laboratory will be required for all permit work, unless otherwise approved by the Engineer. Results shall be delivered to the Engineer prior to placement of any subsequent layers. SECTION 26 AGGREGATE BASES 26-1.01 DescriDtion - The last sentence of Section 26-1.01 "Description" of the SJSS is hereby amended as follows. Unless otherwise specified, aggregate base shall be Class 2, 1-112" maximum gradation. 26-1.05 ComDactine: - The following is hereby added to Section 26-1.05 "Compacting" of the SJSS. Unless otherwise specified. the relative compaction for all aggregate base shall be 95%. SECTION 39 ASPHALT CONCRETE 39-1.01 the SJSS. DescriDtion - The following is hereby added to Section 39-1.01 "Description" of Technical Provisions - City of Campbell 19 DRAFT SECTION 56 SIGNS 56-2.01 Description - The first paragraph of Section 56-2.01 "Description" of the SJSS is hereby deleted and replaced with the following. Unless otherwise shown on the plans or specified in the special provisions, all sign panels, fastening hardware, and poles shall be furnished and installed by the Contractor. All sign poles shall be 2" inside diameter galvanized unpainted pole unless otherwise specified on the plans or in the special provisions. Signs shall be mounted to have the following vertical clearances unless otherwise specified on the plans or in the special provisions: Reflectors - l' "ONE-WAY" signs in islands - 1 1/2' "DO NOT ENTER" signs - 2' Other signs in islands - 4' Street name signs Mounted independently - 7' Mounted above stop sign - 10' All other roadside or streetside signs - 7' SECTION 73 CONCRETE CURBS AND SIDEWALKS 73-1.05F Backfilline: - The following sentence is hereby added to Section 73.1 05F "Backfilling" of the SJSS. Suitable material shall be as indicated in the special provisions, or as approved by the Engineer. SECTION 84 TRAFFIC STRIPES AND PAVEMENT MARKINGS 84-1.02 Control of Alignment and Lavout - The following is hereby added to Section 84-1.02 "Control of Alignment and Layout" of the S5. Technical Provisions - City of Campbell 21 DRAFT markings shall be removed on the same day that the new stripes are placed. After painting the new striping and markings, the previous striping and markings shall be removed by sandblasting Sandblasting equipment shall be equipped with a vacuum to remove all sandblasted material and a shield to minimize the emission of particles and dust. All sandblasted areas shall be slurry sealed to limits specified below: lane lines - 2' on either side of lane line pavement markings - 2' beyond top, bottom, and sides of marking All holes left from marker removals shall also be filled by the Contractor. SECTION 86 SIGNALS. LIGHTING AND ELECTRICAL SYSTEMS 86-1.05 Maintainine Existine and TemDorarv Electrical Systems - Section 86-1.05 "Maintaining Existing and Temporary Electrical Systems" of the SJSS is hereby amended as follows. All references to 24 hour advance notification shall be changed to read 48 hour advance notice, unless otherwise amended below. The Contractor shall request, in writing, approval from the Engineer of the time and date for - traffic signal activations or shutdowns a minimum of ten (10) working days prior to requested date of activation. Attention is also directed to Section 12 "Construction Area Traffic Control Devices" of these standard specifications for additional requirements. Any damage causing signal shutdown shall be the Contractor's responsibility. The Contractor, at their sole expense, shall restore the signal operation within 30 minutes. During the shutdown, the Contractor shall pay for all traffic control costs, including control devices and the time of all City staff, including but not limited to maintenance crews and Campbell pollee officers as determined necessary by the Engineer. If the Contractor fails to restore the signal operation within 30 minutes, the City will restore the signal operation at the Contractor's expense. The City shall charge the Contractor for the cost of performing the work by deducting this cost from payments due or to become due to the Contractor as these costs are incurred by the City. The Contractor, at their sole expense, shall permanently repair the signal to the current City standards and to the Engineer's satisfaction within 24 hours. If the Contractor fails to repair the signal facility within 24 hours, the City will repair the signal facility at the Contractor's expense. Technical Provisions - City of Campbell 23 DRAFT Unless otherwise approved by the Engineer, conduit crossing the roadway shall be installed under existing pavement stripes. Contractor shall restripe the removed pavement markings using the same materials as the removed unless otherwise directed by the Engineer. Conduit installation shall be in accordance with the City of Campbell Details for Signal, Lighting and Electrical Conduit Installation, unless otherwise specified on the plans or in the special provisions. All conduits entering foundations for standards and cabinets shall be GRS unless otherwise specified on the plans or in the special provisions. 86-2.06B Cover Markine:s - In all instances, replace "CSJ" with "CAMPBELL". 86-2.09C Connectors and Terminals - Section 86-2.09C "Connectors and Terminals" of the SJSS is hereby deleted and replaced with the following: Connectors and terminals shall conform to Section 86-2.09C of the SS and to the following: All conductors no. lOA WG or smaller which are to be installed on a field wiring terminal block in the cabinet and all solid conductors which are to be installed on any terminal block in the cabinet shall be fitted with a medium length, spring spade type connector (Hollingsworth #5520891B or SS20830B or approved equal). The connector shall be crimped and then soldered to the conductor. Open flame soldering will not be permitted. 86-2.09E Splice Insulation - Section 86-2.09E "Splice Insulation" of the SJSS is hereby deleted and replaced with the following: Splice insulation shall conform to Section 86-2.09E of the SS and to the following: Heat shrinkable insulating tubing shall be applied after completion of the splicing procedure. Insulation over the splice connection shall consist of a heat shrinkable, mastic lined, heavy wall polyolefin cable sleeve, or cover, to which heat shall be applied at a temperature greater than 120 degrees C. with an electric hot air gun until the sleeve or cover shrinks and covers the connector and the mastic material has flowed completely around and between the conductor(s) to form a waterproof insulation. The conductor insulation shall not be damaged due to application of the heat shrinkable insulation sleeve. The proper diameter of the insulation sleeve shall be used as recommended by the manufacturer for the splice to be insulated. Heat shrinkable tubing shall be T & B brand, "Shrink-Kon" series or approved equal. 86-2.09F Fused Splice Connector - The first sentence of the fifth paragraph of Section 86- 2.09F "Fused Splice Connector" of the SJSS is hereby deleted and replaced with the following. A fused disconnect splice connector shall be located in the pull box adjacent to the lighting standard when fed from underground wiring systems. Existing lighting standards which are Technical Provisions - City of Campbell 25 DRAFT Unless otherwise indicated on the plans or in the special provisions, service equipment shall be Type III-AF and shall conform to Section 86-2.11 "Service" of the SS and to Plan No. ES-2E of the State Standard Plans and to the following. The service equipment enclosure shall be fabricated from stainless steel. The pedestal shall be for 120/240 volt, 3 wire, single phase, metered and unmetered (split bus) service and the following circuit breakers and items shall be provided in the service pedestal: 1) MAIN breaker: 1 each 100 amp, 3 pole, 120/240 volt, split bus 2) SIGNAL breaker: 1 each 60 amp, 1 pole, 120 volt, metered 3) LIGHTING breaker: 1 each 40 amp, 2 pole, 240 volt, unmetered 4) LTG. CONTROL breaker: 1 each 15 amp, 1 pole, 120 volt, unmetered 5 AUX. breaker: I each 15 amp, 1 pole, 120 volt, metered 6) AUTO/TEST lighting test switch 7) Lighting contactor: 1 each, 2 pole, 240 volt, 120 volt coil, 60 amp rating per pole, mercury displacement type 8) PEC (photo electric control) field wire connection terminal block 86-2.16 Paintin2: - Unless otherwise indicated on the plans or in the special provisions, all signal and lighting standards shall be galvanized and shall not be painted. 86-~.05B Front Screen - The following is hereby added to Section 86-4.05B "Front Screen" of the SJSS. The pedestrian signal door shall not be plastic. 86-4.06 Si2:nal Mountine: Assemblies - The first paragraph of Section 86-4.06 "Signal Mounting Assemblies" of the SJSS is hereby deleted and replaced with the following. Signal Mounting Assemblies shall conform to section 86-4.06 "Signal Mounting Assemblies" of the SS and to the following. Terminal compartments, post top adapters and pole plates shall be cast bronze. "Clam shell" mounts shall not be used. Technical Provisions - City of Campbell 27 DRAFT 1301-1.6 Backfill and Surface Restoration Methods - The last sentence and Table 1301-1 of Section 13-1-1.6 "Backfill and Surface Restoration Methods" of the SJSS are hereby deleted and replace with the following. Backfill and surface restoration shall be per the City of Campbell Details unless otherwise specified in the special provisions. 1301-4.1.1 Type of Beddine: - Table 1301-2 of Section 1301-4.1.1 "Type of Bedding" of the SJSS is hereby amended to require Type A bedding for all sizes of concrete pipe. 1301-4.2 Backfill and Surface Restoration - The first paragraph of Section 1301-4.2 "Backfill and Surface Restoration" of the SJSS is hereby revised as follows. Surface restoration shall be in accordance with the City of Campbell Details, unless otherwise specified in the special provisions. 1301-4.2.1 Method A Backfill and Surface Restoration - The following is hereby added to the first paragraph of Section 1301-4.2.1 "Method A Backfill and Surface Restoration" of the SJSS. and the last two paragraphs of this section are hereby deleted. ... and (4) All emergency utility repairs. Restoration shall be in accordance with the City of Campbell Details for Method A Backfill and Surface Restoration, unless otherwise specified in the plans or special provisions. 1301-4.2.2 Method B Backfill and Surface Restoration - Section 1301-4.2.2 "Method B Backfill and Surface Restoration" of the SJSS is hereby deleted and replaced with the following. Method B backfill and surface restoration shall be used on all sewer and utility line trenches which are excavated in the general longitudinal direction of traffic and in areas outside of the traveled way. Restoration shall be in accordance with the City of Campbell Detail for Method B Backfill and Surface Restoration, unless otherwise specified in the plans or special provisions. Jetting shall not be allowed unless approved in writing by the Engineer. 1301-4.2.3 Method C Backfill - Section 1301-4.2.3 "Method C Backfill" of the SJSS is hereby deleted. 1301-4.2.6 Water Densified Backfill - The following sentence is hereby added to Section 1301-4.2.6 "Water Densified Backfill" of the SJSS. Jetting shall not be allowed unless approved by the Engineer or specified 10 the special prOVisIOns. Technical Provisions - City of Campbell 29 DRAFT DETAILS The City of San Jose Standard Details (SJSD) dated July 1992 are hereby incorporated with the following revisions and additions. SJSD # REVISION All All references to the City of San Jose shall be revised to read City of Campbell. All abbreviations "CSJ" shall be revised to read "CAMPBEL I ". R-2 Replace with City of Campbell Details 1 and 2. R-5, R-6. R-7 Replace with City of Campbell Details 3 and 4. R-8. R-9. R-IO, R-II Replace with CalTrans Standard Plans NSP A88 and A89. D-5 Replace with City of Campbell Detail 5. D-6 Replace with City of Campbell Detail 6. L-3 Quick coupling valve shall be installed below the finished grade in a pcc irrigation box. L-13 Tree planting shall conform to City of Campbell Details 12 and 13. L-14 Replace with City of Campbell Details 12 and 13. All W Details Delete. All E Details All references contained in the City of San Jose Electrical, Signals, and Lighting Details to octaflute standards shall be revised to read Type 15 standards (per CalTrans Standards Plans). Pull boxes are required at the base of all standards. All conduit entering foundations of controller cabinets, lighting standards, and signal standards shall be GRS. Details - City of Campbell 31 DRAFT E-36 Revise detail to remove connection between neutral and ground rod. Do not connect any neutral in any pull box to ground rod. All street lighting shall be 2-wire 240V. E-37 Delete notes 12 and 13. E-38 E-39 Delete Delete E-4l Delete item #15. (Do not splice service neutral to pole bonding system.) E-42 Delete item #22. (Do not splice neutral to pole bonding system.) E-43 E-44 E-45 Delete Delete Delete E-46 Conduit in standard foundation shall be GRS not PVC as shown. E-47 Conduit in standard foundation shall be GRS not PCGRS as shown. E-48 Delete #8 A WG neutral conductor from ground clamp up pole. (Do not bond pole to service neutral.) E-49 Conduit in standard foundation shall be GRS not PVC. E-50 Conduit in standard foundation shall be GRS not PCGRS. E-5l Conduit in cabinet foundation shall be GRS not Pvc. E-52 Conduit in cabinet foundation shall be GRS not PCGRS. E-53 Note 7 shall be replaced with the following: Fuses for individual street light fusing applications shall be general purpose, non-time delay types "BAF" or "BAN" and shall be rated 6A, 250V AC for 120V applications and 3A, 250V AC for 240V applications. Note 8 shall be replaced with the following: Details - City of Campbell 33 BOULEVARD WALK 7'- " cf W..; *<.:> 5iQ. c~ Q:Q. Z Q. w b <(<I: 4(0:: B~~ ><.> IIlW I WVl 0 ...JO cd= Z-. ~Z ~~ W N 0 al:s Uu "'..... J <(Z ~S;j 10'-0" 17'-Cf' 7'-!f 1'- 10'-0" :1 S-I/4" SECTION D D BOULEVARD v.NDSCAPING I'oS "Pf>ROVED BY THE ENGINEER. "5' ClASS III ~. BASE COMMERCIAL WALK * W..; u cf Zc :SiQ. J Z Q. W '0 <l:Q: B~~ I IIlw 0 o::~ Z-, ~~ W.....N ue.:> "'z <56 ~-, ~V1 <(z IllS ~Q. ~~ W ~8 ~~ u =w -Q. VlVl if')nO~ ~~ 1/2" - P.C~C. - ~8. SECTION C-C . _ INSTALL 4'S"XS' TREE WELLS WITH STREET TREES AT 40' O.C. BACK Of CURB W/IRRIGATION 'l 10'-0" 5'-0" UlL ;i:Q S2e z'" I' 3~ Ww ::; c' b I in 4'-6" PER FOOT - '0 I in W 0:: o U tfl "5' ClASS III AGG, BASE RESIDENTIAL SEPARATED WALK I , ,-'1 I[ 10'-0" 4'-6" "'" , I o~ w..; 4' -" aJ I -,1I1 of Ze aJ I:', /4" ~:R FO;TI ZW :SiQ. L "'''' ","'0:: J uC OVl..... Q. W '0 I:;? I ;..... Z O;.,W - ~'" "'-w..... "'a:: I "'0:: w,-.o ,..'2. :r:", <5E~ IIlW 0 Un. :0:: 0:::: Z-, - txv;- W N We.; b Q:.......... ::>::> :.:..... ::;1I1 <I:::>tfl ur.:> <l:Z <l:z I * ~~ 1Il<{ in 'S' Cl"SS III w-' .....Cl. :5 1/2" "GG. BASE C!~ W SECTION B-B Q:o OW INSTALL STREET TREES AT 0- ",\0 U ;w RESIDENTIAL MA;: ,;INAL WALK -Cl. III III I( ~~ 4'-6 10'-0" u r-'1 . r a:: 5'-0" \De <r' s'-Cf' w w' rl Q: of z~ <( <( CVl 0 ZW u SiQ. J L <l:W Vl Z Q. W '0 0:: '" ...JVl ) "'0:: o\oW o tfll- ",Q: IIlW I '"-!::it. <.>0 Q:~ w.......c b -..... Z-. <5!::W z'" ~~ W N :Q: <l:Q: '0 ue.:> ",I- "'.......... :I:", <5~ ",::>Vl UQ. I "5' CLASS III Ww ~~ * ::;Vl in AGG, BASE SECTION A-A . _ INSTALL STREET TREES AT 40' OC REVISED DATE JULY' 994 DRAWN BY _ CHECKED BY APPROVED CURB, GUTTER, AND SIDEWALK CG>JFIGURATIONS CITY OF CAMP==-LL DETAIL 1, ~.. ___ ... .-11 .... " - aM ... ~ ..... . 4'1.111 , CD" ..., - -- ., ,,~ _ ., "e- .., -'lflDL~. .tlIr- ..'ft.Y u~ aDIrDI . ..... II IAIM:II<< ~ DINDA\' ^ i I I ........ ..wA1W:N WI t1I U.-aL __ . It 1'hDILI.'IE'IIII1IflA1IIH ~ MAMIML ---. ~ .... ...,.,. ....., DlaWDAT 0f'DCII0 ~ (nE tAU"1II.OW) A ....-c ...- .uME .IllIIf fa .-z:!m C,r ...... ..... AIlIlOIt ~ II II!PMATD _Ill , If ~ IIDUI ....., t ~ MOU!' GL ~ 3/ CO '7'8 " LIt .. '" WMJC 'IV rI QIM ft.CIW LM or CIft"ID IDICDe fILME ..... ~ It (lIE WIDnl 1*1) .-tr ... UI:I w.x u~ 1D r Lr , , .,~..:'.'.'~.:~..~...'.'.',::.. '~.,..~.. .. '.. ,.. -:. ."~ ',: " ..'t .-:. ....: ',:._- ,'''.' .-:....: I.: II : . ,':, -'.' . . . .....~.... .~. I, .t ~ .... 1HE SIIIM-.r . NIT JIOUIlID Itt .... ,.. III CUll .. 8IInDo 11' " ... . .... /It .' IIflIIMU JIW,L . III'ttlU.ID AI...... .... 1V II EfT IlIlIIIt ,. WIDG WCII. \lID.) LAND USE COW..!ftCIAI. I: WIN wuLn-RESlDDmAL MAX SIHGLE-f'AWu..y M1H REStD[HTW. MAX ,'-ff \2'-" TO PROP. lJN[ WITH 1'-" ... .&aEIi -.-T APPItIMDD ~ -.& ~ ru-MlM~ 1,~1rIUC - f'MlUG aMI. lolL ..~ ~ 'RI asnNIl CIllICREJ ~ .uc MY 11M DIWIN I'n _ c:HECm "I ~I- DRIVEWAY APPROACH CITY OF CAMPBELL OEJAU. 3 A L <;,' ~\~. GRP-Dt: ,\0 Dtt/>.\~ BACK OF CURB TOP OF CURB FLOWLINE- WEAKENED PLANE JOINT UI WEAKENED PLANE JOI UP OF GUTTE B u~ B PLAN 4' 37 1/2" 4' 6" ~~ .~ 0 -=16 T FLOWUN~I 81( - FLOWUNE T NOTE:3 6" PHOENIX IRO!' WORKS N.O P-6301 FRAME AND GRATE P-6003 HOOD (OR APPROVED EQUAL) " 0 INDICATES STATION. GRADE. "- AND OFFSET POINT CLASS A PC.C CON:3TRUCT STEPS IN INLETS OVER 6" :3 FEET DEEP :. y~ -~ )jr-., . I /' . /1 . 6"--~\ :. . \ \ . \ " ./ ./ \ \ SECTION A-A WINTER TIME CONSTRUGTION: 3" DRAINAGE HOLE AT TO~ OF ROUGH GRADE. 18'~ PLUG WHEN CONSTRUCTION IS COMPLETE \ .. . .. . ~ 6" ,\~ SECTION B-B /, .// /'\ 6'-- SECTION C-C DRAINAGE INLET CITY OF CAMPBELL RE\1SED DATE: JULY 1994 DRA~~ BY ___CHECKED BY ___ APPROVED ___ DETAIL 5 CD 2" A.C. TYPE A 3/4" WAXlMUM MEDIUM 95'-; COMPACTION @ GRIND PAVEMENT KEY 2"-4" DEEP x 9"-12" WIDE 9" - 12" 2"-4" @ ~ ~ <1 ~ ~ <1 , PAVEMENT FABRIC OVER TRENCH (PETROTAC. PETROMAT OR EQUAL) W/TACK COAT EXISTING AC SECTION <1 <1 CD 2 SACK SAND/CEMENT SLURRY BACKFILL Ll~ <1 ~ L1 ~ <I Ll <J <J ./l CLASS 1 BEDDING (CLEAN SAND BEDDING SHALL BE USED AROUND GAS CONDUITS) ./l <J ........... , -.. - - - :- .. . ...... .... . - - -- .. . . .. . .. .- : - - - - - ./l ./l T 12" (TYPE A BEDDING) - o - - I- .. . . . - ... - . . .. . .. - - -.1 . . . .... . . .., - - - - - 1/8 D (4" MIN) TRENCH WIDTH 'D' PLUS 6" MIN 'D' PLUS 24" MAX CENTER PIPE IN TRENCH NOTES CD PLACE PERMANENT PAVEMENT WITHIN FIVE (5) DAYS Afi'ER BACKFILLING AN EXCAVATION (STEEL PLATING REQUIRED DURING CURING PERIOD OF 3 DAYS MIN. - 5 DAYS MAX.) @ IF EXISTING AC SECTION IS LESS THAN 4". GRIND AC KEY TO FULL DEPTH OF EXISTING AC AND REPLACE FULL DEPTH AC SECTION (MIN. 2") @) THIS DETAIL DOES NOT APPLY TO ELECTRICAL CONDUIT INSTALLATION REVISED DATE: JULY 1994 DRAW~ BY ___CHECKED BY ___ APPROVED ___ TRENCH RESTORATION METHOD A Backfill and Surface Restoration CITY OF CAMPBELL DETAIL 7 2 SACK SAND/CEMENT SLURRY BARRICADING REOUIRED DURING CURING PERIOD. PAVEMENT FABRIC OVER TRENCH (PETROMAT, PETROTAC, OR APPROVED EOUAl) EXISTING GRIND PAVEMENT KEY GUTTER r SECTION OVER TRENCH CD :. "" A "" A " A "" A "" :. "" A "" A 18" (mln) NOTES CD FOllOWING CONDUIT AND SLURRY INS~.':",-LATION, EXISTING AC PAVEMENT AND SLURRY TO BE GROUND AND REPLACED WITH PERMANENT AC SURFACE (1-1/2" A.C. - TYPE A 1/2" MAXIMUM, MEDIUM, 95% COMPACTION). EXISTING AC PAVEMENT BETWEEN LIP OF GUTTER AND TRENCH SHAll BE GROUND AND REPLACED WITH KEY CD PLACE PERMANENT AC PAVEMENT WiTHiN 10 DAYS OF TRENCHING. CONDUIT (MAX D = 4") PI ~; 1" MANUFACTURED CONDUIT CHAIRS (INSTAll BETWEEN CONDUITS iF IF MORE THAN ONE IN TRENCH) 'L D+2.J (6" MAX) NOT TO SCALE lEGEND D = CONDUIT OUTSIDE DIAMETER SIGNAL, LIGHTING, AND ELECTRICAL CONDUIT INSTAllATION TRENCH lAID CONDUIT-PAVEMENT AREAS CITY OF CAMPBEll DETAIL 9 REVISED DATE JULY ~994 DRAWN BY _ CHECKED BY APPROVED _ EXISTING SURFACE I~II.III.II...III..III..II...III..III..1 '8" (mini NOT TO SCALE 12" (min) 6" (min) ," lL D+2"J (6" MAX) COMPACTED NATIVE MATERIAL IN UNIMPROVED AREAS OR MATCH EXISTING MATERIAL IN LANDSCAPED AREAS 2 SACK SAND/CEMENT SLURRY CONDUIT (MAX D 4"1 J MANUFACTURED CONDUIT CHAIRS (INSTALL BETWEEN CONDUiTS IF IF MORE THAN ONE IN TRENCH) LEGEND D = CONDUIT OUTSIDE DIAMETER REVISED DATE: JULY 1994 LIGHTING, AND ELECTRICAL CONDUIT INSTAllATION UNIMPROVED lANDSCAPED AREAS CITY OF CAMPBEll SIGNAL, DRAWN BY _ CHECKED BY: APPROvE:' _ DETAIL 11 NOTES; (unless otherwise specified in the plans or special provisions) 1. All trees shall be 15-gallon size and of the variety indicated on the plans or specified by the City Engineer. 2. Each tree shall be approved by the Engineer prior to planting. Contractor may request Engineer to pre-approve tree at local nursery 3. The exact location of each tree shall be approved by the Engineer prior to planting. 4. Vertically cut the root ball at three or four places to loosen roots and discourage circling. Vertically scarify sides and bottom of planting hole 5. When planting. hold tree so that previous planting level is even with sidewalk level and gradually place top soil about the root ball. 6. When hole is three-quarters full. fill with water to compact the soil and eliminate air pockets. 7. Fill planting hole with loose soil to ground level. 8 Construct a watering basin around each tree as shown. 9. Planting operations must be followed by a deep, thorough watering of each tree. 10. Substitutions in tree varieties are permitted only upon writter authori- zatlOn from the City Engineer. 11. All street trees installed in commercial and industrial shall be installed with an irrigation system (fed from on-site). 12. Deep root barriers (Deep Root Partners Deep Root RB 24-2) or approved equal shall be installed at all tree planting locations adjacent to SIdewalk REVISED DATE: JULY 1994 DRAWN BY ___CHECKED BY ___ APPROVED STREET TREE PLANTING NOTES CITY OF CAMPBELL DETAIL 13 ~ i I I i I If'- ~') ~ ~ .& -~ " ~o u ~~ nil J; __ -e._ :!'O o i ,. ... !:i lTD. PLAN ..P AI' h ~ I' II i ~ ,.I i ,:': I'" lit it~ 21 SS. I ~I' J 'I,ll S S i J -I t. eO. .n!- '. .Ii :Jd!! ., i ~ uul. .!ill!' f,li ~,ii I..'! fJ U, I~! I. h~ I r f.<<:.f~ }51!t;11 nl~ ltif : I ~..I ")i" JI I J; III .,,11 i I '. E 1;. ,..j sld,:!t ill' d7 ~l.. ~tll I j ,.i::5; illqt 1511 hi} 12"1 JI", ItJ lelt I.!... r fl'i IJ~~ J. '~ idu :i;l: ~l! ~!!: Illi "I~ il!, i~ i I.tlt JI!iU:~ I: o. iii~1 ~,h: I.~ 'fl hs III Ih i;1 'If;hC 'jUJt.11 . ~21:~ a :;h,,:1I lelll ~~I hi ~n I!I: I~~HI: I:bllll J i! d;~1 i1.. 01 04 4 .. .. ,.:.... .. :!.. ~ ~~ : r n .. .. i I ... I c '5 :e i; ." ;; ., J ii · ." .. ,:.s; I -1 ~I: u. f t ct. ~ i ~ .S ~ ..., t . . .':l i . . j . !~ ~I I I: . . II ..... . .. . i . ,: ...-,r .. . !t H .. c 4>~ u tiA- I .. . i I .. :1 1:1 il.. . . t II .. . i ! iIIi"tr' ~.. ;Iii 1W1%"" .,~ ~i IH (u ..~ii IU. )..1 !:~ ;Ii .. . i ! .. I &'0. ,~ :I J eZ ~ ~i a: - ~ ~'" " . - 0 ~.. lICe z ~~ -~ .... - UI ; oD . . C .. . z z e -' .. D a: e D zr e ~ . -I Ii I, ~~I ".. . ,-j- .:l. . Hi ~ L . r . J~ =- UI Z ~~ . ., ~~ .~ -: lit So. ii ILd 11 : !;I Ii; a i I I :l I i I~ i !- , RESOLUTION NO. 8713 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL APPROVING AN AGREEMENT WITH ROBSHEAL STRATFORD PARTNERS, L.P., A CALIFORNIA LIMITED PARTNERSHIP, FOR CONSTRUCTION OF IMPROVEMENTS AT 710 W. SUNNYOAKS AVENUE, TRACT 8624; AUTHORIZING A NOTICE OF RELEASE OF AGREEMENT WITH KT SUNNYOAKS ASSOCIATES, L.P., A CALIFORNIA LIMITED PARTNERSHIP; AND ACCEPTING A PUBLIC STORM DRAIN EASEMENT WHEREAS, on December 13, 1993, the City Council approved the Final Map for Tract 8624 and an Agreement for construction of improvements by the developer, KT Sunnyoaks Associates, L.P., a California Limited Partnership, at 710 West Sunnyoaks Avenue; and WHEREAS, the current ownership of the property has changed from KT Sunnyoaks Associates, L.P., a California Limited Partnership, to Robsheal Stratford Partners, L.P., a California limited partnership; and WHEREAS, a change in the storm drain system design for the subject development requires the granting of a public easement; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Campbell hereby authorizes the Mayor to execute an agreement with Robsheal Stratford Partners, L.P., a California limited partnership, for construction of improvements at 710 W. Sunnyoaks Avenue. BE IT FURTHER RESOLVED that the City Council of the City of Campbell does hereby release the conditions of said Agreement executed by KT Sunnyoaks Associates, L.P., a California Limited Partnership, and does hereby authorize the Mayor to execute the Notice of Release on behalf of the City and authorizes the City Clerk to record the Notice subsequent to execution of the agreement with Robsheal Stratford Partners. BE IT FURTHER RESOLVED that the City Council of the City of Campbell hereby accepts a public easement for a storm drain system on said development at 710 W. Sunnyoaks Avenue and directs the City Clerk to record said easement. PASSED AND ADOPTED this 6th day of September, 1994, by the following roll call vote: AYES: NOES: ABSENT: Councilmembers: Conant, Ashworth, Burr, Dougherty, Watson Councilmembers: None Councilmembers: None A~T: /) ~.~.~ Anne Bybee, C y Clerk RESOLUTION NO. 8712 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL COMMENDING BILL HELMS FOR THIRTY YEARS OF SERVICE WHEREAS, Bill M. Helms was hired by the City of Campbell as a Civil Engineer Assistant on September 1, 1964; and WHEREAS, during his thirty years of service Bill Helms has held various positions including Assistant Civil Engineer, Associate Civil Engineer, Engineering Manager, Deputy Public Works Director, and Environmental Program Manager; and WHEREAS, Bill Helms has contributed significantly to the development of various projects in the City, including 900 E. Hamilton (Prometheus), storm water management, non- point source, ISTEA, Vasona Corridor, solid waste collection, Southern Pacific right-of-way negotiations; and WHEREAS, the City Council, on behalf of the citizens of Campbell and the employees of the City wish to express its appreciation to Bill Helms for thirty years of loyal and valuable service and best wishes to continued success and achievement. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Campbell declares Wednesday, September 14, 1994, Bill M. Helms Day in the City of Campbell. PASSED AND ADOPTED THIS 6th day of September, 1994, by the following roll call vote: AYES: Councilmembers: Conant, Ashworth, Burr, Dougherty, Watson NOES: Councilmembers: None ABSENT: Councilmembers: None ~ -- .-